Reported geography
Source-reported location for Lake Anna Technology Campus (LATC).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Amazon Web Services
- Address and locality
- Louisa · Louisa County · Virginia
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 600 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 21 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000148
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Rappahannock Electric Co-op
- Land area
- 153 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: supported
Provider notes
Community. The Louisa County Board of Supervisors approved the Technology Overlay District 6-1 (April 2023) — the zoning action the county and AWS both cite as enabling LATC (and NCTC) ahead of the ~$11B combined investment announcement — with no organized opposition documented at that hearing.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Cooling: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.
What the source record says
One of two AWS campuses in Louisa's Technology Overlay District (approved by BOS April 2023, ~$11B combined investment across both). Up to seven data center buildings (~1.7M sq ft), two 300MW substations. First DC targeted online late 2025/early 2026. A third AWS Louisa campus proposal (1,370 acres near Northeast Creek Reservoir) was withdrawn/cancelled by AWS in July 2025 — not included per do-not-fabricate rule (cancelled, not net-new). Capacity corrected to 600 MW (two 300 MW substations per Louisa County reporting; a prior 420 MW figure was unsourced). Land-disturbance + VA DEQ stormwater permits issued; grading underway. Landowner: REB Investment Company, LLC.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2024-07-22 · source-reported under construction
under construction per Louisa County land-disturbance permit + VA DEQ stormwater permit (reported via county-sourced local coverage)
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Louisa County land-disturbance permit + VA DEQ stormwater permit (reported via county-sourced local coverage) · Tammy Purcell / Engage Louisa (citing Louisa County permitting records)
- AWS files for 1.7M sq ft data center campus in Louisa County, Virginia · Data Center Dynamics
- Louisa County Data Centers information page · Louisa County, VA
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
- infoCville — Amazon to invest $11 billion in Louisa County
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aws-lake-anna-technology-campus-louisa-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000148
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Louisa, VA (Approximate location)
Roles
- Operator: Amazon Web Services
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2024-07-22 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 153 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 600 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Rappahannock Electric Co-op
Utility as named by the provider.
Permits, incentives, jobs and proceedings
- Community response: Provider label: supported
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-21
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.