This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Cloverleaf Project Open Sky.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Cloverleaf Infrastructure
- Address and locality
- Piedmont · Canadian County · Oklahoma
- Official metro area
- Oklahoma City, OK
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 1,500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 14 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000263
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Cooling
- Closed-loop
- Land area
- 630 acres (source-reported; parcel boundary not established)
- Announced jobs
- 300 permanent · 1,000 construction
- Community response
- Provider label: contested
Provider notes
Water. Project Open Sky is planned to use a closed-loop cooling system to greatly reduce water use.
Community. Piedmont Planning Commission recommended the City Council DENY the 'Project Open Sky' PUD rezoning pending additional information; Council vote rescheduled to late July 2026 — approval not yet granted as of this writing.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Announced investment: The source note reads the ‘over $1 billion taxable investment’ figure as a tax-abatement eligibility threshold, not a confirmed capital figure, and says it was not meant to be populated as investment.
What the source record says
630-acre proposed data campus near the Mathewson Substation, NW 248th Street, Piedmont (Canadian/Kingfisher county line) — part of a transmission corridor drawing multiple competing proposals; see beltline-piedmont-kingfisher-county-ok (this same batch), a separate, distinct 321-acre Beltline Energy site nearby — do not conflate despite both being in Piedmont. Closed-loop cooling planned. Cloverleaf recently withdrew from two Wisconsin data center projects after local opposition (context, not this project). Reported as 'over $1 billion taxable investment' (DCD) — read as a tax-abatement eligibility threshold rather than a confirmed capex figure, so not populated as investmentUsd.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Powered land company Cloverleaf proposing 633-acre data center in Canadian County, Oklahoma · Data Center Dynamics
- Piedmont planning commission encourages city council to deny data center proposal · KFOR
- A Transmission Line Built to Fix Grid Congestion Has Become Oklahoma's Hottest Data Center Address · Oklahoma Watch
- Cloverleaf Piedmont Campus (Project Open Sky) — Data Center Tracker · More Than Just Parks Data Center Tracker
- Commission urges council to deny Cloverleaf plan; Beltline Energy vote delayed for review · KOKH FOX 25
- Piedmont Data Center Proposal Heads To City Council Vote Tonight · Radio Oklahoma News
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cloverleaf-project-open-sky-piedmont-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000263
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Piedmont, OK · Canadian (Approximate location)
Roles
- Operator: Cloverleaf Infrastructure
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
Area, acreage and buildings
- Land area: 630 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 1,500 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Announced jobs: 300 permanent · 1,000 construction
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Community response: Provider label: contested
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.