Public company · source-reported stage
American Tower (CoreSite)
Data center listings that name American Tower (CoreSite), by reported stage and state. AMT · SEC filings
Counts are source listings, not distinct data centers or company exposure. Several listings can describe one site.
Reported stage
- Reported operating16
- Under construction or expanding1
- Permitted or approved1
- Proposed or planned3
- Stage not established12
Where they are listed
All stages, cancelled listings left out.
Pipeline includes construction or expansion, permits or approvals, and proposals; it can overlap an operating site. Counts do not show which permits are still needed. A company may be named as developer, operator, tenant or landowner. Most rows are third-party listings, not individually verified. This is not investment advice.
Listings by state
Permitting and local rules differ by state and county. "Pauses in effect" uses the same definition as the policy tracker's count of moratoriums and pauses. A pause in a state does not mean it applies to any listing there.
California
Colorado
Florida
Virginia
District of Columbia
Georgia
Illinois
New Jersey
North Carolina
Massachusetts
New York
Oklahoma
Oregon
Pipeline listings with place names matching local pauses in effect
The listing's county or municipality name matches the pause's. That match does not establish that the pause applies to the listing: matching place names do not verify boundaries, and many pauses cover only new applications and leave out ones already filed or approved. Read the pause itself.
| Listing | Place | Reported stage | Local pause |
|---|---|---|---|
| CoreSite DE3 | Denver, CO | Under construction or expanding | Denver: one-year pause on data center zoning permits and site plans |
| American Tower Reedy Creek Data Center (East Charlotte) | Charlotte, NC | Proposed or planned | Charlotte: data center application moratorium with an approved extension |
| American Tower EDC Oklahoma (Oklahoma City) | Oklahoma City, OK | Proposed or planned | Oklahoma City: data center rezoning and permit moratorium to 31 December 2026 (emergency ordinance) |
| CoreSite Hillsboro Data Campus (HI1/HI2) | Hillsboro, OR | Proposed or planned | Hillsboro: 120-day pause on new data center land use applications |
What these counts can—and cannot—tell you
This page is not investment advice. It says nothing about how any company's business or shares would be affected. It reports what listings say.
These are source listings, not distinct data centers. Counts can include overlapping campus, building and expansion listings, including entries for the same site in different stages. A shared listing can appear under more than one company. Combined totals, map counts and the combined list count each source listing once; company counts can overlap. They do not measure distinct sites, capacity or company exposure. A listing may name a company as developer, operator, tenant or landowner, and a company's inclusion does not establish that it owns or operates a site. "Pipeline" means a listing reports construction, expansion, a permit or approval, or a proposal, and it can include expansion at an operating site. It does not show which permits a site still needs, because listings rarely say. Most rows come from a third-party dataset that DataCenterData has not verified row by row. Stage not established includes mixed or unknown stages, listings with no stage stated, and registry records that do not establish a stage. Cancelled or expired listings are excluded.
American Tower (CoreSite) is on the SEC company tickers list, read 2026-11-04, as AMERICAN TOWER CORP /MA/. Exact company-name labels matched by hand: “American Tower”, “American Tower Corporation”, “CoreSite”. Additional shared-building and project matches are cited with their listings. 3 listings reported cancelled or expired are not shown. Stages are the listings' own words, grouped as on the map. Listing rows are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0, with the site's other published layers.