Core Scientific Muskogee Campus

source-reported under construction

Core Scientific

1525 West 43rd Street South · Muskogee · Muskogee County · Oklahoma · 74401

Reported planned 1,000 MWReported operational 70 MWSource updated 14 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Core Scientific Muskogee Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Core Scientific
Address and locality
1525 West 43rd Street South · Muskogee · Muskogee County · Oklahoma · 74401
Official metro area
Outside an official metropolitan boundary
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Operational: 70 MW; Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
14 September 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000315

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
OG&E (Oklahoma Gas & Electric)Utility as named by the provider.
Power source
GridProvider label.
Land area
250 acres (source-reported; parcel boundary not established)
Announced investment
$4 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
150 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: supportedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.

Provider notes

Energy. Grid power via OG&E is the defining arrangement. Core Scientific's Muskogee campus (the 100MW CoreWeave-anchor HPC facility, ~70MW critical IT load) and the adjacent Polaris DS acquisition are both served by OG&E electric service agreements totaling up to 440MW gross power under contract.

Community. Oklahoma Governor Stitt is quoted (2026-05-06 release) praising the expansion and the state's behind-the-meter legislation as enabling it. No resident opposition, hearings, or independent local-news coverage was checked -- this reflects state-official/company-sourced reaction only, from the operator's own press release.

What the source record says

1525 W Smith Ferry Rd, Port Muskogee Industrial Park. Distinct from the existing tracked Google Muskogee County campuses - same county, different developer/site. Coordinates are approximate. CoreWeave is the anchor customer.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-04 · source-reported operational

    Initial 100MW (70MW critical IT) phase delivered Q2 2026.

    Open cited source →

  2. 2026-07 · source-reported under construction

    Second 82.5MW building under construction; expansion plan targets ~1.5GW gross power (~1.0GW leasable), including a pending acquisition of Polaris DS LLC (440MW OG&E contract).

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID core-scientific-muskogee-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by Core Scientific on its website (captured 26 September 2026)
Name as listed
Muskogee 1
Address as published
1525 West 43rd Street South, Muskogee, OK 74401

Lifecycle status is not published for this listing.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Open the operator’s page → captured 26 September 2026

Matched to this licensed row on identical full street address.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000315

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • 1525 West 43rd Street South, Muskogee, OK 74401 (Approximate location)

Roles

  • Operator: Core Scientific

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026-04 · source-reported operational

    Status history supplied by the source.

  • Status history: 2026-07 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 250 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Operational: 70 MW; Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: OG&E (Oklahoma Gas & Electric)

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $4 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 150 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: supported

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-14

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →