Pennsylvania index · last changed 1 November 2026

Pennsylvania data centers: what the public record shows.

Selected source-linked records are published below. This is not a complete inventory of Pennsylvania data centers.

21 sourced policy records for Pennsylvania ↓Facility register: 89 records · by county →1 published DataCenterData record · evidence status shown per row65 licensed directory leads · not independently verifiedThese counts overlap and are not added together

Explore Pennsylvania

Map, listings and checked facts.

Start with 65 licensed source leads, then inspect the separate public-evidence layer below. Licensed rows are not independently verified and are not a statewide census.

Pennsylvania map

Reported locations in Pennsylvania

65 licensed rows · 55 source localities · 6 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby groupA number on a marker is the count of licensed rows it holds.Licensed layer only (Compute Atlas, source data through 14 October 2026). The interactive map lists 95 data-center source listings here across licensed, operator and DataCenterData layers (75 with a map point); 99 with government registry records. Source listings are not distinct sites.2 symbols are offset slightly for readability; thin connectors retain their projected anchors. Open the interactive map for source coordinates.
Browse 6 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

65 licensed rows53 reported city labels58 eligible organization labels

Browse all 65 rows below. Licensed rows are not independently verified and remain separate from the checked public-evidence layer.

  1. source-reported proposedReported planned 3,500 MWSource updated 21 September 2026approximate location
  2. source-reported proposedReported planned 496 MWSource updated 10 September 2026approximate location

Separate layer

Also listed by operators

Sites that operators list on their own websites and that are not rows in the licensed directory above. They are kept apart and never added to the licensed rows.

21 operator-listed sites (mixed units; not added to licensed rows) in Pennsylvania →

11 of these sites have no supported coordinate. The map does not invent a pin or a metro placement for them.

Pennsylvania evidence at a glance

A few checked sites

Selected public evidence, not a statewide census. Each row shows whether it is independently source-linked, attributed, or unresolved; licensed leads remain separate.

Published project / campus
1
Published facility / building
0
Attributed or unresolved rows
0
Licensed directory leads
65 not independently verified
Capacity boundary stated
0 of 1 published DataCenterData rows
Review timing
Audit through 12 September 2026 · next 12 March 2027
Known coverage gap

The Revenue reports name entities but no addresses, municipalities or counties, so most certifications cannot be bound to a site.

Browse all 65 Pennsylvania licensed leads → · Why these counts differ →

Projects

1 project record. Names are as they appear on each record page.

Projects published for Pennsylvania
Record / rolesStatusCapacity / scalePrimary evidence
Amazon Falls Township Data Center Project approvedproject · land-development approval only UnknownNo independently supported figureThe opened Township record publishes no critical-IT, facility-load, utility-service, utility-request, generation or measured-load MW. Amazon to Open Data Center at NorthPoint Development in Falls →Gov. record

Where the records were checked

Statewide audit pending

A few checked sites

This is not a list of every data center in the state, and the number here is not a count of them. There are almost certainly more.

Statewide coverage is not complete. The records below are sourced; a full statewide count has not been published.

State research audit window ended 12 September 2026. Individual records and claims below show their own evidence dates and may be newer.

Next scheduled coverage review: 12 March 2027.

1 independently source-linked project/campus record; 0 independently source-linked facility/building records; 0 attributed or unresolved rows. These counts use different units and must not be added together.

Source families checked, selected records and remaining gaps

These notes name selected records, say which kinds of public evidence were checked and show what remains missing. They do not add anything to the published counts.

Local evidence by place

Licensed and operator listings, reviewed records, answers and local policy for each place. Listings overlap and are not added; a place without a line here has no published local evidence.

No local evidence answer, reviewed record or local policy record is published for Aliquippa, Allen Township, Allentown, Archbald, Beccaria Township, Big Beaver, Boyers, Breinigsville, Norristown, Pittsburgh, Ransom Township, Salem Township. Their listings above are source listings to investigate. No statewide evidence answer is published for Pennsylvania either; statewide and utility-territory rules are under Policy tracker below.

1 Pennsylvania answer is not tied to a published record, so it is not placed here: Pennsylvania answers.

Policy tracker

Pennsylvania policy records

21 sourced records are associated with this state context. They are grouped below as current, pending and nonbinding, and history, and each card shows its relevant date. These are not facility counts and do not cover every locality.

Current 5 records

Recorded as in effect on the dataset date. This does not mean every project in a represented state is restricted or approved.

Enacted legislation or regulation

Revenue program guidelines add GRID consent-order condition

In effect · Pennsylvania · State

Effective: 18 August 2026

Issuing authority: Pennsylvania Department of Revenue

Pennsylvania's Department of Revenue guidelines for the computer data center equipment exemption program require, from 18 August 2026 and consistent with Executive Order 2026-05, that new applicants include a Department of Environmental Protection consent order and agreement implementing the GRID standards.

Read the sourced record · Primary source

Reporting or resource-use requirement

Annual data center energy and water reporting

In effect · Pennsylvania · State

Effective: 12 July 2026

Issuing authority: Pennsylvania General Assembly

Pennsylvania's Act 21 of 2026 requires data centers of 10 megawatts or greater peak demand to report their annual energy and water consumption to the Department of Environmental Protection, beginning with a report due 1 July 2027.

Read the sourced record · Primary source

Enacted legislation or regulation

PPL Rate Schedule LP-6 for large load (data center) interconnections

In effect · PPL Electric Utilities service territory, Pennsylvania · Utility territory

Effective: 1 July 2026

Issuing authority: PPL Electric Utilities Corporation (tariff filed with the Pennsylvania Public Utility Commission)

PPL Electric Utilities' Rate Schedule LP-6, in effect from 1 July 2026, is a distribution rate class for large load (data center) customers taking service at 69 kV or above with at least 50 MW at one facility or 75 MW in aggregate nearby.

Read the sourced record · Primary source

Incentive or explicitly supportive policy

Computer data center equipment sales and use tax exemption

In effect · Pennsylvania · State

Effective: 1 January 2022

Issuing authority: Pennsylvania General Assembly

Pennsylvania Act 25 of 2021 created a sales and use tax exemption, beginning 1 January 2022, for computer data center equipment bought for installation in a certified computer data center by its certified owner or operator or a qualified tenant.

Read the sourced record · Primary source

Pending or nonbinding 16 records

Adopted measures with unverified effect, adopted future measures, open proceedings, proposals, drafts and nonbinding context stay separate from current rules.

Legislation introduced (any outcome)

HB 2515 commercial data center energy, water and noise transparency bill (pending)

Proposed · Pennsylvania · State

Last checked: 3 November 2026

Issuing authority: Pennsylvania General Assembly

Pennsylvania House Bill 2515 would provide for commercial data center transparency regarding energy use, water use and noise pollution, with duties for the Department of Environmental Protection, the Department of Transportation and the Office of Attorney General and civil penalties.

Read the sourced record · Primary source

Legislation introduced (any outcome)

SB 1345 optional municipal moratorium on high impact data center applications (pending)

Proposed · Pennsylvania · State

Last checked: 3 November 2026

Issuing authority: Pennsylvania General Assembly

Pennsylvania Senate Bill 1345 would provide for an amendment to the Municipalities Planning Code, in zoning, providing for an optional temporary moratorium on acceptance or consideration of new applications for high impact data centers.

Read the sourced record · Primary source

Legislation introduced (any outcome)

SB 939 AI, data center and emerging technology regulatory sandbox bill (pending)

Proposed · Pennsylvania · State

Last checked: 3 November 2026

Issuing authority: Pennsylvania General Assembly

Pennsylvania Senate Bill 939 would provide for establishment of an Office of Transformation and Opportunity and an Artificial Intelligence, Data Center and Emerging Technology Regulatory Sandbox Program, including permits for high impact data centers that have their own power.

Read the sourced record · Primary source

Federal and multistate

Federal and multistate instruments that cover all or part of Pennsylvania

These federal, reliability-organization and multistate grid or utility instruments are stored once and listed for every jurisdiction they name. They do not add to the record count, in-effect total or map shading for Pennsylvania. Territorial coverage does not establish that an instrument applies to any particular site, utility or project.

Reporting or resource-use requirement · Listed coverage: part of Pennsylvania

PJM: Large Load definition and registry accepted by FERC; capacity and curtailment rules rejected (ER26-3515)

In effect · PJM region (multistate) · Regional grid

Effective: 12 October 2026

Issuing authority: Federal Energy Regulatory Commission

On 9 October 2026 the Federal Energy Regulatory Commission accepted, effective 12 October 2026, PJM's definition of a Large Load at a cumulative peak of 50 MW and a Large Load Registry that requires load-serving entities to report on the Large Loads they serve, which the order says covers all such loads regardless of in-service date.

Read the sourced record · Primary source

Open the Pennsylvania policy comparison

Review dates: the 21 Pennsylvania records were last checked 23 September 2026 to 3 November 2026. 6 scheduled reviews are overdue as of the tracker date 3 November 2026: Revenue program guidelines add GRID consent-order condition, Executive Order 2026-05 data center permitting and incentive conditions, Annual data center energy and water reporting, Computer data center equipment sales and use tax exemption, DEP template GRID consent order and agreement for data centers (model document) (last checked 23 September 2026, review due 23 October 2026); HB 1667 omnibus with data center incentive repeal (pending concurrence) (last checked 1 October 2026, review due 29 October 2026). Overdue means not re-read yet, not changed. No single record, and not this list, establishes complete statewide policy coverage.