This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Rowan Project Temple.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Rowan Digital Infrastructure
- Address and locality
- Bob White Road · Temple · Bell County · Texas
- Official metro area
- Killeen-Temple, TX
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 14 October 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001267
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Oncor
- Power source
- Grid
- Cooling
- Closed-loop
- Land area
- 700 acres (source-reported; parcel boundary not established)
- Announced jobs
- 40 permanent · 600 construction
- Community response
- Provider label: mixed
- AI-use label (provider)
- confirmed
- Announced
- 2026
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- City of Temple property-tax abatement (Chapter 312) - reported 50% of city property tax for 10 years per construction phase (Killeen Daily Herald); project generates ~$7M/yr during abatement years and ~$12M/yr fully on the tax rolls (City of Temple) · City of Temple, TX · 2025 Open cited source →
Provider notes
Energy. Power secured via a partnership with Oncor (ERCOT grid); no on-site generation documented.
Water. City of Temple requires closed-loop cooling for data-center projects; Project Temple's domestic water use is contractually capped at 4,000 gal/day (a contractual requirement, not an estimate) with no ongoing cooling-water withdrawal. The full utility-services agreement was withheld by the City in response to a records request.
Community. Temple City Council approved unanimously and Bell County supported; organized resident opposition (town halls, council testimony) raised concerns over an undisclosed additional Rowan campus, water/grid/noise, and the abatement. Rowan held a March 2026 open house and community partnerships. The named tenant is undisclosed ('top global technology company'); opposition speculates Meta, unconfirmed.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Announced investment: The source note says the roughly $700 million figure is an abatement minimum-investment floor and that investment was meant to be omitted.
What the source record says
300 MW campus in Temple, Bell County; $3B financing secured, operations targeted 2027. Distinct from Rowan's separately-tracked Frederick, MD campus. Coordinates are the Temple area centroid. The '$3B' figure is green debt financing (May 2026), not campus capex; the abatement cites a ~$700M minimum investment floor -> investmentUsd omitted. ~600 construction / ~40 permanent jobs projected (abatement requires >=48 permanent) -> jobs honest-zero.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · source-reported under construction
Rowan Digital began construction on a 300 MW data center in Temple, Bell County; $3B financing secured, operations targeted 2027
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Rowan powers Texas growth as construction begins on 300 MW Temple data center · Rowan Digital Infrastructure
- City of Temple - Data Center Development FAQ (closed-loop cooling, 4,000 gpd cap) · City of Temple
- Third Rowan data center; minimum $700 million investment; Temple withholds utility records · Killeen Daily Herald
- Temple residents raise concerns over proposed Rowan data center expansion · KXXV
- Temple — 300 MW Hyperscale Data Center Campus (operator portfolio page) · Rowan Digital Infrastructure
- Rowan Digital Infrastructure seeks approval for 6th and final data center in Temple · KWTX
- Rowan Powers Texas Growth as Construction Begins on 300 MW Temple Data Center · Rowan Digital Infrastructure
- Rowan portfolio: Temple, Texas (300 MW, minimum $700M investment, 700 acres) · Rowan Digital Infrastructure
- New $700 million data center in Temple will be near Robinson Family Farm · KWTX
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID rowan-temple-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001267
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Bob White Road, Temple, TX · Bell (Approximate location)
Roles
- Operator: Rowan Digital Infrastructure
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 2026
Provider-reported announcement date.
- Status history: 2026 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 700 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Oncor
Utility as named by the provider.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Announced jobs: 40 permanent · 600 construction
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Community response: Provider label: mixed
Compute Atlas characterization, not a DataCenterData assessment.
- Incentive reported by the source: City of Temple property-tax abatement (Chapter 312) - reported 50% of city property tax for 10 years per construction phase (Killeen Daily Herald); project generates ~$7M/yr during abatement years and ~$12M/yr fully on the tax rolls (City of Temple) · City of Temple, TX · 2025
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.