Vantage WA13

source-reported operational

Vantage Data Centers

2101 M Street NE · Quincy · Grant County · Washington · 98848

Reported operational 64 MWSource updated 5 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Vantage WA13.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Vantage Data Centers
Address and locality
2101 M Street NE · Quincy · Grant County · Washington · 98848
Official metro area
Outside an official metropolitan boundary
Source-reported status
operational
Provider facility type
data center
Reported capacity
Operational: 64 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
5 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001543

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Grant County PUDUtility as named by the provider.
Power source
HydroProvider label.
Cooling
Closed-loopProvider label.

Provider notes

Energy. Vantage says Grant County PUD's two large-scale hydroelectric dams produce an average of 1,050 MW annually and that hydro accounts for more than 66% of the utility's generation mix.

Water. Closed-loop air-cooled chiller system. Vantage reports the campus's closed-loop chilled-water design with air-side economizers brings water utilization efficiency close to zero litres/kW/hr.

What the source record says

530,000 sq ft building adding 64 MW of IT capacity on Vantage's 68-acre Quincy (WA1) campus at 2101 M Street NE, bringing the campus to 89 MW across nearly 775,000 sq ft. Uses Tier 4 generators to reduce particulate and NOx emissions. Construction began in late 2022 and the building was delivered Oct. 18, 2023. Sibling buildings WA11 and WA12 are already tracked separately; the 89 MW and 68 acres are campus-level figures and are not attributed to this building. Coordinates are an approximate geocode of the campus address.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2023-10-18 · source-reported operational

    Vantage announced delivery of WA13, the third and final facility on its Quincy (WA1) campus.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID vantage-wa13-quincy-wa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001543

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 2101 M Street NE, Quincy, WA 98848 · Grant (Approximate location)

Roles

  • Operator: Vantage Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2023-10-18 · source-reported operational

    Status history supplied by the source.

Power capacity

  • Reported capacity: Operational: 64 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Grant County PUD

    Utility as named by the provider.

  • Power source: Hydro

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-05

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.