New Jersey index · last changed 1 November 2026

New Jersey data centers: what the public record shows.

Selected source-linked records are published below. This is not a complete inventory of New Jersey data centers.

23 sourced policy records for New Jersey ↓Facility register: 60 records · by county →1 published DataCenterData record · evidence status shown per row45 licensed directory leads · not independently verifiedThese counts overlap and are not added together

Explore New Jersey

Map, listings and checked facts.

Start with 45 licensed source leads, then inspect the separate public-evidence layer below. Licensed rows are not independently verified and are not a statewide census.

New Jersey map

Reported locations in New Jersey

45 licensed rows · 32 source localities · 3 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby groupA number on a marker is the count of licensed rows it holds.Licensed layer only (Compute Atlas, source data through 14 October 2026). The interactive map lists 79 data-center source listings here across licensed, operator and DataCenterData layers (48 with a map point); 83 with government registry records. Source listings are not distinct sites.2 symbols are offset slightly for readability; thin connectors retain their projected anchors. Open the interactive map for source coordinates.
Browse 3 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

45 licensed rows32 reported city labels28 eligible organization labels

Browse all 45 rows below. Licensed rows are not independently verified and remain separate from the checked public-evidence layer.

  1. 100 Jersey Avenue Data Center

    Undisclosed (parcels controlled by Amzak Capital Management)

    100 Jersey Avenue · New Brunswick · Middlesex County · New Jersey · 08901

    source-reported cancelledCapacity not statedSource updated 14 September 2026approximate location
  2. source-reported operationalReported operational 80 MWSource updated 21 September 2026approximate location

Separate layer

Also listed by operators

Sites that operators list on their own websites and that are not rows in the licensed directory above. They are kept apart and never added to the licensed rows.

17 operator-listed sites (mixed units; not added to licensed rows) in New Jersey →

14 of these sites have no supported coordinate. The map does not invent a pin or a metro placement for them.

New Jersey evidence at a glance

A few checked sites

Selected public evidence, not a statewide census. Each row shows whether it is independently source-linked, attributed, or unresolved; licensed leads remain separate.

Published project / campus
1
Published facility / building
0
Attributed or unresolved rows
0
Licensed directory leads
45 not independently verified
Capacity boundary stated
0 of 1 published DataCenterData rows
Review timing
Audit through 11 September 2026 · next 13 March 2027
Known coverage gap

The November 12, 2025 board book with the CoreWeave award memo returned unavailable during review, so the project description, address and capital investment in the memo were not read.

Browse all 45 New Jersey licensed leads → · Why these counts differ →

Projects

1 project record. Names are as they appear on each record page.

Projects published for New Jersey
Record / rolesStatusCapacity / scalePrimary evidence
DataOne Vineland AI Data Center approvedproject · City of Vineland Planning Board's June 26, 2025 amended preliminary/final major site-plan approval only UnknownNo independently supported figureThe selected minutes contain applicant electrical-demand and on-site generation descriptions, but neither those statements nor the selected notices establish verified critical-IT, gross-facility, current utility-service, or measured-load MW. Company/news figures of 300 or 350 MW are excluded. City of Vineland Planning Board minutes — June 26, 2025 special meeting →Gov. record

Where the records were checked

Statewide audit pending

A few checked sites

This is not a list of every data center in the state, and the number here is not a count of them. There are almost certainly more.

Statewide coverage is not complete. The records below are sourced; a full statewide count has not been published.

State research audit window ended 11 September 2026. Individual records and claims below show their own evidence dates and may be newer.

Next scheduled coverage review: 13 March 2027.

1 independently source-linked project/campus record; 0 independently source-linked facility/building records; 0 attributed or unresolved rows. These counts use different units and must not be added together.

Source families checked, selected records and remaining gaps

These notes name selected records, say which kinds of public evidence were checked and show what remains missing. They do not add anything to the published counts.

Local evidence by place

Licensed and operator listings, reviewed records, answers and local policy for each place. Listings overlap and are not added; a place without a line here has no published local evidence.

No local evidence answer, reviewed record or local policy record is published for Andover, Atlantic City, Bridgewater, Carlstadt, Carteret, Cedar Knolls, Clifton, Clinton, Piscataway, Piscataway Township, Secaucus, Weehawken. Their listings above are source listings to investigate. No statewide evidence answer is published for New Jersey either; statewide rules are under Policy tracker below.

1 New Jersey answer is not tied to a published record, so it is not placed here: New Jersey answers.

Policy tracker

New Jersey policy records

23 sourced records are associated with this state context. They are grouped below as current, pending and nonbinding, and history, and each card shows its relevant date. These are not facility counts and do not cover every locality.

Current 6 records

Recorded as in effect on the dataset date. This does not mean every project in a represented state is restricted or approved.

Reporting or resource-use requirement

Semi-annual data center water and energy reports to the BPU

In effect · New Jersey · State

Effective: 27 August 2026

Issuing authority: New Jersey Legislature

New Jersey P.L.2026, c.75, approved on 27 August 2026 and effective immediately, requires data center owners or operators to file water and energy usage reports with the Board of Public Utilities, first within six months (or three months for centers already operating a year) and then every six months for three years.

Read the sourced record · Primary source

Permanent restriction or prohibition · Roselle Park only (local rule)

Roselle Park: data centers prohibited in all zone districts (Ordinance No. 2860)

In effect · Borough of Roselle Park, New Jersey · Local

Effective: 19 June 2026

Issuing authority: Roselle Park Borough Council

The Roselle Park Borough Council adopted Ordinance No. 2860 on 18 June 2026, according to the borough's copy, which lists introduction on 21 May 2026, second reading and adoption on 18 June 2026, and publication on 19 June 2026.

Read the sourced record · Primary source

Permanent restriction or prohibition · Millville only (local rule)

Millville: data centers added to uses prohibited in all districts (Ordinance No. 48-2026)

In effect · City of Millville, New Jersey · Local

Effective: 9 June 2026

Issuing authority: Millville Board of Commissioners

The Millville Board of Commissioners adopted Ordinance No. 48-2026 on second reading on 19 May 2026, according to the City Clerk's certification; the procedure block lists 9 June 2026 as its effective date.

Read the sourced record · Primary source

Incentive or explicitly supportive policy

Next New Jersey Program tax credits for AI and AI data center businesses

In effect · New Jersey · State

Effective: 25 July 2024

Issuing authority: New Jersey Legislature

New Jersey P.L.2024, c.49, approved on 25 July 2024 and effective immediately, created the Next New Jersey Program, under which the Economic Development Authority may award tax credits to businesses primarily engaged in artificial intelligence or in the large-scale artificial intelligence data center industry that meet capital investment and job thresholds.

Read the sourced record · Primary source

Pending or nonbinding 17 records

Adopted measures with unverified effect, adopted future measures, open proceedings, proposals, drafts and nonbinding context stay separate from current rules.

Permanent restriction or prohibition · North Plainfield only (local rule)

North Plainfield: data centers prohibited within any zone (Ordinance 26-10)

Adopted; effective status unverified · Borough of North Plainfield, New Jersey · Local

Adopted: 13 July 2026

Issuing authority: North Plainfield Borough Council

The North Plainfield Borough Council introduced Ordinance No. 26-10 on 22 June 2026 and adopted it on 13 July 2026, according to the borough clerk's published notices.

Read the sourced record · Primary source

Permanent restriction or prohibition · Hardyston Township only (local rule)

Hardyston Township: data centers a prohibited use in all zones (Ordinance 2026-12)

Adopted; effective status unverified · Hardyston Township, Sussex County, New Jersey · Local

Adopted: 24 June 2026

Issuing authority: Hardyston Township Council

The Hardyston Township Council approved Ordinance 2026-12 on second reading on 24 June 2026, according to the council's minutes of that meeting.

Read the sourced record · Primary source

Permanent restriction or prohibition · Oldmans Township only (local rule)

Oldmans Township: data centers prohibited in all zoning districts (Ordinance 2026-09)

Adopted; effective status unverified · Oldmans Township, New Jersey · Local

Adopted: 11 June 2026

Issuing authority: Oldmans Township Committee

The Oldmans Township Committee adopted Ordinance No. 2026-09 on final passage after a public hearing on 11 June 2026, according to the township's notice of final passage.

Read the sourced record · Primary source

Permanent restriction or prohibition · Union Township (Union County) only (local rule)

Union Township (Union County): AI data centers added to prohibited uses (Ordinance 5915)

Adopted; effective status unverified · Union Township (Union County), New Jersey · Local

Adopted: 9 June 2026

Issuing authority: Union Township Committee

The Union Township Committee in Union County introduced Ordinance No. 5915 on 12 May 2026, and the copy read is marked passed and approved on 9 June 2026.

Read the sourced record · Primary source

Permanent restriction or prohibition · Green Township (Sussex County) only (local rule)

Green Township (Sussex County): data centers a prohibited use in all zones (Ordinance No. 2026-04)

Adopted; effective status unverified · Green Township, Sussex County, New Jersey · Local

Adopted: 18 May 2026

Issuing authority: Green Township Committee

The Green Township Committee finally adopted Ordinance No. 2026-04 on 18 May 2026, according to the Township Clerk's notice dated 19 May 2026.

Read the sourced record · Primary source

Permanent restriction or prohibition · East Rutherford only (local rule)

East Rutherford: data centers prohibited in all zones outside Meadowlands jurisdiction (Ordinance 2026-12)

Adopted; effective status unverified · Borough of East Rutherford, New Jersey · Local

Adopted: 16 June 2026

Issuing authority: East Rutherford Borough Council

The governing body of the Borough of East Rutherford adopted Ordinance No. 2026-12 on second and final reading on 16 June 2026, according to the borough's notice of adoption.

Read the sourced record · Primary source

Permanent restriction or prohibition · Holland Township only (local rule)

Holland Township: data centers prohibited in all zoning districts (Ordinance No. 2026-15)

Adopted; effective status unverified · Holland Township, Hunterdon County, New Jersey · Local

Adopted: 21 July 2026

Issuing authority: Holland Township Committee

The Holland Township Committee adopted Ordinance No. 2026-15 on final reading on 21 July 2026, according to the Municipal Clerk's certification on the township's copy.

Read the sourced record · Primary source

Permanent restriction or prohibition · Kingwood Township only (local rule)

Kingwood Township: data centers prohibited in all zoning districts (Ordinance 15-2026)

Adopted; effective status unverified · Kingwood Township, New Jersey · Local

Adopted: 2 July 2026

Issuing authority: Kingwood Township Committee

The Kingwood Township Committee finally adopted Ordinance 15-2026 on 2 July 2026 after second reading and a public hearing, according to the township clerk's public notice.

Read the sourced record · Primary source

Permanent restriction or prohibition · Mannington Township only (local rule)

Mannington Township: data centers a prohibited use in all zoning districts (Ordinance No. 26-01)

Adopted; effective status unverified · Mannington Township, Salem County, New Jersey · Local

Adopted: 5 March 2026

Issuing authority: Mannington Township Committee

The Mannington Township Committee passed Ordinance No. 26-01 on second reading after a public hearing on 5 March 2026, according to the certified copy, which is marked adopted on that day.

Read the sourced record · Primary source

Permanent restriction or prohibition · Mansfield Township (Warren County) only (local rule)

Mansfield Township (Warren County): data centers prohibited in all zones (Ordinance 019-2026)

Adopted; effective status unverified · Mansfield Township (Warren County), New Jersey · Local

Adopted: 24 June 2026

Issuing authority: Mansfield Township Committee

The Mansfield Township Committee in Warren County introduced Ordinance 019-2026 on 10 June 2026 and finally adopted it on 24 June 2026, according to the clerk's published notices.

Read the sourced record · Primary source

Permanent restriction or prohibition · Medford Township only (local rule)

Medford Township: data centers a nonpermitted use in all zones (Ordinance 2026-15)

Adopted; effective status unverified · Medford Township, New Jersey · Local

Adopted: 23 June 2026

Issuing authority: Medford Township Council

The Medford Township Council adopted Ordinance 2026-15 on 23 June 2026 after second reading and a public hearing, according to the Municipal Clerk's notice of final adoption.

Read the sourced record · Primary source

Permanent restriction or prohibition · Montgomery Township (Somerset County) only (local rule)

Montgomery Township (Somerset County): data centers prohibited within township boundaries (Ordinance #26-1779)

Adopted; effective status unverified · Montgomery Township, Somerset County, New Jersey · Local

Adopted: 18 June 2026

Issuing authority: Montgomery Township Committee

The Montgomery Township Committee read Ordinance #26-1779 a second time and adopted it on 18 June 2026, according to the Township Clerk's notice.

Read the sourced record · Primary source

Permanent restriction or prohibition · Neptune Township only (local rule)

Neptune Township: land development ordinance amended to prohibit data centers (Ordinance 26-26)

Adopted; effective status unverified · Neptune Township, New Jersey · Local

Adopted: 13 July 2026

Issuing authority: Neptune Township Committee

The Neptune Township Committee passed and adopted Ordinance 26-26 on second and final reading on 13 July 2026, after public hearings, according to the Township Clerk's public notice.

Read the sourced record · Primary source

Permanent restriction or prohibition · Warren Township only (local rule)

Warren Township: data centers a prohibited use in all zones (Ordinance No. 26-19)

Adopted; effective status unverified · Township of Warren, New Jersey · Local

Adopted: 18 June 2026

Issuing authority: Warren Township Committee

The Township of Warren's published zoning chapter shows a data centers section added on 18 June 2026 by Ordinance No. 26-19, which states that data centers are a prohibited use in all zones within the township.

Read the sourced record · Primary source

Federal and multistate

Federal and multistate instruments that cover all or part of New Jersey

These federal, reliability-organization and multistate grid or utility instruments are stored once and listed for every jurisdiction they name. They do not add to the record count, in-effect total or map shading for New Jersey. Territorial coverage does not establish that an instrument applies to any particular site, utility or project.

Reporting or resource-use requirement · Listed coverage: part of New Jersey

PJM: Large Load definition and registry accepted by FERC; capacity and curtailment rules rejected (ER26-3515)

In effect · PJM region (multistate) · Regional grid

Effective: 12 October 2026

Issuing authority: Federal Energy Regulatory Commission

On 9 October 2026 the Federal Energy Regulatory Commission accepted, effective 12 October 2026, PJM's definition of a Large Load at a cumulative peak of 50 MW and a Large Load Registry that requires load-serving entities to report on the Large Loads they serve, which the order says covers all such loads regardless of in-service date.

Read the sourced record · Primary source

Open the New Jersey policy comparison

Review dates: the 23 New Jersey records were last checked 23 September 2026 to 1 November 2026. 5 scheduled reviews are overdue as of the tracker date 3 November 2026: Semi-annual data center water and energy reports to the BPU, End Data Center Tax Credits Act cuts Next New Jersey credits, Local finance guidance on data center community benefits agreements, Large data center electric service standards required of the BPU, Next New Jersey Program tax credits for AI and AI data center businesses (last checked 23 September 2026, review due 23 October 2026). Overdue means not re-read yet, not changed. No single record, and not this list, establishes complete statewide policy coverage.