Licensed lead · not independently verified · dcd-dir-001413

T5 Chicago II

source-reported operational

T5 Data Centers

200 Innovation Drive · Elk Grove Village · Cook County · Illinois · 60007

Capacity not statedSource updated 12 September 2026exact location (provider label) · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for T5 Chicago II.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
T5 Data Centers
Address and locality
200 Innovation Drive · Elk Grove Village · Cook County · Illinois · 60007
Official metro area
Chicago-Naperville-Elgin, IL-IN
Source-reported status
operational
Provider facility type
data center
Reported capacity
Not stated
Source freshness
12 September 2026
Location precision
exact (provider label)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001413

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
ComEdUtility as named by the provider.
Announced investment
$250 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
20 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Illinois Data Center Investment Program · Illinois · 2020 · $15.625 million (as stated) Open cited source →

What the source record says

T5 Chicago II at 200 Innovation Drive, Elk Grove Village, IL 60007 (commissioned by Forsythe 2014, acquired by T5 in 2016, 17.5MW). Confirmed via baxtel and Inflect colo directories; T5's own /locations/ page structure loaded but is client-side rendered so facility list could not be extracted directly from it. Capacity removed 2026-08-08: the 17.5 MW figure rested solely on a Baxtel listing, and other aggregators give a conflicting ~30 MW for the same address. OPERATOR ALSO UNVERIFIED: Data Center Knowledge reports Chicago among the T5 assets folded into STACK Infrastructure in Jan 2019, so “T5 Data Centers” may be stale here — but no source confirms whether THIS building (200 Innovation Drive, acquired by T5 from Forsythe in 2016) was among them, so it is left unchanged rather than guessed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID t5-chicago-ii-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

State or local registry record

What a state or local government record says naming this company in this city (no street is given in the record). The record is cited, not republished. It does not establish that a data center is operating, its capacity, or its owner or operator unless the record says that role. It is not added to the counts on this page.

Matched by name and city only. The government record names T5@Chicago II, LLC in Elk Grove Village and gives no street. It is shown here because this is the only published record with that name in that city; it may concern another site of the same company there.

T5@Chicago II, LLC

Publishing agency
Illinois Department of Commerce and Economic Opportunity
Record type
state certification list
Named in the record
T5@Chicago II, LLC The record does not call this company the operator.
Location precision
Elk Grove Village only The record names a city and no street. It is not placed on the map and is not a distinct-site finding.
Registry table row
Row 4 on page 8 of Data Center Investment Program 2025 Annual Report, MOU table (Illinois DCEO)
  • Company Name: T5@Chicago II, LLC
  • Site Location: Elk Grove Village
  • Year: 2020
The name, named party, locality and year were checked against this one row of the stored PDF table by word position; the table's money, benefit and job columns are not published. The year is the agreement year the table states, not an opening or operating date.

Factual fields cited to the named government page. DataCenterData does not republish the page or the underlying database. A permit, certification, tax status, or application does not by itself establish an operating data center.

What this record does not establish

  • That a permit, certification, tax status, or application means an operating data center.
  • Current IT capacity, utility load, or generation capacity.
  • Who operates the site. A company named in the record is not the operator unless the record says so.
  • Who owns the site.
  • Cooling redundancy. Mentioned equipment is not a design rating.
  • Whether the record covers one building, a campus, or a suite, beyond the unit label the record itself uses.
No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001413

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 200 Innovation Drive, Elk Grove Village, IL 60007 · Cook (Exact location)

Roles

  • Operator: T5 Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: ComEd

    Utility as named by the provider.

Permits, incentives, jobs and proceedings

  • Announced investment: $250 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 20 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Incentive reported by the source: Illinois Data Center Investment Program · Illinois · 2020 · $15.625 million (as stated)

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-12

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →