This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Centersquare ORD2 (Elk Grove Village).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Centersquare (Csquare)
- Address and locality
- 2425 Busse Road · Elk Grove Village · Illinois · 60007
- Official metro area
- Chicago-Naperville-Elgin, IL-IN
- Source-reported status
- operational
- Provider facility type
- data center
- Reported capacity
- Operational: 25.9 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 15 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000225
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Announced jobs
- 20 permanent
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- Illinois Data Center Investment Program (sales/use tax exemption MOU) · Illinois · 2025 · $17,134,551 (as stated) Open cited source →
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Announced investment: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.
What the source record says
Operator lists ORD2 at 111,906 sq ft of raised floor and 25.9MW. The operating entity has changed hands and names repeatedly (Cyxtera/Evoque → Centersquare → Csquare); the DCEO MOU is held by 2425 Busse Road LLC and was amended in 2025 to add Centersquare MSA Holdings LLC. County omitted: the geocoder returns DuPage for this address while Elk Grove Village spans two counties. Coordinates geocoded from the published street address.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-08-31 · source-reported operational
Listed as a live Chicago-market facility on the operator's own locations page.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Csquare (Centersquare) Chicago data centers — ORD1, ORD2, ORD4 · Csquare / Centersquare
- Data Center Investment Program 2025 Annual Report (2425 Busse Road LLC (CenterSquare ORD2), Elk Grove Village, 2025 MOU) · Illinois Department of Commerce and Economic Opportunity
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID centersquare-ord2-elk-grove-village-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
Operator’s own listing
What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.
- Name as listed
- ORD2
- Operator’s facility code
- ORD2
- Address as published
- 2425 Busse Road, Elk Grove Village, IL 60007
Lifecycle status is not published for this listing.
Utility power: 25.9 MW.
Tier: Tier III (operator wording: certified).
Centersquare · ORD2 — Additional operator-reported details
- Carrier neutrality: Company states the site is carrier-neutral
Company-reported. Not independently verified.
Open cited source →
Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
State or local registry record
What a state or local government record says naming this company in this city (no street is given in the record). The record is cited, not republished. It does not establish that a data center is operating, its capacity, or its owner or operator unless the record says that role. It is not added to the counts on this page.
Matched by name and city only. The government record names 2425 Busse Road LLC (CenterSquare ORD2) in Elk Grove Village and gives no street. It is shown here because this is the only published record with that name in that city; it may concern another site of the same company there.
2425 Busse Road LLC (CenterSquare ORD2)
- Publishing agency
- Illinois Department of Commerce and Economic Opportunity
- Record type
- state certification list
- Named in the record
- 2425 Busse Road LLC (CenterSquare ORD2)
- Location precision
- Elk Grove Village only
- Registry table row
- Row 29 on page 9 of Data Center Investment Program 2025 Annual Report, MOU table (Illinois DCEO)
- Company Name: 2425 Busse Road LLC (CenterSquare ORD2)
- Site Location: Elk Grove Village
- Year: 2025
What this record does not establish
- That a permit, certification, tax status, or application means an operating data center.
- Current IT capacity, utility load, or generation capacity.
- Who operates the site. A company named in the record is not the operator unless the record says so.
- Who owns the site.
- Cooling redundancy. Mentioned equipment is not a design rating.
- Whether the record covers one building, a campus, or a suite, beyond the unit label the record itself uses.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000225
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- 2425 Busse Road, Elk Grove Village, IL 60007 (Approximate location)
Roles
- Operator: Centersquare (Csquare)
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported operational
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2026-08-31 · source-reported operational
Status history supplied by the source.
Power capacity
- Reported capacity: Operational: 25.9 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Announced jobs: 20 permanent
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Incentive reported by the source: Illinois Data Center Investment Program (sales/use tax exemption MOU) · Illinois · 2025 · $17,134,551 (as stated)
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-15
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.