AWS Wallula Gap Campus

source-reported proposed

Amazon Web Services

Sundance Road, Wallula Gap Business Park · Wallula · Walla Walla County · Washington

Reported planned 300 MWSource updated 14 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for AWS Wallula Gap Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Amazon Web Services
Address and locality
Sundance Road, Wallula Gap Business Park · Wallula · Walla Walla County · Washington
Official metro area
Walla Walla, WA
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
14 September 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000167

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Columbia Rural Electric Assn, IncUtility as named by the provider.
Power source
GridProvider label.
Cooling
HybridProvider label.
Land area
500 acres (source-reported; parcel boundary not established)
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
October 2024Provider-reported announcement date.

Provider notes

Energy. In Pacific Power (PacifiCorp) service territory (utility inferred from territory, not company-confirmed); regional supply is hydro-dominant.

Water. Amazon's Aug 2026 community materials state the cooling system will use outside air ~93% of the year, with water-based cooling supplementing during the hottest ~7%.

Community. Port of Walla Walla commissioners approved the amended land sale unanimously (Feb 12, 2026), calling the project transformative; documented concerns from the Confederated Tribes of the Umatilla Indian Reservation (sacred Snake/Columbia confluence), environmental and academic voices, and a commissioner over water and power. No litigation or moratorium; a SEPA environmental review with tribal and public comment is still pending.

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Announced investment: The source note says the roughly $4.8 billion campus figure is an estimate across about four phases, not a firm pledge, and was meant to be omitted as an investment value.

What the source record says

~$4.8B, ~300 MW campus near Wallula, Walla Walla County; operator reported (not officially confirmed) to be AWS → confidence reported. Coordinates are the Wallula area centroid. Operator confirmed as Amazon Data Services when the Port of Walla Walla amended the buyer from Advance Phase LLC to Amazon Data Services (Feb 12, 2026 commission vote; >550 acres for >$36M land) — confidence upgraded to confirmed. The reported ~$4.8B (DCD) / ~$5B (local) campus figure is an estimate across ~4 phases, not a firm pledge -> investmentUsd omitted. Port projects ~720 direct+indirect jobs at full build-out (projection) -> jobs honest-zero. Eligible for Washington's rural-county server-equipment sales/use-tax exemption (RCW 82.08.986) but no DOR certificate is confirmed -> subsidy honest-zero. Water source and cooling type are undisclosed pending SEPA (no water rights were conveyed in the land deal).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026 · source-reported under construction

    A ~$4.8B, ~300 MW data center in Walla Walla County (Wallula), widely reported to be AWS

    Open cited source →

  2. 2026-09-05 · source-reported proposed

    Walla Walla County's own project page and local reporting show the campus is still in permitting, not construction. The county held a pre-application meeting on April 29, 2026, issued a Notice of Incomplete Application on June 23, 2026, and issued a Notice of Complete Application on August 24, 2026 (files SDP26-01 and SEPA26-05). As of September 1, 2026 no final land-use decision has been made and construction has not been initiated. The record's current 'under_construction' status is not supported by these sources.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aws-wallula-gap-walla-walla-wa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000167

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Sundance Road, Wallula Gap Business Park, Wallula, WA · Walla Walla (Approximate location)

Roles

  • Operator: Amazon Web Services

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: October 2024

    Provider-reported announcement date.

  • Status history: 2026 · source-reported under construction

    Status history supplied by the source.

  • Status history: 2026-09-05 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 500 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Columbia Rural Electric Assn, Inc

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Hybrid

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-14

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →