This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for AWS Arlington Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Amazon Web Services
- Address and locality
- Arlington · Gilliam County · Oregon
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 12 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000120
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- PacifiCorp
- Cooling
- Closed-loop
- Land area
- 406 acres (source-reported; parcel boundary not established)
Provider notes
Energy. The Times-Journal (July 2026): AWS will not proceed with the Arlington water infrastructure until it has reliable electricity, which is not expected before 2031; the article cites a six-to-seven-year BPA transmission backlog and AWS's Oregon PUC complaint against PacifiCorp over data center service.
Water. The Times-Journal (July 2026) quotes city officials that 'AWS intends to build this closed-loop system at its Arlington campus' to reduce consumption; AWS's $19.4M Columbia River water system (reservoir, booster station, port pump station, water lines) is on hold until grid power is available.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Amazon plans major data center expansion in tiny Eastern Oregon town — 376 acres bought for $10 million, plus 30 more acres from the Port of Arlington for $3 million; served by PacifiCorp; tax terms to be negotiated under the Strategic Investment Program because Gilliam County does not qualify for the enterprise zone program · The Bulletin (Bend, OR)
- Arlington, Ore., Amazon Plan Large Data Center in Tiny City — 400 acres total (376 acres for $10M plus 30 acres from Port of Arlington for $3M), PacifiCorp service, SIP negotiations not yet begun · Government Technology
- Arlington pushes ahead with municipal water system — The Times-Journal (2026-07-16, updated 2026-07-29) · The Times-Journal (Condon, OR)
- Amazon plans major data center expansion in tiny Eastern Oregon town · Bend Bulletin / The Oregonian
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID aws-arlington-gilliam-or. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000120
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Arlington, OR · Gilliam (Approximate location)
Roles
- Operator: Amazon Web Services
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
Area, acreage and buildings
- Land area: 406 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: PacifiCorp
Utility as named by the provider.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-12
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.