This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for AWS Project Steamboat – Warren County Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Amazon Web Services
- Address and locality
- Vicksburg · Warren County · Mississippi
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 9 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000159
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Entergy Mississippi
- Power source
- Grid
- Announced investment
- $3 billion
- Announced jobs
- 200 permanent
- AI-use label (provider)
- confirmed
- Announced
- 20 November 2025
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- Mississippi Major Economic Impact Authority incentives (corporate income tax exemptions, sales tax rebates on construction and equipment, state-backed infrastructure financing) · Mississippi · 2025 Open cited source →
What the source record says
Net-new: a Warren County site, distinct from the Madison County aggregate record aws-project-atlas-madison-county-ms, whose notes cite the Warren County $3B only as part of Amazon's $25B statewide total. Codename 'Project Steamboat'. Confirmed absence of a precise site: MPB reports the announcement was made in downtown Vicksburg and other coverage places the campus 'near the new Port of Vicksburg', but no source fetched in this run discloses the parcel, road, or acreage — coordinates are a Vicksburg city centroid, precision 'approximate'. Status kept at 'proposed' rather than 'under_construction': Amazon's own page still calls it a 'planned investment' and MPB says construction was 'slated to begin in 2026'; no fetched source confirms ground has been broken as of 2026-09-09. Jobs: 'at least 200 new jobs at the Amazon data center campus' plus 'more than 300 additional full-time equivalent positions in the Warren County community' — only the 200 direct figure is recorded. Subsidy has no dollar figure in any fetched source, so amountUsd is deliberately omitted; MPB reports the incentives 'can extend for up to 30 years if AWS keeps meeting investment and job thresholds' and that a portion of Amazon's payments in lieu of property taxes would flow to the Vicksburg Warren School District. Note the sibling Entergy record entergy-vicksburg-aps-ms is the 754 MW gas station on the old Baxter Wilson site in the same county.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-11-20 · source-reported proposed
Announced in downtown Vicksburg as 'Project Steamboat'; Amazon states 'at least $3 billion in Warren County, Mississippi' for a next-generation data center campus, the largest private investment in Warren County's history. Construction slated to begin in 2026.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Amazon plans to invest at least $3 billion in Warren County, Mississippi, for next-generation data center campus · About Amazon
- Amazon to build $3 billion data center in Warren County, expanding tech footprint in Mississippi · Mississippi Public Broadcasting
- Amazon plans to invest $25 billion in Mississippi data centers, create 2,000 jobs · About Amazon
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aws-project-steamboat-warren-county-ms. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000159
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Vicksburg, MS · Warren (Approximate location)
Roles
- Operator: Amazon Web Services
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 20 November 2025
Provider-reported announcement date.
- Status history: 2025-11-20 · source-reported proposed
Status history supplied by the source.
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Entergy Mississippi
Utility as named by the provider.
- Power source: Grid
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $3 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Announced jobs: 200 permanent
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Incentive reported by the source: Mississippi Major Economic Impact Authority incentives (corporate income tax exemptions, sales tax rebates on construction and equipment, state-backed infrastructure financing) · Mississippi · 2025
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-09
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.