This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Tract Silver Springs Data Center Park.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Tract
- Address and locality
- Silver Springs · Lyon County · Nevada
- Official metro area
- Reno, NV
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 1,600 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 14 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001496
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 1,060 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: supported
- AI-use label (provider)
- likely
- Announced
- September 2025
Provider notes
Community. Tract's own announcement (2025-09-17) quotes Lyon County Manager Andrew Haskin welcoming the project after 'successful rezoning and development agreement with Lyon County' (per the article's own title); no opposition or resident concerns documented. Checked: operator press release only -- this is a county economic-development official's statement, not an independent local-news check or a residents' poll.
What the source record says
Master-planned data center park near Silver Springs, Lyon County (near the US-50/USA Parkway corridor east of Reno). ~1,060 acres acquired with approved rezoning and a Lyon County development agreement; buildout capacity up to 1.6GW with an initial 700MW under utility study, planned dry/air-cooled to minimize water use. Land/entitlement stage — proposed, not yet under construction. Coordinates approximate to Silver Springs.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-09 · source-reported proposed
Tract closed on ~1,060 acres near Silver Springs following rezoning and a development agreement approved by Lyon County; site master-planned for up to 1.6GW with an initial 700MW under utility study.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Tract Expands Its Greater Reno Portfolio, Closing on 1,060 Acres in Silver Springs, Nevada · Tract
- Tract acquires 1,000 acres in Nevada for 1.6GW data center park · Data Center Dynamics
- Lyon County approves Tract Capital's data center project plan in Silver Springs · CitizenPortal.ai
- Tract Silver Springs Data Center · Data Center Map
- Tract Acquires 1,000 Acres in Nevada for 1.6GW Data Center Park · Baxtel
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID tract-silver-springs-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
Operator’s own listing
What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.
- Name as listed
- Sapphire Technology Park
- Address as published
- Silver Springs, NV
Lifecycle status is not published for this listing.
Site area: 1063 acres.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001496
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): likely
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Silver Springs, NV · Lyon (Approximate location)
Roles
- Operator: Tract
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: September 2025
Provider-reported announcement date.
- Status history: 2025-09 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 1,060 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 1,600 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Community response: Provider label: supported
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.