This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for T5 @ Atlanta IV.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- T5 Data Centers
- Address and locality
- Palmetto · Fulton County · Georgia
- Official metro area
- Atlanta-Sandy Springs-Roswell, GA
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 10 September 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001411
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power source
- Grid
- Cooling
- Hybrid
- Land area
- 91 acres (source-reported; parcel boundary not established)
- Community response
- Not established
- AI-use label (provider)
- likely
- Announced
- 28 August 2024
Provider notes
Energy. On-site electrical substation providing grid power; substation expected operational 2026.
Water. Air and liquid cooling designed for high-density AI workloads.
What the source record says
City discrepancy: the ledger cited Fairburn, but T5's own page and PR Newswire list Palmetto, GA; DCD describes it as Fairburn/Fulton County with a 91-acre site in Palmetto - site is on the Fairburn/Palmetto border in South Fulton County (I-85 and Gullatt Rd). Capacity: T5's page lists '200 MW available' (Phase 1) while the Aug 2024 land-acquisition PR cites '300 MW' campus total - 300 MW recorded as planned. No tenant disclosed (T5 is a wholesale/build-to-suit developer targeting hyperscalers; page cites AI/liquid-cooling suitability). Phase 1 construction targeted Q2 2027; on-site substation expected 2026. No investment or jobs figure disclosed. Coordinates approximate (I-85/Gullatt Rd corridor).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2024-08-28 · source-reported proposed
Land acquisition finalized; 91-acre site already zoned for data-center use; use permit still required
- 2025-05-23 · source-reported proposed
T5 refiled modified plans: 1.32M sq ft, 3 buildings, up to 300 MW; the original June 2024 filing (495K sq ft, 2 buildings) was withdrawn
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- T5 files to develop data center campus outside Atlanta, Georgia · Data Center Dynamics
- T5 @ Atlanta IV - Official Operator Location Page · T5 Data Centers
- T5 Finalizes Land Acquisition in Atlanta to Support a 300 MW Data Center Campus · PR Newswire
- T5 Plotting Data Center Campus In Fairburn · Bisnow
- T5 Data Centers pursues 495K square foot campus in Fairburn · Atlanta Journal-Constitution
- T5 @ Atlanta IV — operator location page (archived 2026-07-14) · T5 Data Centers, via Internet Archive Wayback Machine
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID t5-atlanta-iv-palmetto-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row is retained from 1.33.0+git-e97215faac76, source as of 2026-09-25T23:45:52.227Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001411
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): likely
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Palmetto, GA · Fulton (Approximate location)
Roles
- Operator: T5 Data Centers
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 28 August 2024
Provider-reported announcement date.
- Status history: 2024-08-28 · source-reported proposed
Status history supplied by the source.
- Status history: 2025-05-23 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 91 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Hybrid
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Not established
Provider label: unknown.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-10
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.