CloudHQ Manassas MCC Campus

source-reported under construction

CloudHQ

Manassas · Prince William County · Virginia

Reported planned 382 MWSource updated 16 August 2026exact location (provider label) · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for CloudHQ Manassas MCC Campus.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
CloudHQ
Address and locality
Manassas · Prince William County · Virginia
Official metro area
Washington-Arlington-Alexandria, DC-VA-MD-WV
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 382 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
16 August 2026
Location precision
exact (provider label)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000257

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Dominion Energy (Clover Hill substation)Utility as named by the provider.
Power source
GridProvider label.
Cooling
AirProvider label.
Land area
100 acres (source-reported; parcel boundary not established)
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
mixed useCompute Atlas classification, not a DataCenterData finding.
Announced
2024Provider-reported announcement date.

Provider notes

Energy. Served via Dominion Energy's Clover Hill substation (300 MVA); a local distribution cooperative is reported to supply part of the campus. On-site backup is diesel only (28 generators at the first building).

Water. The first building (MCC1) uses a waterless air-side design — 152 Kyoto Cooling heat-wheel units driving PUE below 1.2; cooling for later buildings is not confirmed. The campus is within the Prince William Water service area.

Community. The campus opened in 2017 in a pre-designated data-center overlay zone away from the contested Manassas Battlefield corridor, and a 2025 proffer amendment for a new building was recommended for approval with no documented site-specific opposition. But Prince William County is a national data-center flashpoint — the nearby 'Digital Gateway' rezoning was voided by the Virginia Court of Appeals in 2026 after community litigation. CloudHQ is eligible for Virginia's data-center sales-and-use tax exemption, but state law bars disclosure of recipients and amounts.

What the source record says

Seven-building campus; 382 MW total planned critical IT load; 96 MW currently available. Coordinates sourced directly from CloudHQ website (38.71955, -77.49819). Connects via Manassas Fiber Highway to CloudHQ's MDC campus.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-01 · source-reported proposed

    Seven-building, 2.2 million sq ft campus planned south of Routes 28 and 234 intersection in Manassas

    Open cited source →

  2. 2025-06 · source-reported under construction

    MCC7 construction commenced mid-2025 (expected RFS Q3 2026); MCC5 site-plan approved and ready for development

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cloudhq-manassas-mcc-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by CloudHQ on its website (captured 26 September 2026)
Name as listed
MCC Campus
Operator’s facility code
MCC
Address as published
Manassas, VA

Lifecycle status is not published for this listing.

CloudHQ · MCC — Additional operator-reported details

  • Specifications and facility pages: CloudHQ MCC Campus — https://cloudhq.com/campus/mcc-campus/ campus scope

    Company-reported. Not independently verified.

    Open cited source → Captured 2026-09-26.

Company-reported values: facts compiled from operators’ public pages with citation. No page text is republished and no license is granted.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Open the operator’s page → captured 26 September 2026

Matched to this licensed row on the same specific operator facility page already cited by this record, with independently reviewed subject identity; no new address or boundary is established.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000257

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): mixed use

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Manassas, VA · Prince William (Exact location)

Roles

  • Operator: CloudHQ

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2024

    Provider-reported announcement date.

  • Status history: 2024-01 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-06 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 100 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 382 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Dominion Energy (Clover Hill substation)

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Air

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-16

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →