Licensed lead · not independently verified · dcd-dir-000302

Compass Datacenters Hoffman Estates Campus

source-reported under construction

Compass Datacenters

3333 Beverly Road · Hoffman Estates · Cook County · Illinois · 60179

Capacity not statedSource updated 21 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Compass Datacenters Hoffman Estates Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Compass Datacenters
Address and locality
3333 Beverly Road · Hoffman Estates · Cook County · Illinois · 60179
Official metro area
Chicago-Naperville-Elgin, IL-IN
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Not stated
Source freshness
21 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000302

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
ComEdUtility as named by the provider.
Power source
GridProvider label.
Cooling
Not establishedThe provider reports water information but no cooling type.
Land area
200 acres (source-reported; parcel boundary not established)
Announced investment
$10 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
1,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Announced
13 June 2024Provider-reported announcement date.

Provider notes

Water. Compass describes 'advanced hybrid cooling that uses no water during operations'; the source does not identify the heat-rejection method precisely enough to classify.

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Cooling: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.

What the source record says

Five hyperscale buildings, each over 250,000 sq ft, planned on the roughly 200-acre former Sears headquarters campus. Compass closed on the property in September 2023 for a reported $194 million; the $10 billion figure is the projected total local investment at full build-out, not a single building's cost.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-09-12 · source-reported under construction

    Former seven-building Sears headquarters demolished; construction underway on the first of five planned hyperscale buildings.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID compass-hoffman-estates-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Federal registry record

What the U.S. EPA Facility Registry Service records at this street address, selected by DataCenterData from EPA’s ECHO Exporter. U.S. government data; not independently verified by DataCenterData. It does not establish who owns or operates the site, whether it is operating, its size, or whether the registration covers one building or a whole campus.

The U.S. EPA registry lists a facility registered as “COMPASS DATACENTERS ORD I LLC” at 3333 BEVERLY RD, HOFFMAN ESTATES, IL 60179.

Name as registered
COMPASS DATACENTERS ORD I LLC
Address as registered
3333 BEVERLY RD, HOFFMAN ESTATES, IL 60179
EPA registry ID
110071655144

One EPA registration; it may cover generators for a whole campus or a single building.

Registrations EPA lists for this ID

  • Clean Air Act registration (stationary sources, typically standby generators)

A registration says which program covers the site; it is not a permit for a data center and says nothing about compliance.

Open EPA’s detailed facility report (permits, inspections and compliance history as EPA records them) → EPA ECHO Exporter snapshot of 20 September 2026, retrieved 25 September 2026. ECHO data come from EPA and state systems; they can lag or contain errors, and EPA’s report is the current record. No compliance, inspection or enforcement value is copied here.

Matched to this licensed row on identical full street address. The licensed values above are unchanged.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000302

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 3333 Beverly Road, Hoffman Estates, IL 60179 · Cook (Approximate location)

Roles

  • Operator: Compass Datacenters

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 13 June 2024

    Provider-reported announcement date.

  • Status history: 2026-09-12 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 200 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: ComEd

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Not established

    The provider reports water information but no cooling type.

Permits, incentives, jobs and proceedings

  • Announced investment: $10 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 1,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-21

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →