Licensed lead · not independently verified · dcd-dir-000144

AWS Hobart Campus

source-reported under construction

Amazon Web Services

Hobart · Lake County · Indiana

Capacity not established; source review excludes the published figureSource updated 16 August 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for AWS Hobart Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Amazon Web Services
Address and locality
Hobart · Lake County · Indiana
Official metro area
Chicago-Naperville-Elgin, IL-IN
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Not established; source review excludes the published figure
Source freshness
16 August 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000144
Capacity held out of the public projection.

The source note identifies 2.4 GW as a Northwest Indiana regional total, not Hobart-specific capacity. The upstream row remains attributed below, but this value is not repeated as site capacity.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
NIPSCOUtility as named by the provider.
Power source
GridProvider label.
Cooling
HybridProvider label.
Land area
725 acres (source-reported; parcel boundary not established)
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment.
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
24 November 2025Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

Provider notes

Energy. NIPSCO (GenCo, Merrillville); Amazon pays 100% of new power-infrastructure costs under a cost-allocation framework.

Water. Outside-air cooling ~98% of the year; water-based cooling on peak days (~2%); ~14 million gallons/year; ~80% more water-efficient than industry average.

Community. Active opposition group 'No Data Centers Hobart Indiana'; majority of Plan Commission testimony opposed; concerns include noise, light, water/power use, property values; lawsuit filed in Lake County Court. Neighboring NWI communities have rejected similar projects.

What the source record says

One of AWS's Northwest Indiana campuses (part of a $15B NW Indiana / 2.4 GW umbrella; distinct from aws-project-rainier-new-carlisle-in and the separate Wheatfield IN campus). CAPACITY OMITTED: the 2.4 GW figure is the NW Indiana total, not Hobart-specific. INVESTMENT OMITTED: $15B is the NW Indiana total, no Hobart-specific figure. Up to 25 buildings on 725+ acres ('Hobart Tech Park'); shell entities include Hobart Devco, Hobart Owner LLC, TUHAUS LLC/Wylie Capital. ~400 permanent jobs ($37-44/hr) are projections (in notes, not jobs). $47M upfront community payment is city revenue, not facility capex. Coordinates estimated from 61st Ave/Colorado St; verify via Lake County GIS. Active litigation: 'No Data Centers Hobart Indiana' sought a TRO on the fill permit (unresolved).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-11-06 · source-reported permitted

    Fill permit approved for Hobart Devco prior to public announcement

  2. 2025-11-24 · source-reported proposed

    Amazon publicly announces a $15B NW Indiana investment; Hobart city agreement announced the next day

  3. 2026-05-08 · source-reported permitted

    Hobart Plan Commission approves site plans after majority-opposition testimony

  4. 2026-06 · source-reported under construction

    Development begun; spring 2026 groundbreaking confirmed active per press

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aws-hobart-in. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000144

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Hobart, IN · Lake (Approximate location)

Roles

  • Operator: Amazon Web Services

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 24 November 2025

    Provider-reported announcement date.

  • Status history: 2025-11-06 · source-reported permitted

    Status history supplied by the source.

  • Status history: 2025-11-24 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-05-08 · source-reported permitted

    Status history supplied by the source.

  • Status history: 2026-06 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 725 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not established; source review excludes the published figure

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: NIPSCO

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Hybrid

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: 10-year real property tax abatement - Amazon Data Services (Resolution 2026-02)

    Whether the incentive was approved, awarded or received is not established.

  • Incentive reported by the source: 35-year 100% IT-equipment tax exemption - Hobart Owner LLC (Resolution 2026-03)

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-16

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →