Compass Datacenters Goodyear Campus

source-reported operational

Compass Datacenters

Goodyear · Maricopa County · Arizona

Planned 350 MWOperational 72 MWSource updated 10 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Compass Datacenters Goodyear Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
Compass Datacenters
Address and locality
Goodyear · Maricopa County · Arizona
Source-reported status
operational
Facility type
data center
Reported capacity
Operational: 72 MW; Planned: 350 MW (source-reported; boundary not independently verified)
Source freshness
10 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000301

What the source record says

225-acre campus at the northwest corner of Bullard Avenue and Yuma Road in Goodyear; eight data centers and over 1.8 million sq ft at full build-out, capable of 350 MW, with a 144 MW first master-plan series and a 72 MW opening phase. Distinct from the tracked Vantage Phoenix (Goodyear), Stream PHXA (Goodyear) and Microsoft Goodyear campuses — different operator and different parcel. Coordinates are the cited Bullard Avenue / Yuma Road intersection from OpenStreetMap; the campus lies to the northwest, so the pin is approximate.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2019-07-09 · source-reported operational

    Compass announced construction start on the first two data centers (72 MW combined IT load), with completion projected for Q4 2019.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID compass-goodyear-campus-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →