Licensed lead · not independently verified · dcd-dir-001266

Rowan Digital Infrastructure Frederick Campus (Bauxite I)

source-reported operational

Rowan Digital Infrastructure

Adamstown · Frederick County · Maryland

Reported planned 300 MWSource updated 6 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Rowan Digital Infrastructure Frederick Campus (Bauxite I).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Rowan Digital Infrastructure
Address and locality
Adamstown · Frederick County · Maryland
Official metro area
Washington-Arlington-Alexandria, DC-VA-MD-WV
Source-reported status
operational
Provider facility type
data center
Reported capacity
Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
6 October 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001266
Dated source review

The underlying provider record is retained. These notes add source-attributed context and flag conflicts; any withheld value is explained separately. They do not certify current operation.

  • status: The new history attributes operational status to the operator CEO's October 2026 report of energization and first-tenant handover.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Potomac Edison (FirstEnergy)Utility as named by the provider.
Power source
GridProvider label.
Cooling
EvaporativeProvider label.
Reported water use
0.44 million gallons per day (source-reported)Whether this is metered use, a permit limit or a request is not established; see the provider water note.
Land area
151 acres (source-reported; parcel boundary not established)
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
mixed useCompute Atlas classification, not a DataCenterData finding.
Announced
2024Provider-reported announcement date.

Provider notes

Energy. Served from the regional grid; the Maryland PSC approved Potomac Edison's plan to loop two existing 230 kV lines from the Doubs substation into a new switching station feeding the on-site Bauxite substation (built by Potomac Edison). County filings describe up to 92 x 2.75 MW backup generators (~253 MW, diesel or HVO).

Water. 440,000 gallons/day cooling water allocated to Rowan's 156-acre parcel per Frederick County records

Community. Neighboring residents raised health concerns over construction dust and traffic in November 2025. Frederick County overlay zone referendum effort collected 21,000+ signatures; Maryland Supreme Court case pending.

What the source record says

Rowan (Quinbrook Infrastructure Partners + Birch Infrastructure JV) serves as AWS hyperscale host at Quantum Frederick. Three campuses planned on-site total; Bauxite I is Phase 1 at 300MW. 777,150 sq ft total campus footprint. Coordinates approximate for same Quantum Frederick campus area as Aligned record. Location.city set to Adamstown per the more recent, project-specific Frederick News-Post coverage (2025-11-11, via Yahoo Finance); the 2021 Maryland Dept. of Commerce announcement had said "near Buckeystown" — recorded here so the choice is auditable rather than looking arbitrary. AWS is the confirmed tenant of Bauxite I on this former Alcoa Eastalco Works site — AWS's first Maryland data center; no source confirms go-live as of this pass.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2023-01 · source-reported proposed

    Rowan announced three-campus development plan at Quantum Frederick; designed as AWS Maryland availability zone host

    Open cited source →

  2. 2024-01 · source-reported under construction

    Ground broken 2024 on Bauxite I (300MW, Phase 1). Phase 2 financing: $1.24B closed February 2025, led by SMBC and MUFG; $2.2B total secured. AWS Maryland availability zone expected 2026.

    Open cited source →

  3. 2026-10-06 · source-reported operational

    Rowan Digital Infrastructure's own CEO blog post confirms Bauxite I at the Frederick campus was energized and turned over to its first tenant, delivering 200+MW — the campus's first phase coming online.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID rowan-digital-frederick-md. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001266

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): mixed use

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Adamstown, MD · Frederick (Approximate location)

Roles

  • Operator: Rowan Digital Infrastructure

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2024

    Provider-reported announcement date.

  • Status history: 2023-01 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2024-01 · source-reported under construction

    Status history supplied by the source.

  • Status history: 2026-10-06 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 151 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Potomac Edison (FirstEnergy)

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Evaporative

    Provider label.

  • Reported water use: 0.44 million gallons per day (source-reported)

    Whether this is metered use, a permit limit or a request is not established; see the provider water note.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-06

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →