New Jersey index · last changed 14 September 2026

New Jersey data centers: what the public record shows.

Selected source-linked records are published below. This is not a complete inventory of New Jersey data centers.

1 published DataCenterData record · evidence status shown per row41 licensed directory leads · not independently verifiedNJ

Explore New Jersey

Map, listings and checked facts.

Start with 41 licensed source leads, then inspect the separate public-evidence layer below. Licensed rows are not independently verified and are not a statewide census.

New Jersey map

Reported locations in New Jersey

41 licensed rows · 28 source localities · 2 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby group
Browse 2 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record.

41 licensed rows28 reported city labels25 eligible organization labels

Browse all 41 rows below. Licensed rows are not independently verified and remain separate from the checked public-evidence layer.

  1. 100 Jersey Avenue Data Center

    Undisclosed (parcels controlled by Amzak Capital Management)

    100 Jersey Avenue · New Brunswick · Middlesex County · New Jersey · 08901

    source-reported cancelledCapacity not statedSource updated 14 September 2026approximate location
    View facility →dcd-dir-000839
  2. source-reported operationalOperational 80 MWSource updated 13 September 2026approximate location
    View facility →dcd-dir-000006

New Jersey evidence at a glance

A few checked sites

Selected public evidence, not a statewide census. Each row shows whether it is independently source-linked, attributed, or unresolved; licensed leads remain separate.

Published project / campus
1
Published facility / building
0
Attributed or unresolved rows
0
Licensed directory leads
41 not independently verified
Capacity boundary stated
0 of 1 published DataCenterData rows
Review timing
Audit through 11 September 2026 · next 13 March 2027
Known coverage gap

The November 12, 2025 board book with the CoreWeave award memo returned unavailable during review, so the project description, address and capital investment in the memo were not read.

Browse all 41 New Jersey licensed leads → · Why these counts differ →

Projects

1 project record. Names are as they appear on each record page.

DataOne Vineland AI Data Center approvedproject · City of Vineland Planning Board's June 26, 2025 amended preliminary/final major site-plan approval only UnknownNo independently supported figureThe selected minutes contain applicant electrical-demand and on-site generation descriptions, but neither those statements nor the selected notices establish verified critical-IT, gross-facility, current utility-service, or measured-load MW. Company/news figures of 300 or 350 MW are excluded. City of Vineland Planning Board minutes — June 26, 2025 special meeting →Gov. record

Where the records were checked

Statewide audit pending

A few checked sites

This is not a list of every data center in the state, and the number here is not a count of them. There are almost certainly more.

Statewide coverage is not complete. The records below are sourced; a full statewide count has not been published.

State research audit window ended 11 September 2026. Individual records and claims below show their own evidence dates and may be newer.

Next scheduled review: 13 March 2027.

1 independently source-linked project/campus record; 0 independently source-linked facility/building records; 0 attributed or unresolved rows. These counts use different units and must not be added together.

Source families checked, selected records and remaining gaps

These notes name selected records, say which kinds of public evidence were checked and show what remains missing. They do not add anything to the published counts.