This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Aligned ORD-03.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Aligned Data Centers
- Address and locality
- 50 NW Point Blvd. · Elk Grove Village · Cook County · Illinois · 60007
- Official metro area
- Chicago-Naperville-Elgin, IL-IN
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 12 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000044
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Cooling
- Closed-loop
- Land area
- 36 acres (source-reported; parcel boundary not established)
- Announced investment
- $285 million
- Announced jobs
- 21 permanent
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- Illinois Data Center Investment Program · Illinois · 2023 · $17,812,500 (as stated) Open cited source →
Provider notes
Water. Aligned's ORD campuses use Delta3 air cooling arrays on a closed-loop chilled water system with near-zero WUE.
What the source record says
Aligned's third Chicago campus and its first in Elk Grove Village (36 acres, Tier III). STATUS IS PROVISIONAL: the operator page lists the campus without a delivery or in-service date, so under_construction is an inference — confirm against a delivery announcement before publishing.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-08-17 · source-reported under construction
Listed on Aligned's Chicago campus page with specifications but no in-service date
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Aligned Data Centers — Chicago (ORD) campuses · Aligned Data Centers
- Data Center Investment Program 2025 Annual Report — Aligned Data Centers (EGV) PropCo, LLC, Elk Grove Village (2023 MOU) · Illinois Department of Commerce and Economic Opportunity
- Sustainable, AI-Ready Data Centers in Chicago, IL — ORD-03 (50 NW Point Blvd, Elk Grove Village) specifications · Aligned Data Centers
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aligned-ord-03-elk-grove-village-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
Operator’s own listing
What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.
- Name as listed
- ORD-03 Data Center
- Operator’s facility code
- ORD-03
- Address as published
- 50 NW Point Blvd., Elk Grove Village, IL 60007
Lifecycle status is not published for this listing.
Aligned Data Centers · ORD-03 — Additional operator-reported details
Company-level claims — not verified for this facility.
- Certification or compliance claim: Company states SOC 2 Type 2 attestation
Company-reported. Not independently verified.
A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-19; this is not the source capture date and not a validity period.
Open cited source → - Certification or compliance claim: Company states PCI DSS compliance
Company-reported. Not independently verified.
A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-19; this is not the source capture date and not a validity period.
Open cited source → - Certification or compliance claim: Company states HIPAA compliance
Company-reported. Not independently verified.
A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-19; this is not the source capture date and not a validity period.
Open cited source → - Certification or compliance claim: Company states HITECH compliance
Company-reported. Not independently verified.
A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-19; this is not the source capture date and not a validity period.
Open cited source → - Certification or compliance claim: Company states NIST 800-53 compliance
Company-reported. Not independently verified.
A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-19; this is not the source capture date and not a validity period.
Open cited source → - Certification or compliance claim: Company states ISO 27001 certification
Company-reported. Not independently verified.
A company-level statement, not verification for this facility. This company statement is not an issuer confirmation or verification of this facility. DCD evaluated this claim on 2026-10-19; this is not the source capture date and not a validity period.
Open cited source →
Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
State or local registry record
What a state or local government record says naming this company in this city (no street is given in the record). The record is cited, not republished. It does not establish that a data center is operating, its capacity, or its owner or operator unless the record says that role. It is not added to the counts on this page.
Matched by name and city only. The government record names Aligned Data Centers (EGV) PropCo, LLC in Elk Grove Village and gives no street. It is shown here because this is the only published record with that name in that city; it may concern another site of the same company there.
Aligned Data Centers (EGV) PropCo, LLC
- Publishing agency
- Illinois Department of Commerce and Economic Opportunity
- Record type
- state certification list
- Named in the record
- Aligned Data Centers (EGV) PropCo, LLC
- Location precision
- Elk Grove Village only
- Registry table row
- Row 20 on page 8 of Data Center Investment Program 2025 Annual Report, MOU table (Illinois DCEO)
- Company Name: Aligned Data Centers (EGV) PropCo, LLC
- Site Location: Elk Grove Village
- Year: 2023
What this record does not establish
- That a permit, certification, tax status, or application means an operating data center.
- Current IT capacity, utility load, or generation capacity.
- Who operates the site. A company named in the record is not the operator unless the record says so.
- Who owns the site.
- Cooling redundancy. Mentioned equipment is not a design rating.
- Whether the record covers one building, a campus, or a suite, beyond the unit label the record itself uses.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000044
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- 50 NW Point Blvd., Elk Grove Village, IL 60007 · Cook (Approximate location)
Roles
- Operator: Aligned Data Centers
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2026-08-17 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 36 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $285 million
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Announced jobs: 21 permanent
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Incentive reported by the source: Illinois Data Center Investment Program · Illinois · 2023 · $17,812,500 (as stated)
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-12
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.