This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Meta Project Anthem — Tulsa.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Meta
- Address and locality
- Near East 11th Street & 193rd East Avenue (Fair Oaks industrial park, East Tulsa) · Tulsa · Tulsa County · Oklahoma
- Official metro area
- Tulsa, OK
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 6 August 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000926
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Public Service Company of Oklahoma (PSO)
- Power source
- Mixed
- Cooling
- Closed-loop
- Land area
- 340 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: contested
- AI-use label (provider)
- confirmed
- Announced
- 2024
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- Tax Incentive District (TID) — 85% annual property tax exemption; 15% collected projected at ~$36 million to taxing entities (city of Tulsa, Wagoner County, Catoosa Public Schools, others) over 25-year incentive period · Tulsa, OK · 2024 Open cited source →
Provider notes
Energy. Meta committed to matching 100% of facility electricity use with clean energy added to the Oklahoma grid. Existing Oklahoma projects add 1,500+ MW of clean energy statewide (not facility-specific). Meta covers full energy costs directly via PSO utility bills; stated commitment to avoid ratepayer burden. Tulsa Metropolitan Utility Authority also listed as a utility partner (water/wastewater).
Water. Water-efficient closed-loop liquid-cooled system. Meta states zero water use for the majority of the year and a water-positive goal by 2030. Water restoration partnership with Phytech across ~1,500 acres targeting 50+ million gallons of annual water savings. Additional partnership with Tulsa Community Foundation on water stewardship. No reportedMgd figure confirmed.
Community. Tulsa City Council passed a 9-month moratorium on new data centers in March 2026 to evaluate ecological impact; Project Anthem was carved out as it was approved before the moratorium vote. Approximately a dozen protesters from Stop Data Colonialism coalition gathered at the April 21, 2026 groundbreaking, raising concerns about environmental impact, financial burden on nearby residents, and 'data colonialism.' Meta's water-neutrality claims challenged by protesters as corporate narrative. Councilor Christian Bengel voted for the moratorium while separately supporting Project Anthem. …
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Announced investment: The source note says no firm single investment figure is confirmed and that investment was meant to be omitted.
- Announced permanent jobs: The source note says the jobs figures are press-release approximations, not firm figures, and were meant to be omitted from numeric fields.
- Announced construction jobs: The source note says the jobs figures are press-release approximations, not firm figures, and were meant to be omitted from numeric fields.
What the source record says
Codename: Project Anthem (used in TMAPC filings; Meta confirmed publicly April 21, 2026). Meta's 28th US data center and 32nd globally; first in Oklahoma and first built within Tulsa city limits. Anchor tenant at Fair Oaks Innovation Park (a 2,000-acre campus) near 11th Street and Creek Turnpike, East Tulsa. Investment stated as 'more than $1 billion' by Meta — a floor figure only; PartnerTulsa estimates construction costs at ~$800M. investmentUsd omitted: no firm single confirmed figure. Facility size: 2+ million sq ft; completion targeted 2028; general contractor Fortis Construction. No facility-specific MW capacity disclosed; Meta separately adding 1,500+ MW of clean energy to the Oklahoma grid statewide. Jobs: Meta states 'more than 1,000 construction workers at peak' and 'approximately 100 permanent jobs' — approximations from press release, not firm figures; omitted from numeric fields. Phase 2 expansion (375 additional acres west of original parcel, developer Atmoss LLC) proposed but withdrawn March 2026 before city council vote. Coordinates approximate (near 11th St & Creek Turnpike, East Tulsa).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2024 · source-reported proposed
Preliminary plat filed with Tulsa Metropolitan Area Planning Commission as 'Project Anthem'; Meta identity not publicly confirmed at time of filing
- 2024 · source-reported permitted
Preliminary plat approved August 7, 2024 by TMAPC; developer entity listed as Atmoss LLC
- 2026 · source-reported under construction
Meta publicly confirmed as operator; groundbreaking ceremony held April 21, 2026 with Oklahoma Governor Kevin Stitt; completion targeted 2028
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Breaking Ground on a New AI-Optimized Data Center in Tulsa, Oklahoma · Meta (about.fb.com)
- Hello, Tulsa! — Meta Data Centers · Meta (atmeta.com)
- Meta Breaks Ground on New $1 Billion Data Center in Tulsa · Oklahoma Department of Commerce
- Meta's east Tulsa data center earns praise and protests · Tulsa Flyer
- 340-acre data center campus planned in Tulsa, Oklahoma · Data Center Dynamics
- Gov. Stitt announces Meta behind Tulsa data center known as 'Project Anthem' · NewsOn6
- Meta confirmed as company behind Project Anthem · FOX23 News
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID meta-anthem-tulsa-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000926
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Near East 11th Street & 193rd East Avenue (Fair Oaks industrial park, East Tulsa), Tulsa, OK (Approximate location)
Roles
- Operator: Meta
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 2024
Provider-reported announcement date.
- Status history: 2024 · source-reported proposed
Status history supplied by the source.
- Status history: 2024 · source-reported permitted
Status history supplied by the source.
- Status history: 2026 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 340 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Public Service Company of Oklahoma (PSO)
Utility as named by the provider.
- Power source: Mixed
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Provider label: contested
Compute Atlas characterization, not a DataCenterData assessment.
- Incentive reported by the source: Tax Incentive District (TID) — 85% annual property tax exemption; 15% collected projected at ~$36 million to taxing entities (city of Tulsa, Wagoner County, Catoosa Public Schools, others) over 25-year incentive period · Tulsa, OK · 2024
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-08-06
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.