QTS Eagle Mountain Data Center Campus

source-reported under construction

QTS Data Centers

Eagle Mountain · Utah County · Utah

Reported planned 200 MWSource updated 13 October 2026exact location (provider label) · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for QTS Eagle Mountain Data Center Campus.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
QTS Data Centers
Address and locality
Eagle Mountain · Utah County · Utah
Official metro area
Provo-Orem-Lehi, UT
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
13 October 2026
Location precision
exact (provider label)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001203

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Rocky Mountain Power (PacifiCorp)Utility as named by the provider.
Power source
GridProvider label.
Cooling
Closed-loopProvider label.
Land area
193 acres (source-reported; parcel boundary not established)
Announced investment
$6 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
100 permanent · 2,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
2023Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Eagle Mountain RDA Sweetwater #3 community-reinvestment tax-increment financing — reimburses QTS/tenants 61% of real-property and 74% of personal-property tax increment, 20 years per phase (up to 40 years total); first-phase increment projected at ~$98.86M · Eagle Mountain City RDA, UT · 2023 Open cited source →

Provider notes

Energy. Grid-served by Rocky Mountain Power. After the utility initially could not guarantee sufficient grid power, the city approved on-site gas turbines and a separate 200 MW gas plant as options, but QTS ultimately secured grid supply. QTS declines to disclose the campus's power capacity (third-party trackers estimate over 650 MW at full build-out); it reports portfolio-wide carbon-free electricity for 2024.

Water. A closed-loop system that QTS says does not consume water for cooling once operational — roughly a 600,000-gallon one-time fill per building plus modest domestic use — avoiding an estimated 250–300 million gallons/year versus evaporative cooling.

Community. City officials are formally supportive (a projected ~$12M/year municipal energy tax funds roads, schools, and first responders), and no organized opposition to QTS specifically was found. But water and energy transparency are actively debated in arid Utah — the 2026 state water-reporting law (HB76) was driven partly by Eagle Mountain's data-center growth, though facilities operational before July 2026 are exempt.

What the source record says

Groundbreaking was October 2025; the third of three initial buildings topped out (structural completion) on 2026-04-20. Not yet operational; no delivery date confirmed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2023 · source-reported permitted

    City of Eagle Mountain approved construction; 193-acre campus adjacent to Meta campus

    Open cited source →

  2. 2024 · source-reported under construction

    Construction initially paused, then restarted; 3 buildings ranging 579,000–592,000 sq ft; water-free cooling system

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID qts-eagle-mountain-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001203

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Eagle Mountain, UT · Utah (Exact location)

Roles

  • Operator: QTS Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2023

    Provider-reported announcement date.

  • Status history: 2023 · source-reported permitted

    Status history supplied by the source.

  • Status history: 2024 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 193 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Rocky Mountain Power (PacifiCorp)

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $6 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 100 permanent · 2,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Eagle Mountain RDA Sweetwater #3 community-reinvestment tax-increment financing — reimburses QTS/tenants 61% of real-property and 74% of personal-property tax increment, 20 years per phase (up to 40 years total); first-phase increment projected at ~$98.86M · Eagle Mountain City RDA, UT · 2023

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-13

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →