Morris Technology Park

source-reported permitted

Tract

Morris · Grundy County · Illinois

Reported planned 1,000 MWSource updated 15 October 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Morris Technology Park.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Tract
Address and locality
Morris · Grundy County · Illinois
Official metro area
Chicago-Naperville-Elgin, IL-IN
Source-reported status
permitted
Provider facility type
data center
Reported capacity
Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
15 October 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001491

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
ComEdUtility as named by the provider.
Cooling
HybridProvider label.
Land area
343 acres (source-reported; parcel boundary not established)
Announced jobs
350 permanent · 1,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: supportedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Energy. Developer coordinating with ComEd on electric infrastructure, with initial power delivery expected Q2 2028. On-site power generation options are being explored.

Water. FAQ assumes a hybrid evaporative system with no cooling water needed outside summer months. Requested up to 1 MGD of peak-day capacity (not typical use) from the Morris municipal system. Tract committed $10M toward the city's water treatment plant expansion.

Community. The site was already fully zoned and entitled at acquisition; the mayor credited the city's proactive zoning/infrastructure groundwork for attracting the project; no opposition documented in available coverage.

What the source record says

343-acre master-planned data center campus in Morris (Grundy County), IL, developed by Tract as powered land/shell infrastructure. Fully zoned and entitled, with an executed Transmission Security Agreement (TSA) with Commonwealth Edison (ComEd) to support 1 GW (1,000 MW) of planned power at full build-out across ~2.9M sq ft.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026 · source-reported proposed

    Open cited source →

  2. 2026-09-12 · source-reported permitted

    Tract's own 15 January 2026 announcement of its 343-acre Morris acquisition states the Morris Technology Park site is 'fully zoned and entitled' and that it has an executed Transmission Security Agreement with ComEd supporting 1 GW at full build-out. That places the project past announcement and into approved-but-not-yet-built. Initial energization is targeted for June 2028, with a full 1 GW load ramp by 2032.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID tract-morris-technology-park-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001491

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Morris, IL · Grundy (Approximate location)

Roles

  • Operator: Tract

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported permitted

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-09-12 · source-reported permitted

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 343 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: ComEd

    Utility as named by the provider.

Cooling, water, PUE and WUE

  • Cooling: Hybrid

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced jobs: 350 permanent · 1,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: supported

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-15

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →