Licensed lead · not independently verified · dcd-dir-000461

Aurora AI Factory

source-reported under construction

Digital Realty

Manassas · Prince William County · Virginia

Reported planned 96 MWSource updated 9 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Aurora AI Factory.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Digital Realty
Address and locality
Manassas · Prince William County · Virginia
Official metro area
Washington-Arlington-Alexandria, DC-VA-MD-WV
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 96 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
9 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000461

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
GridProvider label.
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
28 October 2025Provider-reported announcement date.

Provider notes

Energy. Designed as a 'power-flexible' grid-connected facility rather than one relying on on-site generation; Emerald AI advisor Tyler Norris framed this explicitly as an alternative to on-site generation or storage.

What the source record says

Nvidia's 'Aurora AI factory', built by Digital Realty on an existing Digital Realty site near Nokesville Road and Prince William Parkway. Billed as the first facility built to a new industry certification for flexible power, developed by Nvidia with Emerald AI, EPRI and grid operator PJM, and deploying Emerald AI's Emerald Conductor software to shift AI workloads in response to grid conditions. Operator is recorded as Digital Realty (owner/builder); Nvidia is the named tenant. Status is held at under_construction because no source consulted confirms it has entered service, only that operations were 'slated for' the first half of 2026.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-10-30 · source-reported under construction

    DCD reported the 96MW Aurora data center as under construction, being built by Digital Realty and slated for operations in the first half of 2026.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID digital-realty-aurora-ai-factory-manassas-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000461

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Manassas, VA · Prince William (Approximate location)

Roles

  • Operator: Digital Realty

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 28 October 2025

    Provider-reported announcement date.

  • Status history: 2025-10-30 · source-reported under construction

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 96 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: Grid

    Provider label.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-09

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →