Licensed lead · not independently verified · dcd-dir-000994

Microsoft Northlake Data Center

source-reported operational

Microsoft

601 Northwest Avenue · Northlake · Cook County · Illinois · 60164

Capacity not established; source review excludes the published figureSource updated 21 September 2026exact location (provider label) · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Microsoft Northlake Data Center.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Microsoft
Address and locality
601 Northwest Avenue · Northlake · Cook County · Illinois · 60164
Official metro area
Chicago-Naperville-Elgin, IL-IN
Source-reported status
operational
Provider facility type
data center
Reported capacity
Not established; source review excludes the published figure
Source freshness
21 September 2026
Location precision
exact (provider label)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000994
Capacity held out of the public projection.

Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld. The upstream row remains attributed below, but this value is not repeated as site capacity.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
GridProvider label.
Land area
15 acres (source-reported; parcel boundary not established)
Announced investment
$388,134,927Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
20 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Illinois Data Center Investment Program · Illinois · 2021 · $24,258,433 (as stated) Open cited source →

Provider notes

Energy. Three 66 MVA on-site electrical substations reported to provide a total of 158 MW of utility power.

What the source record says

Microsoft's Azure North Central US site at 601 Northwest Avenue, Northlake. The 158 MW figure is reported utility supply capacity from three on-site substations, not an IT load, so it is recorded under energy notes rather than capacityMw. The Aligned ORD-01/ORD-02 buildings already tracked sit on the same street but are separate operators and parcels.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-09-12 · source-reported operational

    Two-phase facility totalling roughly 707,000 sq ft, in service since 2009 and subsequently expanded under a 2021 state MOU.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID microsoft-northlake-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Federal registry record

What the U.S. EPA Facility Registry Service records at this street address, selected by DataCenterData from EPA’s ECHO Exporter. U.S. government data; not independently verified by DataCenterData. It does not establish who owns or operates the site, whether it is operating, its size, or whether the registration covers one building or a whole campus.

The U.S. EPA registry lists a facility registered as “MICROSOFT CORP-CHICAGO DATA CENTER” at 601 NORTHWEST AVENUE, NORTHLAKE, IL 60164.

Name as registered
MICROSOFT CORP-CHICAGO DATA CENTER
Address as registered
601 NORTHWEST AVENUE, NORTHLAKE, IL 60164
EPA registry ID
110038439785

One EPA registration; it may cover generators for a whole campus or a single building.

Registrations EPA lists for this ID

  • Clean Air Act registration (stationary sources, typically standby generators)
  • RCRA hazardous-waste generator registration

A registration says which program covers the site; it is not a permit for a data center and says nothing about compliance.

Open EPA’s detailed facility report (permits, inspections and compliance history as EPA records them) → EPA ECHO Exporter snapshot of 20 September 2026, retrieved 25 September 2026. ECHO data come from EPA and state systems; they can lag or contain errors, and EPA’s report is the current record. No compliance, inspection or enforcement value is copied here.

Matched to this licensed row on identical full street address. The licensed values above are unchanged.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000994

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 601 Northwest Avenue, Northlake, IL 60164 · Cook (Exact location)

Roles

  • Operator: Microsoft

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026-09-12 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 15 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not established; source review excludes the published figure

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $388,134,927

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 20 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Incentive reported by the source: Illinois Data Center Investment Program · Illinois · 2021 · $24,258,433 (as stated)

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-21

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →