Project Red Clay

source-reported proposed

Cloverleaf Infrastructure

Lowndes County · Alabama

Reported planned 1,500 MWSource updated 28 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Project Red Clay.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Cloverleaf Infrastructure
Address and locality
Lowndes County · Alabama
Official metro area
Montgomery, AL
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 1,500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
28 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000264

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Alabama PowerUtility as named by the provider.
Power source
GridProvider label.
Cooling
Closed-loopProvider label.
Land area
800 acres (source-reported; parcel boundary not established)
Announced investment
$1.5 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
50 permanent · 1,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.

Provider notes

Energy. Route Fifty: "The facility has requested 1,500 megawatts of energy capacity from Alabama Power." WSFA reports the site sits "underneath a 500 kV electrical line" near the U.S. 80 / Alabama 21 intersection, and that the company was still finalizing power contracts as of 4 June 2026. Cloverleaf states on its project site that it will fund the necessary electric-service upgrades itself.

Water. Developer's project site states the building "will only use as much water as an office building on a day-to-day basis" and uses "a closed-loop cooling system requiring a one-time fill" — an explicitly recirculating circuit, hence closed_loop. Separately, a Cloverleaf representative told WSFA: "The most amount of water that we've asked for for consumption is 100,000 gallons of water per day." That is a requested maximum, not metered use, so it is NOT recorded as reportedMgd. …

Community. Route Fifty (25 Aug 2026): "About 350 people signed the group's petition demanding more transparency from the commission" — the group is Protect Lowndes County, which filed an open-records request on 27 July 2026 seeking project documentation and entity lists. WSFA (4 June 2026) records a resident telling the developer "We're from Lowndes County...Go home. We don't want you," alongside concerns about water use, power bills, noise and transparency. …

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Reported water use: The source note says 100,000 gallons per day is a requested maximum, not metered use, and was not meant to be recorded as reported water use.

What the source record says

SUBSIDY — CONFIRMED ABSENCE AS OF 24 JULY 2026: Yellowhammer News reports that no formal abatement request had been filed as of that date, and that the granting body would be the Lowndes County Commission. Under legislation signed by Gov. Kay Ivey in April 2026, an abatement approved before 1 January 2027 could run up to 30 years; after that date the maximum is 20 years. No dollar amount has been stated by any source, so no subsidies entry is recorded. NO NAMED TENANT: Cloverleaf is described by Yellowhammer as a Houston- and Seattle-based speculative developer assembling land for an unnamed future operator; aiClassification is therefore "likely", not confirmed. CONFLICTING FIGURES, recorded rather than reconciled: investment is "$1.5 billion" per WSFA and Route Fifty ("at least $1.5 billion in the development stage") but the developer's own site says "Over a $1 billion taxable investment in Lowndes County". Jobs: the developer's site says "Over 1,000 high-paying construction jobs" and "at least 50 full-time jobs" once operational; other coverage this run could not fetch cites 1,000-1,500 construction and over 200 permanent — the developer's own lower figures are recorded here. Footprint: "more than 800 acres in northeast Lowndes County" and "2.88 million square feet" (Yellowhammer). ZONING: reporting notes Cloverleaf could buy and develop here because Lowndes County has no planning or zoning authority. Coordinates are the OSM-confirmed U.S. 80 / AL 21 junction that WSFA names as the site vicinity — NOT a parcel boundary; the actual footprint is somewhere in northeast Lowndes County near that junction. Inside Climate News and WBHM coverage of this project returned HTTP 403 to both source retrieval and direct retrieval in this run and is therefore not cited.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cloverleaf-red-clay-lowndes-al. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000264

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • AL · Lowndes (Approximate location)

Roles

  • Operator: Cloverleaf Infrastructure

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

Area, acreage and buildings

  • Land area: 800 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 1,500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Alabama Power

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $1.5 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 50 permanent · 1,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-28

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →