campus · WA · last checked 17 September 2026

Vantage Data Centers — Quincy Campus

Lifecycle label: operating; effective date not established Status evidence: Washington State Department of Ecology approval order dated 29 August 2023 Evidence: Independently source-linked Reuse: Reference only

Facts at a glance

Record ID
vantage-quincy-campus-wa
Record type
campus
Developer
Not named in the cited records
Operator
Vantage Data Centers
Owner
Owner of record not established
Tenant
Not named in the cited records
Capacity
49.5 MW backup generation permitted · campus scope
Ecology states a 49.5 MW facility total for installed emergency generators in Phases One and Two. The component figures printed in the order do not sum to that total. This is permitted backup generation, not critical IT capacity, utility service or measured load. Phase Three equipment is outside the stated total.
Location
2101 M Street NE, Quincy, WA
County: Grant County
exact — The exact street address, city and county are stated in Ecology Approval Order 23AQ-E056; exact does not mean a surveyed parcel or building footprint.
Physical scale
Physical scale: The order describes a three-phase campus: Buildings One and Two were in place and Building Three was planned. This is not a finding that three buildings were operating on the review date.

What the sources support

Ecology's order calls this an existing data center at 2101 M Street NE. It says Buildings One and Two were in place while Building Three remained a future phase. Operating therefore describes the campus, not every planned building.

Definitions: record units · roles · capacity boundaries · lifecycle stages.

What remains unknown

Sources

Record history

Record history · 29 August 2023 · DataCenterData review

vantage-quincy-campus-wa → Record

Why Ecology documented an existing two-phase campus and approved equipment for a third phase; the order is not evidence that the third building was complete or operating.

Evidence No additional evidence link; see the linked record or claim.

DataCenterData record added · 18 September 2026 · DataCenterData review

vantage-quincy-campus-wa → Publication

Why Added after independent re-reading of the state index and site-specific order, with backup generation kept separate from IT capacity.

Evidence No additional evidence link; see the linked record or claim.