Licensed lead · not independently verified · dcd-dir-000933

Meta Forest City Data Center

source-reported operational

Meta

Forest City · Rutherford County · North Carolina

Capacity not statedSource updated 15 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Meta Forest City Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Meta
Address and locality
Forest City · Rutherford County · North Carolina
Official metro area
Outside an official metropolitan boundary
Source-reported status
operational
Provider facility type
data center
Reported capacity
Not stated
Source freshness
15 October 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000933

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Duke EnergyUtility as named by the provider.
Power source
SolarProvider label.
Cooling
Not establishedThe provider reports water information but no cooling type.
Land area
150 acres (source-reported; parcel boundary not established)
Announced investment
$750 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
275 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: supportedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
2010Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Rutherford County investment-goals incentive grant · Rutherford County, NC · 2010 · $11.4 million (as stated) Open cited source →

Provider notes

Energy. Multiple independent outlets describe the Forest City data center as running on 100% renewable solar energy backed by five separate NC solar PPAs arranged through Duke Energy, consistent with Meta's site-specific procurement pattern at its other campuses.

Water. Consumed about 4 million gallons of water in 2024, per WUNC. Forest City's town manager said officials 'were shocked at how little water they used.'

Community. Forest City Town Manager Janet Mason described Meta as 'an excellent neighbor,' citing supplies and volunteer help distributed after Hurricane Helene, and noted the facility brought few of the negatives associated with data centers.

What the source record says

Meta (Facebook) data center on Social Circle, Forest City, Rutherford County — broke ground 2010, operational ~2012, a multi-parcel campus (parcels owned by 'Andale LLC', a Meta subsidiary confirmed via Meta's SEC 10-K Exhibit 21.1 and the Menlo Park HQ mailing address), with a third facility announced 2015. Meta reports $750M+ invested in North Carolina; the 408 Social Circle parcel alone carries $176.9M assessed building value (built, not land-bank). No site-specific IT-load MW is disclosed. Coordinates are a Rutherford County GIS parcel centroid, held approximate pending a raw-geometry re-pull; a follow-up GIS pass could upgrade precision to exact.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2012 · source-reported operational

    Broke ground 2010, operational ~2012; multi-parcel campus owned by Andale LLC (Meta subsidiary, SEC-confirmed); $750M+ NC investment.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID meta-forest-city-nc. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by Meta on its website (captured 25 September 2026)
Name as listed
Forest City
Address as published
Forest City, NC

Lifecycle status is not published for this listing.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Open the operator’s page → captured 25 September 2026

Matched to this licensed row on operator and city only: this is the one site the operator lists in this city and the only licensed row of that operator there, with reviewed subject identity; no address or boundary is established for this row.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000933

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Forest City, NC · Rutherford (Approximate location)

Roles

  • Operator: Meta

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2010

    Provider-reported announcement date.

  • Status history: 2012 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 150 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Duke Energy

    Utility as named by the provider.

  • Power source: Solar

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Not established

    The provider reports water information but no cooling type.

Permits, incentives, jobs and proceedings

  • Announced investment: $750 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 275 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: supported

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Rutherford County investment-goals incentive grant · Rutherford County, NC · 2010 · $11.4 million (as stated)

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-15

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →