Facts at a glance
- Record ID
h5-quincy-data-center-wa- Record type
- operating facility
- Developer
- Not named in the cited records
- Operator
- H5 Data Centers
- Owner
- Owner of record not established
- Tenant
- Not named in the cited records
- Capacity
- Unknown No independently supported figure
Emergency-generator and cooling-unit ratings in the order are not critical IT capacity, utility service or measured load and are not converted here. - Location
- 1711 M Street NE, Quincy, WA
County: Grant County
exact — The exact street address, city and county are stated in Ecology Approval Order 24AQ-E040; exact does not mean a surveyed parcel or building footprint. - Physical scale
- Physical scale: The selected primary records establish one permitted facility. They do not resolve the number, status or boundaries of separately marketed buildings.
What the sources support
Ecology's order calls H5 Quincy an existing data center at 1711 M Street NE. The accompanying review concerned equipment that had not all been installed, so operating describes the existing facility and does not imply full permitted buildout.
Definitions: record units · roles · capacity boundaries · lifecycle stages.
What remains unknown
- critical IT capacity
- utility service and measured load
- current completion status of approved equipment
- resolved building count and building-level relationships
- current occupancy, utilization and tenant identity
- surveyed parcel and building footprints
Sources
-
Washington State Department of Ecology — data centers regulated or reviewed by Ecology →Gov. record
Exact location Quincy — H5 (formerly Intuit) entry and linked approval order
What it supports State regulator's facility identity, former-name relationship and link to the site-specific order; the index explicitly says it is not a complete statewide list.
-
Ecology Approval Order 24AQ-E040 — H5 Quincy →Gov. record
Exact location Order caption, Project Summary and technical-support-document project description
What it supports Existing-facility identity, H5 role, exact address and the boundary between existing operation and not-yet-installed equipment.
Record history
Record history · 26 November 2024 · DataCenterData review
h5-quincy-data-center-wa → Record
Why Ecology documented an existing H5 data center while reviewing an extension and equipment changes; the order is not evidence of full permitted buildout.
Evidence No additional evidence link; see the linked record or claim.
DataCenterData record added · 18 September 2026 · DataCenterData review
h5-quincy-data-center-wa → Publication
Why Added after independent re-reading of the state index and site-specific order, with equipment ratings excluded from IT-capacity fields.
Evidence No additional evidence link; see the linked record or claim.
Data + actions
Permanent link for citing this record →
Suggest a correction → Record ID h5-quincy-data-center-wa and the page are prefilled. Accepted material corrections appear on Changes.