Reported geography
Source-reported location for NTT Global Data Centers Mesa — Pacific Proving Technology Park.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- NTT Global Data Centers
- Address and locality
- Mesa · Maricopa County · Arizona
- Official metro area
- Phoenix-Mesa-Chandler, AZ
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 360 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 8 August 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001074
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Salt River Project (SRP)
- Power source
- Grid
- Cooling
- Closed-loop
- Land area
- 173 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: contested
- AI-use label (provider)
- likely
- Announced
- November 2023
Provider notes
Energy. On-site SRP substation and private power substation proposed
Water. Closed-loop cooling proposed; community activists cite Arizona drought and Colorado River water stress
Community. Residents packed June 2026 Mesa City Council meeting opposing rezoning, citing water use, heat, and drought. Planning Commission voted 4-0 to recommend approval; council vote was pending summer 2026.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Announced investment: The source note identifies $300 million as the land purchase only, not build-out investment.
What the source record says
investmentUsd is $300M land purchase only; total buildout investment is substantially higher. NE corner of Pecos and Crismon roads, far SE Mesa. Seven two-story buildings totaling 1.7M sq ft + warehouse + office. NTT's second Phoenix-area campus (existing 102-acre, 240MW campus is ~4 miles north on Elliot Road). Phase 1 targeted November 2028. Coordinates approximate for Pecos/Crismon intersection. Status refresh 2026-08-08: the Planning & Zoning Board recommended approval 4-0 in mid-May 2026; the article (updated 2026-06-08) said the proposal "will likely be heard in late July or mid-August by council". No fetched source records a Council vote, so the status stays "proposed" — the 2026-07-20 date carried in earlier notes was an expected hearing date, not a decision.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2023-11 · source-reported proposed
Project first proposed as Pacific Proving Technology Park; NTT filed pre-submittal with City of Mesa
- 2026-05 · source-reported proposed
Mesa Planning Commission voted unanimously to recommend rezoning; council vote was pending summer 2026
- 2026-05 · source-reported proposed
Mesa's Planning and Zoning Board voted 4-0 to recommend that City Council approve NTT's rezoning, council use permit and major site plan modification for the 170-acre site at Pecos and Crismon roads. A recommendation only — the Council decision had not been taken.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- NTT acquires 173-acre planned data center park in Mesa for $300m · Data Center Dynamics
- Mesa residents are fighting a Tokyo tech giant's data center · Copper Courier
- Big data center in SE Mesa passes first review — Planning & Zoning Board recommends approval 4-0 for the 170-acre site at Pecos and Crismon · Mesa Tribune
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID ntt-global-mesa-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001074
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): likely
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Mesa, AZ · Maricopa (Approximate location)
Roles
- Operator: NTT Global Data Centers
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: November 2023
Provider-reported announcement date.
- Status history: 2023-11 · source-reported proposed
Status history supplied by the source.
- Status history: 2026-05 · source-reported proposed
Status history supplied by the source.
- Status history: 2026-05 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 173 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 360 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Salt River Project (SRP)
Utility as named by the provider.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Provider label: contested
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-08-08
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.