project · TX · last checked 19 September 2026

Microsoft Corporation (SAT 89-90)

Lifecycle label: unknown; effective date not established Status evidence: Texas Comptroller qualifying large-project list retrieved 19 September 2026; TDLR TABS project TABS2025012765 retrieved the same day Evidence: Independently source-linked Reuse: Reference only

Facts at a glance

Record ID
microsoft-corporation-sat-89-90-tx
Record type
project
Developer
Not named in the cited records
Operator
Microsoft Corporation
Owner
Microsoft Corporation
Tenant
Not named in the cited records
Capacity
Unknown No independently supported figure
No selected Comptroller or TDLR record states critical-IT or other MW. TDLR estimated cost and 489,400 square feet gross building area are not IT load and are not published as capacity.
Location
2995 US HWY 90 W, Castroville, TX
County: Medina County
exact — TDLR TABS location. The Comptroller list row does not publish an address.
Physical scale
Physical scale: TDLR TABS scope describes construction of two single-story data-center buildings, each containing five colos, plus associated campus site construction, and approximately 489,400 square feet gross building area. That is registered design scope, not occupied white space, a counted campus identity, or IT load.

What the sources support

The Texas Comptroller's registered qualifying large data-center projects list includes Microsoft Corporation (SAT 89-90) with effective date 04/04/2024 and names Microsoft Corporation as owner, occupant and operator under registration LD772702. TDLR TABS project TABS2025012765 registers SAT89/90 Data Center at 2995 US HWY 90 W, Castroville, Medina County, as new construction of two single-story data-center buildings plus associated campus site construction. TABS Current Status is Review Complete, which is accessibility plan review, not a finding that construction has started or finished. These records support a named project identity, address and tax-program owner/operator labels. They do not establish a current lifecycle stage, a campus as a separate counted unit, or any IT-load figure.

Definitions: record units · roles · capacity boundaries · lifecycle stages.

What remains unknown

Sources

Record history

Record history · 4 April 2024 · DataCenterData review

microsoft-corporation-sat-89-90-tx → Record

Why Comptroller list effective date for Microsoft Corporation (SAT 89-90) as a qualifying large data-center project.

Evidence No additional evidence link; see the linked record or claim.

Record history · 25 February 2025 · DataCenterData review

microsoft-corporation-sat-89-90-tx → Record

Why TDLR TABS registration date for SAT89/90 Data Center.

Evidence No additional evidence link; see the linked record or claim.

Data + actions

Permanent link for citing this record →

Suggest a correction → Record ID microsoft-corporation-sat-89-90-tx and the page are prefilled. Accepted material corrections appear on Changes.