Microsoft Hoffman Estates Data Center

source-reported operational

Microsoft

Hoffman Estates · Cook County · Illinois

Capacity not statedSource updated 12 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Microsoft Hoffman Estates Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Microsoft
Address and locality
Hoffman Estates · Cook County · Illinois
Official metro area
Chicago-Naperville-Elgin, IL-IN
Source-reported status
operational
Provider facility type
data center
Reported capacity
Not stated
Source freshness
12 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000984

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
GridProvider label.
Land area
53 acres (source-reported; parcel boundary not established)
Announced investment
$275 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
20 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Announced
March 2021Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Illinois Data Center Investment Program · Illinois · 2021 · $17,187,500 (as stated) Open cited source →

Provider notes

Energy. Campus plans include a dedicated on-site electrical substation, approved separately from the building site plans.

What the source record says

53-acre campus on the north side of Lakewood Boulevard near Barrington Road, approved by the Hoffman Estates Village Board in May 2021. Distinct from Microsoft's Elk Grove Village and Northlake sites. Investment figure is the capital-investment commitment recorded in the state MOU; a trade-press account attributes a higher figure to the campus, so the state number is used here as the documented commitment.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-09-12 · source-reported operational

    Phase 1 building (250,000 sq ft) complete and in service; a second 150,000 sq ft building and an on-site substation are under construction.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID microsoft-hoffman-estates-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

State or local registry record

What a state or local government record says naming this company in this city (no street is given in the record). The record is cited, not republished. It does not establish that a data center is operating, its capacity, or its owner or operator unless the record says that role. It is not added to the counts on this page.

Matched by name and city only. The government record names Microsoft Corporation in Hoffman Estates and gives no street. It is shown here because this is the only published record with that name in that city; it may concern another site of the same company there.

Microsoft Corporation

Publishing agency
Illinois Department of Commerce and Economic Opportunity
Record type
state certification list
Named in the record
Microsoft Corporation The record does not call this company the operator.
Location precision
Hoffman Estates only The record names a city and no street. It is not placed on the map and is not a distinct-site finding.
Registry table row
Row 8 on page 8 of Data Center Investment Program 2025 Annual Report, MOU table (Illinois DCEO)
  • Company Name: Microsoft Corporation
  • Site Location: Hoffman Estates
  • Year: 2021
The name, named party, locality and year were checked against this one row of the stored PDF table by word position; the table's money, benefit and job columns are not published. The year is the agreement year the table states, not an opening or operating date.

Factual fields cited to the named government page. DataCenterData does not republish the page or the underlying database. A permit, certification, tax status, or application does not by itself establish an operating data center.

What this record does not establish

  • That a permit, certification, tax status, or application means an operating data center.
  • Current IT capacity, utility load, or generation capacity.
  • Who operates the site. A company named in the record is not the operator unless the record says so.
  • Who owns the site.
  • Cooling redundancy. Mentioned equipment is not a design rating.
  • Whether the record covers one building, a campus, or a suite, beyond the unit label the record itself uses.
No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000984

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Hoffman Estates, IL · Cook (Approximate location)

Roles

  • Operator: Microsoft

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: March 2021

    Provider-reported announcement date.

  • Status history: 2026-09-12 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 53 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $275 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 20 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Incentive reported by the source: Illinois Data Center Investment Program · Illinois · 2021 · $17,187,500 (as stated)

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-12

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →