This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Google New Albany Data Center.
Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Address and locality
- New Albany · Franklin County · Ohio
- Official metro area
- Columbus, OH
- Source-reported status
- operational
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 26 July 2026
- Location precision
- exact (provider label)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000729
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 447 acres (source-reported; parcel boundary not established)
- Announced investment
- $600 million
What the source record says
1101 Beech Rd SW, New Albany — operated via Google's Ohio subsidiary Montauk Innovations LLC. 275,000 sq ft initial building on a ~440-447 acre campus. $600M confirmed initial capital investment; 100% real-property tax abatement (15yr) and 100% sales-tax exemption (~$43.5M value, 15yr) granted. Distinct from Google's Lima "Project BOSC" facility (different county) and Google's Lancaster campus (tracked separately). No IT-load MW figure publicly disclosed. In June 2025, the same Montauk Innovations entity acquired an adjacent 85-acre parcel at 2565 Harrison Road NW (~4 miles north) for $63M; Google has NOT confirmed this parcel will become a data center ("we want to ensure we have the option to further grow, should our business demand it" per a spokesperson) — tracked as a note here rather than a standalone facility pending confirmation. No AI/HPC-specific marketing found — Google's own materials describe this and its other Ohio campuses generically as cloud/digital infrastructure. County-auditor parcels confirm the campus straddles the Franklin-Licking line: the operational, data-center-classed parcel is in Franklin County (5266 Babbitt Rd, 222 ac, Montauk Innovations LLC, acquired Dec 2018 for $27.4M), extending east across the line into Licking County at 1101 Beech Rd SW (219 ac; ~441 ac combined). The coordinate is now parcel-exact to the Franklin operational parcel.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2021 · source-reported operational
Facility operational since 2021, per Baxtel; groundbreaking occurred November 2019 under Google's Ohio subsidiary Montauk Innovations LLC.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Google Data Centers — Ohio · Google
- Google plans $1bn New Albany data center expansion, acquires 618 acres for more data centers · Data Center Dynamics
- Google: New Albany, Ohio Data Center · Baxtel
- Google acquires 85 acres in New Albany, Ohio · Data Center Dynamics
- Franklin County parcel/GIS record (parcel 222-004984, 5266 Babbitt Rd — MONTAUK INNOVATIONS LLC, data-center use class, 222 ac; the operational parcel of the Google/Montauk New Albany campus, which straddles the county line into Licking County at 1101 Beech Rd SW) · Franklin County Auditor GIS / Assessor
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID google-new-albany-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
Operator’s own listing
What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.
- Name as listed
- New Albany
- Address as published
- New Albany, OH
Lifecycle status is not published for this listing.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
This exact source identifier is linked to Google — New Albany campus. The licensed row remains a separate discovery record.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000729
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- New Albany, OH · Franklin (Exact location)
Roles
- Operator: Google
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported operational
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2021 · source-reported operational
Status history supplied by the source.
Area, acreage and buildings
- Land area: 447 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Announced investment: $600 million
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-07-26
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.