Missouri data centers: what the public record shows.

Selected source-linked records are published below. This is not a complete inventory of Missouri data centers.

7 sourced policy records for Missouri ↓Facility register: 37 records · by county →1 published DataCenterData record · evidence status shown per row19 licensed directory leads · not independently verifiedThese counts overlap and are not added together

Explore Missouri

Map, listings and checked facts.

Start with 19 licensed source leads, then inspect the separate public-evidence layer below. Licensed rows are not independently verified and are not a statewide census.

Missouri map

Reported locations in Missouri

19 licensed rows · 12 source localities · 3 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby groupA number on a marker is the count of licensed rows it holds.Licensed layer only (Compute Atlas, source data through 14 October 2026). The interactive map lists 38 data-center source listings here across licensed, operator and DataCenterData layers (26 with a map point); 42 with government registry records. Source listings are not distinct sites.
Browse 3 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

19 licensed rows12 reported city labels17 eligible organization labels

Browse all 19 rows below. Licensed rows are not independently verified and remain separate from the checked public-evidence layer.

  1. source-reported permittedReported planned 120 MWSource updated 13 October 2026approximate location
  2. source-reported under constructionCapacity not statedSource updated 7 July 2026approximate location

Separate layer

Also listed by operators

Sites that operators list on their own websites and that are not rows in the licensed directory above. They are kept apart and never added to the licensed rows.

14 operator-listed sites (mixed units; not added to licensed rows) in Missouri →

7 of these sites have no supported coordinate. The map does not invent a pin or a metro placement for them.

Missouri evidence at a glance

A few checked sites

Selected public evidence, not a statewide census. Each row shows whether it is independently source-linked, attributed, or unresolved; licensed leads remain separate.

Published project / campus
1
Published facility / building
0
Attributed or unresolved rows
0
Licensed directory leads
19 not independently verified
Capacity boundary stated
0 of 1 published DataCenterData rows
Review timing
Audit through 12 September 2026 · next 12 March 2027
Known coverage gap

No Missouri Works or Chapter 100 award list was opened, and no state data center sales tax exemption register was located.

Browse all 19 Missouri licensed leads → · Why these counts differ →

Projects

1 project record. Names are as they appear on each record page.

Projects published for Missouri
Record / rolesStatusCapacity / scalePrimary evidence
Rifle Range Road Data Center Project constructionproject · county-reported · 21 May 2026 UnknownNo independently supported figureThe opened County update publishes no critical-IT, facility-load, utility-service, utility-request, generation or measured-load figure. Webster County Commission — Data Center Update — May 21 →Gov. record

Where the records were checked

Statewide audit pending

A few checked sites

This is not a list of every data center in the state, and the number here is not a count of them. There are almost certainly more.

Statewide coverage is not complete. The records below are sourced; a full statewide count has not been published.

State research audit window ended 12 September 2026. Individual records and claims below show their own evidence dates and may be newer.

Next scheduled coverage review: 12 March 2027.

1 independently source-linked project/campus record; 0 independently source-linked facility/building records; 0 attributed or unresolved rows. These counts use different units and must not be added together.

Source families checked, selected records and remaining gaps

These notes name selected records, say which kinds of public evidence were checked and show what remains missing. They do not add anything to the published counts.

Local evidence by place

Licensed and operator listings, reviewed records, answers and local policy for each place. Listings overlap and are not added; a place without a line here has no published local evidence.

No local evidence answer, reviewed record or local policy record is published for Barnard, Festus, Liberty, Marshfield, New Florence, Saint Louis, Troy, Villa Ridge, Warrenton. Their listings above are source listings to investigate. No statewide evidence answer is published for Missouri either; statewide rules are under Policy tracker below.

1 Missouri answer is not tied to a published record, so it is not placed here: Missouri answers.

Policy tracker

Missouri policy records

7 sourced records are associated with this state context. They are grouped below as current, pending and nonbinding, and history, and each card shows its relevant date. These are not facility counts and do not cover every locality.

Current 5 records

Recorded as in effect on the dataset date. This does not mean every project in a represented state is restricted or approved.

Permanent restriction or prohibition · St. Louis only (local rule)

St. Louis: no city tax incentives for data centers (Ordinance 72182)

In effect · City of St. Louis, Missouri · Local

Effective: 17 September 2026

Issuing authority: Board of Aldermen of the City of St. Louis

The City of St. Louis adopted Ordinance 72182, from Board Bill 55, which adds definitions and a section to Chapter 3.160 of the Revised Code prohibiting the award of tax incentives to data centers.

Read the sourced record · Primary source

Incentive or explicitly supportive policy

Data storage center sales and use tax exemption

In effect · Missouri · State

Effective: 28 August 2018

Issuing authority: Missouri General Assembly

Missouri's data storage center exemption, RSMo 144.810, lets qualifying new, expanding and replacement data storage center projects receive a sales and use tax exemption after Department of Economic Development approval.

Read the sourced record · Primary source

Pending or nonbinding 2 records

Adopted measures with unverified effect, adopted future measures, open proceedings, proposals, drafts and nonbinding context stay separate from current rules.

Local construction moratorium · Independence only (local rule)

Independence: 180-day pause on new data center and battery storage permits and applications

Adopted; effective status unverified · Independence, Missouri · Local

Adopted: 6 July 2026

Issuing authority: Independence City Council

The City of Independence announced on 6 July 2026 that its City Council approved a 180-day moratorium on accepting, processing and issuing certain city permits, licenses and applications for new data centers and battery energy storage system facilities.

Read the sourced record · Primary source

Legislation introduced (any outcome) · St. Louis only (local rule)

St. Louis: proposed data center environmental monitoring (Board Bill 48)

Proposed · City of St. Louis, Missouri · Local

Last checked: 3 November 2026

Issuing authority: Board of Aldermen of the City of St. Louis

Board Bill 48 in the City of St. Louis, titled Data Center Environmental Impact Monitoring, would set up a mandatory environmental monitoring and reporting program for data center buildings.

Read the sourced record · Primary source

Federal and multistate

Federal and multistate instruments that cover all or part of Missouri

These federal, reliability-organization and multistate grid or utility instruments are stored once and listed for every jurisdiction they name. They do not add to the record count, in-effect total or map shading for Missouri. Territorial coverage does not establish that an instrument applies to any particular site, utility or project.

Enacted legislation or regulation · Listed coverage: part of Missouri

Southwest Power Pool: Conditional High Impact Large Load Service accepted by FERC (ER26-1323)

In effect · Southwest Power Pool region (multistate) · Regional grid

Effective: 1 July 2026

Issuing authority: Federal Energy Regulatory Commission

On 5 June 2026 the Federal Energy Regulatory Commission accepted Southwest Power Pool tariff revisions, effective 1 July 2026, that add Conditional High Impact Large Load Service, a non-firm transmission service that can serve a large load such as a data center before long-term firm service is available, for up to seven years and subject to curtailment.

Read the sourced record · Primary source

Enacted legislation or regulation · Listed coverage: part of Missouri

Southwest Power Pool: High Impact Large Load study processes accepted by FERC (ER26-247)

In effect · Southwest Power Pool region (multistate) · Regional grid

Effective: 15 January 2026

Issuing authority: Federal Energy Regulatory Commission

On 14 January 2026 the Federal Energy Regulatory Commission accepted Southwest Power Pool tariff revisions, effective 15 January 2026, that add a High Impact Large Load study process and a generation assessment for those loads.

Read the sourced record · Primary source

Open the Missouri policy comparison

Review dates: the 7 Missouri records were last checked 22 September 2026 to 3 November 2026. 2 scheduled reviews are overdue as of the tracker date 3 November 2026: Missouri PSC approval of Evergy large load power service plan, Data storage center sales and use tax exemption (last checked 22 September 2026, review due 22 October 2026). Overdue means not re-read yet, not changed. No single record, and not this list, establishes complete statewide policy coverage.