This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Vantage WA13.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Vantage Data Centers
- Address and locality
- 2101 M Street NE · Quincy · Grant County · Washington · 98848
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- operational
- Provider facility type
- data center
- Reported capacity
- Operational: 64 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 5 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001543
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Grant County PUD
- Power source
- Hydro
- Cooling
- Closed-loop
Provider notes
Energy. Vantage says Grant County PUD's two large-scale hydroelectric dams produce an average of 1,050 MW annually and that hydro accounts for more than 66% of the utility's generation mix.
Water. Closed-loop air-cooled chiller system. Vantage reports the campus's closed-loop chilled-water design with air-side economizers brings water utilization efficiency close to zero litres/kW/hr.
What the source record says
530,000 sq ft building adding 64 MW of IT capacity on Vantage's 68-acre Quincy (WA1) campus at 2101 M Street NE, bringing the campus to 89 MW across nearly 775,000 sq ft. Uses Tier 4 generators to reduce particulate and NOx emissions. Construction began in late 2022 and the building was delivered Oct. 18, 2023. Sibling buildings WA11 and WA12 are already tracked separately; the 89 MW and 68 acres are campus-level figures and are not attributed to this building. Coordinates are an approximate geocode of the campus address.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2023-10-18 · source-reported operational
Vantage announced delivery of WA13, the third and final facility on its Quincy (WA1) campus.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Vantage Data Centers Completes Development of 89MW, $1 Billion Quincy, Washington Campus · Vantage Data Centers
- Quincy, Washington Data Center Campus · Vantage Data Centers
- Quincy, WA data center facility directory (Vantage WA11/WA12/WA13) · Baxtel
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID vantage-wa13-quincy-wa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001543
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- 2101 M Street NE, Quincy, WA 98848 · Grant (Approximate location)
Roles
- Operator: Vantage Data Centers
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported operational
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2023-10-18 · source-reported operational
Status history supplied by the source.
Power capacity
- Reported capacity: Operational: 64 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Grant County PUD
Utility as named by the provider.
- Power source: Hydro
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-05
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.