New York index · last changed 13 September 2026

New York data centers: what the public record shows.

Selected source-linked records are published below. This is not a complete inventory of New York data centers.

17 sourced policy records for New York ↓Facility register: 68 records · by county →1 published DataCenterData record · evidence status shown per row49 licensed directory leads · not independently verifiedThese counts overlap and are not added together

Explore New York

Map, listings and checked facts.

Start with 49 licensed source leads, then inspect the separate public-evidence layer below. Licensed rows are not independently verified and are not a statewide census.

New York map

Reported locations in New York

49 licensed rows · 31 source localities · 5 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby groupA number on a marker is the count of licensed rows it holds.Licensed layer only (Compute Atlas, source data through 14 October 2026). The interactive map lists 85 data-center source listings here across licensed, operator and DataCenterData layers (57 with a map point); 86 with government registry records. Source listings are not distinct sites.
Browse 5 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

49 licensed rows31 reported city labels45 eligible organization labels

Browse all 49 rows below. Licensed rows are not independently verified and remain separate from the checked public-evidence layer.

  1. source-reported operationalCapacity not statedSource updated 1 September 2026exact location (provider label)
  2. source-reported operationalCapacity not statedSource updated 9 October 2026approximate location

Separate layer

Also listed by operators

Sites that operators list on their own websites and that are not rows in the licensed directory above. They are kept apart and never added to the licensed rows.

22 operator-listed sites (mixed units; not added to licensed rows) in New York →

14 of these sites have no supported coordinate. The map does not invent a pin or a metro placement for them.

New York evidence at a glance

A few checked sites

Selected public evidence, not a statewide census. Each row shows whether it is independently source-linked, attributed, or unresolved; licensed leads remain separate.

Published project / campus
1
Published facility / building
0
Attributed or unresolved rows
0
Licensed directory leads
49 not independently verified
Capacity boundary stated
1 of 1 published DataCenterData rows
Review timing
Audit through 12 September 2026 · next 12 March 2027
Known coverage gap

Empire State Development and NYSERDA award databases were not searched.

Browse all 49 New York licensed leads → · Why these counts differ →

Projects

1 project record. Names are as they appear on each record page.

Projects published for New York
Record / rolesStatusCapacity / scalePrimary evidence
STREAM U.S. Data Centers at STAMP (Project Double Reed)Developer: Stream Data Centers proposedproject approximately 500 MWUtility request · full build-out scopeApplicant-estimated utility power requirement in the April 6, 2026 filing; not critical IT capacity, approved or contracted service, measured load or current consumption. GCEDC projects — STREAM U.S. Data Centers, LLC →Gov. record

Where the records were checked

Statewide audit pending

A few checked sites

This is not a list of every data center in the state, and the number here is not a count of them. There are almost certainly more.

Statewide coverage is not complete. The records below are sourced; a full statewide count has not been published.

State research audit window ended 12 September 2026. Individual records and claims below show their own evidence dates and may be newer.

Next scheduled coverage review: 12 March 2027.

1 independently source-linked project/campus record; 0 independently source-linked facility/building records; 0 attributed or unresolved rows. These counts use different units and must not be added together.

Source families checked, selected records and remaining gaps

These notes name selected records, say which kinds of public evidence were checked and show what remains missing. They do not add anything to the published counts.

Local evidence by place

Licensed and operator listings, reviewed records, answers and local policy for each place. Listings overlap and are not added; a place without a line here has no published local evidence.

No local evidence answer, reviewed record or local policy record is published for Albany, Brooklyn, Buchanan, Buffalo, Chappaqua, Commack, Lockport, Massena, New York, Niagara Falls, Orangeburg. Their listings above are source listings to investigate. No statewide evidence answer is published for New York either; statewide rules are under Policy tracker below.

Policy tracker

New York policy records

17 sourced records are associated with this state context. They are grouped below as current, pending and nonbinding, and history, and each card shows its relevant date. These are not facility counts and do not cover every locality.

Current 3 records

Recorded as in effect on the dataset date. This does not mean every project in a represented state is restricted or approved.

Incentive or explicitly supportive policy

Sales tax exemption for Internet data center operators

In effect · New York · State

Effective: 1 September 2000

Issuing authority: New York State Legislature

New York exempts from state and local sales and use tax certain machinery, equipment and other property bought by an operator of an Internet data center for use in the center, and certain services on that property, under Tax Law sections 1115(a)(37) and 1115(y).

Read the sourced record · Primary source

Pending or nonbinding 14 records

Adopted measures with unverified effect, adopted future measures, open proceedings, proposals, drafts and nonbinding context stay separate from current rules.

Local construction moratorium · Town of Newport only (local rule)

Town of Newport: one-year pause on data center and cryptocurrency mining approvals (Local Law 4 of 2026)

Adopted; effective status unverified · Town of Newport, New York · Local

Adopted: 10 August 2026

Issuing authority: Newport Town Board

The Newport Town Board passed Local Law No. 4 of 2026 at its 10 August 2026 meeting, according to a 13 August 2026 town announcement, after a public hearing set for that evening.

Read the sourced record · Primary source

Legislation introduced (any outcome)

A9039-B/S8540-A Accountability of Costs for Data Centers Act (pending bill)

Proposed · New York · State

Last checked: 3 November 2026

Issuing authority: New York State Legislature

New York A9039-B/S8540-A, the Accountability of Costs for Data Centers Act, would require utilities to put facilities of twenty megawatts or more used for computing, data processing or web hosting into their own rate class that bears the costs of serving them.

Read the sourced record · Primary source

Local construction moratorium · Town of Clifton Park only (local rule)

Town of Clifton Park: 12-month moratorium on data storage center applications (Local Law No. 9 of 2026)

Adopted; effective status unverified · Town of Clifton Park, New York · Local

Adopted: 7 July 2026

Issuing authority: Clifton Park Town Board

On 7 July 2026 the Clifton Park Town Board enacted and adopted Local Law No. 9 of 2026, which establishes a 12-month moratorium on the siting, acceptance, review and approval of applications for Data Storage Center in the town, according to the Town Clerk's notice of adoption.

Read the sourced record · Primary source

Local construction moratorium · Town of York only (local rule)

Town of York: 12-month pause on data center land use approvals and permits (Local Law 3 of 2026)

Adopted; effective status unverified · Town of York, New York · Local

Adopted: 14 July 2026

Issuing authority: York Town Board

The York Town Board held a public hearing on proposed Local Law No. 3 of 2026 on 14 July 2026, and the New York local law filing form certifies that the board passed it on 14 July 2026.

Read the sourced record · Primary source

Open the New York policy comparison

Review dates: the 17 New York records were last checked 23 September 2026 to 3 November 2026. 4 scheduled reviews are overdue as of the tracker date 3 November 2026: DEC hold on large data-center permits, Large-load interconnection proceeding (Energize NY Development) (last checked 2 October 2026, review due 30 October 2026); Sales tax exemption for Internet data center operators, Voluntary Community Investment Framework for data center host communities (last checked 23 September 2026, review due 23 October 2026). Overdue means not re-read yet, not changed. No single record, and not this list, establishes complete statewide policy coverage.