Reported geography
Source-reported location for AWS Clinton Data Center.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Amazon Web Services
- Address and locality
- 1001 Industrial Park Drive · Clinton · Hinds County · Mississippi
- Official metro area
- Jackson, MS
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 14 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000132
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Entergy Mississippi
- Power source
- Grid
- Cooling
- Closed-loop
- Announced investment
- $1 billion
- Announced jobs
- 100 permanent
- AI-use label (provider)
- likely
- Announced
- 2026
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- Fee-in-Lieu of Taxes (FILOT): 67% reduction in annual ad valorem taxes for 10 years once operational, plus a two-thirds reduction on taxes on in-building property such as servers for a further 20 years; payments split proportionally among the city, county and school district; agreement terminates if construction has not commenced by January 1, 2031 · City of Clinton and Hinds County, Mississippi · 2026 Open cited source →
Provider notes
Water. Amazon describes this site as having a minimal water footprint and being cooled exclusively by air-cooled chillers, a design constraint of retrofitting the existing building. Recorded as closed_loop rather than air under the project's tie-breaker rule: an air-cooled chiller plant still runs a recirculating water/coolant circuit, and 'air' is reserved for designs with no cooling water circuit at all.
What the source record says
Net-new: this is a Hinds County site, distinct from the existing aggregate record aws-project-atlas-madison-county-ms, whose own notes name only the two Madison County complexes (Madison County Mega Site near Canton and the Costas Property in Ridgeland) and cite the Hinds County $1B figure only as part of Amazon's $25B statewide total — it has never been recorded as a facility. Site is the long-vacant former Delphi auto-parts plant in the Clinton Industrial Park, mostly empty since 2009; AWS describes it as the first time it has retrofitted an existing industrial building into a data center at this scale. Coordinates are a geocode of Clinton, MS (city centroid) — no source fetched in this run gives a street address or the industrial-park parcel. Confirmed absences: no source fetched states IT capacity in MW, acreage, or building square footage; no fee-in-lieu or PILOT agreement figure was found (the City of Clinton page states only that the investment will 'generate millions of dollars in new revenue'). Status is 'under_construction' rather than 'operational' deliberately: a ribbon-cutting was held 2026-06-12 but Entergy's account describes the project as under development and not yet operational, and a separate groundbreaking was also reported — the sources conflict on whether it has begun serving traffic. Water/cooling: reporting states the Clinton building will not use water and will use air cooling, but no fetched source in this run carries that sentence, so the water field is omitted rather than guessed.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-06-12 · source-reported under construction
Ribbon-cutting held in Clinton marking Amazon's $1 billion investment converting the former Delphi manufacturing plant into a data center; Entergy's account describes the project as under development rather than in service.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Amazon plans to invest $25 billion in Mississippi data centers, create 2,000 jobs · About Amazon
- Amazon's $1B investment in Clinton celebrated with ribbon-cutting · Entergy
- City of Clinton Celebrates $1 Billion AWS Investment · City of Clinton, Mississippi
- AWS marks $1 billion data center investment in Clinton · The Mississippi Monitor
- Documents reveal incentive package for $750M Clinton data center (1001 Industrial Park Dr.) · WLBT
- Where do Amazon's data centers in Mississippi stand? Company offers details on project status, water and energy footprint · DeSoto County News (republishing Mississippi Today, 2026-06-09)
- $750M data center coming to Clinton — FILOT approved by Clinton Board of Aldermen and Hinds County Board of Supervisors on January 15, 2026 · WLBT
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aws-clinton-hinds-ms. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000132
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): likely
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- 1001 Industrial Park Drive, Clinton, MS · Hinds (Approximate location)
Roles
- Operator: Amazon Web Services
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 2026
Provider-reported announcement date.
- Status history: 2026-06-12 · source-reported under construction
Status history supplied by the source.
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Entergy Mississippi
Utility as named by the provider.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $1 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Announced jobs: 100 permanent
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Incentive reported by the source: Fee-in-Lieu of Taxes (FILOT): 67% reduction in annual ad valorem taxes for 10 years once operational, plus a two-thirds reduction on taxes on in-building property such as servers for a further 20 years; payments split proportionally among the city, county and school district; agreement terminates if construction has not commenced by January 1, 2031 · City of Clinton and Hinds County, Mississippi · 2026
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.