Evidence ledger · operation reported, expansion continues

AWS New Carlisle: company-linked reports approach or exceed the headline promises. Independent reconciliation is next.

Indiana’s 2024 baseline was $11 billion and at least 1,000 jobs. An AWS-authored 2026 account reports $13.8 billion invested and “nearly 1,000” operations staff hired; a Chamber page lists 1,056 full-time AWS employees. Those are meaningful company-linked signals—but not yet a substitute for county compliance filings, payroll definitions, tax receipts or metered water.

Operator: Amazon Web ServicesPlace: St. Joseph County, IndianaProject Rainier siteLast checked: 12 September 2026

Current assessment

Later AWS-linked reporting puts investment above the 2024 baseline and staffing around it: “nearly 1,000” operations staff in AWS’s own account and 1,056 full-time employees on the Chamber page. Because those counts sit on either side of the 1,000-job baseline, permanent employment is classed as not yet verifiable. Confidence stops short of independently observed because the underlying annual county compliance filing, investment definition and payroll records have not been reconciled.

QuestionWhich 2024 AWS New Carlisle promises now have company-linked delivery reports, and which still lack independent public reconciliation?
FindingIEDC’s 25 April 2024 baseline was $11 billion investment and at least 1,000 new jobs, with performance-based state incentives (50-year sales-tax exemption plus programs totaling up to $98.3 million) and an AWS contribution of up to $7 million for road work. A 9 July 2026 AWS-authored account reports $13.8 billion invested, nearly 1,000 operations staff and 18 buildings vertical; the Chamber project page reports 1,056 full-time AWS employees. Independent CF-1, tax-receipt and meter reconciliation remain open.
$11B2024 investment baselineIEDC company plan
$13.8B2026 investment reportedAWS-linked account; scope needs reconciliation
1,000+2024 jobs baselineAnnounced new jobs
1,056full-time AWS employees reportedChamber-published; filing not yet obtained
18M gal/yrwater at full buildoutCompany estimate, not measured use

Claims

A verdict applies only to the wording shown.

Company claims are shown as stated; they are not findings.

Construction & status · AWS New Carlisle

Unknown

A question DataCenterData examined; no one is quoted.

Checked 12 September 2026 · Next check: no trigger recorded

Treating AWS Project Rainier's operation as proof that the full New Carlisle campus is complete.

What the evidence supports

Amazon says its multi-site Project Rainier compute cluster is operational and identifies New Carlisle as one site. That supports an operating milestone, not completion of every planned New Carlisle building or the full announced investment scope.

Biggest limitation

The remaining New Carlisle building count, buildout schedule and full-campus completion milestone are not…

Still unknown

The remaining New Carlisle building count, buildout schedule and full-campus completion milestone are not established in the reviewed source.

Confidence: medium · 1 source

Open full claim → History (2) →

Investment · AWS New Carlisle

Company claim

Said by AWS economic-development manager · company statement in South Bend Regional Chamber · 9 July 2026 →

Checked 11 September 2026 · Next check: annual project-specific CF-1 compliance filing

$11 billion baseline; $13.8 billion later reported

What the evidence supports

AWS economic-development manager said this on 9 July 2026. DataCenterData has not found an independent record that confirms or contradicts it; it is shown as the company’s statement, not as a finding either way.

Biggest limitation

Eligible-capital, placed-in-service and geographic scope.

Confidence: medium — company-reported · 3 sources

Open full claim →

Jobs · AWS New Carlisle

Company claim

Said by AWS economic-development manager · company statement in South Bend Regional Chamber · 9 July 2026 →

Checked 11 September 2026 · Next check: annual project-specific CF-1 compliance filing

At least 1,000 baseline; AWS's own July 2026 account says nearly 1,000 operations staff hired; an undated Chamber project page says 1,056 full-time AWS employees

What the evidence supports

AWS economic-development manager said this on 9 July 2026. DataCenterData has not found an independent record that confirms or contradicts it; it is shown as the company’s statement, not as a finding either way.

Biggest limitation

Project-specific CF-1, payroll definition, count date, residency and contractor treatment.

Confidence: medium — company/chamber-reported · 3 sources

Open full claim → History (1) →

Construction & status · AWS New Carlisle

Company claim

Said by AWS economic-development manager · company statement in South Bend Regional Chamber · 9 July 2026 →

Checked 11 September 2026 · Next check: annual project-specific CF-1 compliance filing

18 buildings reported vertical

What the evidence supports

AWS economic-development manager said this on 9 July 2026. DataCenterData has not found an independent record that confirms or contradicts it; it is shown as the company’s statement, not as a finding either way.

Biggest limitation

Final campus scope and completion.

Confidence: medium — company-reported · 1 source

Open full claim →

Taxes & incentives · AWS New Carlisle

Company claim

Said by AWS economic-development manager · company statement in South Bend Regional Chamber · 9 July 2026 →

Checked 11 September 2026 · Next check: annual project-specific CF-1 compliance filing

More than $1 billion over 35 years

What the evidence supports

AWS economic-development manager said this on 9 July 2026. DataCenterData has not found an independent record that confirms or contradicts it; it is shown as the company’s statement, not as a finding either way.

Biggest limitation

Annual gross taxes, abatements and net receipts.

Confidence: medium — company projection · 2 sources

Open full claim →

Water & cooling · AWS New Carlisle

Company claim

Said by AWS economic-development manager · company statement in South Bend Regional Chamber · 9 July 2026 →

Checked 11 September 2026 · Next check: annual project-specific CF-1 compliance filing

Approximately 18 million gallons per year at full buildout

What the evidence supports

AWS-authored/company-linked projection of about 18 million gallons per year at full buildout. Not permitted quantity, current metered use, or an independent delivery finding.

Biggest limitation

Permit quantity, current metered withdrawal/consumption, source-water mix and completion.

Confidence: medium — company projection · 1 source

Open full claim →

Community impact · AWS New Carlisle

Company claim

Said by AWS economic-development manager · company statement in South Bend Regional Chamber · 9 July 2026 →

Checked 11 September 2026 · Next check: annual project-specific CF-1 compliance filing

More than $1.5 million

What the evidence supports

AWS economic-development manager said this on 9 July 2026. DataCenterData has not found an independent record that confirms or contradicts it; it is shown as the company’s statement, not as a finding either way.

Biggest limitation

Recipient-level awards and payment records.

Confidence: medium — company-reported · 1 source

Open full claim →

Taxes & incentives · AWS New Carlisle

Supported

Said by the Indiana Economic Development Corporation · government record · 25 April 2024 →

Checked 12 September 2026 · Next check: annual project-specific CF-1 compliance filing

Up to $98.3 million is the sum of the four listed credit/grant programs and excludes the separately authorized 50-year sales-and-use-tax exemption, whose value is not stated here.

What the evidence supports

IEDC's 2024 announcement described up to $98.3 million across four listed credit/grant programs, a separate DATA sales-and-use-tax exemption, and up to $7 million for roads. Project 424567 portal records retrieved 12 September 2026 show HBI $55 million Executed with $0 paid/certified; EDGE $18.3 million Executed with $160,947 paid/certified; RTC $20 million in Post Term Reporting Period with $20 million paid/certified; and SEF $5 million Pending Accepted Offer. The DATA agreement lists an $800 million minimum qualified investment by 31 December 2038, an $11 billion extension test by 31 December 2043, and a maximum exemption deadline of 31 December 2073; section 6.D preserves IEDC discretion to deny, suspend, or extend the exemption if the $11 billion extension test is missed. These are portal fields and contract terms—not proof that benefits, jobs, or completed investment were independently observed.

Biggest limitation

Benefits earned, claimed and received;

Still unknown

Benefits earned, claimed and received; the meaning of DATA's $611,502,328 Paid/Certified to Date field; whether SEF is executed; RTC status meaning; independently observed jobs and placed-in-service investment.

Confidence: medium — government-described performance package · 7 sources

Open full claim → History (2) →

Water & cooling · AWS New Carlisle

Unknown

A question DataCenterData examined; no one is quoted.

Checked 11 September 2026 · Next check: no trigger recorded

Source-water mix, permitted quantity, and current metered withdrawal/consumption at AWS New Carlisle.

What the evidence supports

The reviewed AWS-authored account does not establish source-water mix, a permit quantity, or current metered withdrawal/consumption. The 18-million-gallon figure is a company full-buildout projection tracked on claim:aws-new-carlisle:water.

Biggest limitation

Source water, permitted quantity, current metered withdrawal/consumption, and completion.

Confidence: medium — AWS-authored opinion hosted by the South Bend Regional Chamber · 1 source

Open full claim →

History

Correction · 12 September 2026 · Software-assisted second check

aws-new-carlisle → Project status

Field Project status

From Partially supported

To Not independently verified

Why The operating Project Rainier milestone does not establish completion of every planned New Carlisle building or the full campus.

Evidence re-reading of the sources already cited on this claim; no new source.

Correction · 14 September 2026 · Editorial classification update

aws-new-carlisle → Project status

Field Project status

From Not independently verified

To Unknown

Why This card tests a common inference, not an attributed outside statement. The operating milestone still does not establish completion of every planned building or the full campus.

Evidence re-reading of the sources already cited on this claim; no new source.

Correction · 11 September 2026 · DataCenterData review

aws-new-carlisle → Permanent jobs

Field Permanent jobs

From At least 1,000 baseline; AWS's own July 2026 account says nearly 1,000 operations staff hired; an undated Chamber project page says 1,056 full-time AWS employees

To 2026-09-11: status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline (AWS op-ed: 'We have also hired nearly 1,000 operations staff so far'; Chamber page: '1,056 full-time AWS employees', undated), so the reviewed record does not support a delivery conclusion. Evidence level unchanged.

Evidence https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana →

Correction · 12 September 2026 · Software-assisted second check

aws-new-carlisle → State incentives

Field State incentives

From The contract split was held because no independent retrieval was recorded.

To Five Project 424567 portal instruments and the DATA agreement are cited with exact fields and contract locators.

Why The second review reproduced the portal records while preserving the difference between authorized terms, portal fields, and observed outcomes.

Evidence https://transparencyportal.iedc.in.gov/viewtaxgrantloancontract/8c0f68149feaee11904d001dd8306d4e →

Correction · 14 September 2026 · Editorial classification update

aws-new-carlisle → State incentives

Field State incentives

From Not independently verified

To Supported

Why The government announcement, portal fields and agreement support the carefully limited description of authorized terms. They do not prove delivery, jobs or completed investment.

Evidence re-reading of the sources already cited on this claim; no new source.

Correction · 12 September 2026 · DataCenterData review

aws-new-carlisle → Incentives commitments

Field Incentives commitments

To IEDC Project 424567 portal instruments and the DATA agreement were independently retrieved and separated by program, status, field name and contractual condition.

Evidence No additional evidence link; see the linked record or claim.

Correction · 11 September 2026 · DataCenterData review

aws-new-carlisle → Permanent jobs

Field Permanent jobs

To status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline, so the reviewed record does not support a delivery conclusion.

Evidence No additional evidence link; see the linked record or claim.

Timeline

Baseline announced

Indiana and AWS announce $11 billion, at least 1,000 jobs and a performance-based incentive package (sales-tax exemption plus up to $98.3M across headcount, training and redevelopment credit programs) and up to $7M road contribution.

Project Rainier operating update

Amazon identifies New Carlisle as part of its operating multi-site AI compute cluster. Full campus completion is not claimed.

AWS-linked delivery account published

AWS reports $13.8 billion invested, nearly 1,000 operations staff and 18 buildings vertical. The Chamber’s project page reports 1,056 full-time AWS employees.

Compliance evidence should follow

St. Joseph County’s tax-abatement program page states abatement recipients file annual CF-1 compliance forms. Project-specific filings are the next independent check (program page retrieval timed out during this pass; prior link retained).

Source evidence

Neutral readingThis may become a strong positive community-outcome case. The honest status today is “company-reported as delivered” for investment and “not yet verifiable” for permanent jobs—not “independently audited.” Publishing that distinction protects the record from both reflexive skepticism and promotional overclaiming.

Review date follows the aws-new-carlisle record check token; it is not advanced merely because claim classes were restated.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Reviewed record aws-new-carlisle

Campus · Amazon Web Services; New Carlisle is one site in the multi-site Project Rainier cluster. Independently reviewed record. Values are shown with their recorded basis.

Amazon says the multi-site Project Rainier cluster is operational and New Carlisle is one site. That does not prove completion of the full campus. Project demand and acreage remain unknown pending independent support.

Location and precision

  • New Carlisle, IN (Place centre, not the site)

Roles

  • Owner: Amazon Web Services
  • Developer: Amazon Web Services
  • Operator: Amazon Web Services; New Carlisle is one site in the multi-site Project Rainier cluster

Lifecycle

  • Recorded status: expanding

    Amazon says the multi-site Project Rainier compute cluster is operational and identifies New Carlisle as one site; this does not establish completion of the entire New Carlisle campus buildout.

Power capacity

  • Power detail: not stated in the reviewed state agreement summary

    Recorded with its stated kind; not a measured load and not comparable across records.

  • ISO / RTO: PJM
  • Serving utility: Indiana Michigan Power campus scope
  • Capacity — Not yet recorded here.

Cooling, water, PUE and WUE

  • Cooling and water: An AWS-authored 2026 account says outside air is used about 98% of the year and estimates approximately 18 million gallons annually at full buildout. This is not current metered use, a permit quantity or a potable-water figure. company design and projection + evidence gap

Permits, incentives, jobs and proceedings

  • Projected permanent jobs: at least 1,000 Announced jobs · announced baseline · campus scope

    AWS-linked 2026 reporting says nearly 1,000 operations staff; the Chamber project page says 1,056 full-time AWS employees. Project-specific CF-1 and payroll definitions are not yet reconciled.

    Announced job figures are not observed headcount. Different scopes stay separate.

  • Announced investment: $11 billion government-reported company baseline · original new carlisle campus scope

    $13.8 billion reported by AWS-linked 2026 accounts; eligible-capital and placed-in-service scope not independently reconciled

    Announced figure, not spending.

  • Incentives and commitments: Up to $98.3 million across four listed programs: HBI $55 million Executed, EDGE $18.3 million Executed, RTC $20 million in Post Term Reporting Period, and SEF $5 million Pending Accepted Offer in IEDC Project 424567 on 12 September 2026. The separate DATA exemption agreement lists an $800 million minimum qualified investment, an $11 billion extension test, and a maximum 2073 exemption deadline, with IEDC discretion under section 6.D to deny, suspend, or extend the exemption if the $11 billion extension test is missed. Portal Paid/Certified fields and contract terms are not treated as cash paid, benefits earned, jobs observed, or completed investment.

Sources, dates, limitations and corrections

  • Fields with recorded verification: operator; site relationship; operating milestone verified field list · campus scope

    Only the fields in this list are recorded as verified. A stored number outside this list is not treated as verified.

  • Sources: 6 cited sources, listed on this page
  • Evidence still needed: independently supported demand figure

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Next research question

  • Reconcile investment placed in service, observed employment, local tax flows, water permits and utility cost allocation.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Data + actions

Suggest a correction → Record ID aws-new-carlisle and the page are prefilled. Accepted material corrections appear on Changes.

Facility evidence across sources

Identity

Facility ID
dcd-fac-002451 (public id fac-002451)
Unit
campus
Name source
AWS — New Carlisle · DataCenterData reviewed record aws-new-carlisle
Evidence tier
reviewed

Other names

Operators and presences

2 statement(s) naming an operator or presence at this site unit, one row per source. A building with several tenants is one facility with several presence rows.

Operator of record (reviewed): Amazon Web Services; New Carlisle is one site in the multi-site Project Rainier cluster.

Operator as statedRoleUnitStated byDate
Amazon Web Services; New Carlisle is one site in the multi-site Project Rainier cluster
Family: Amazon Web Services
owner or operator (reviewed)campusDataCenterData reviewed record aws-new-carlisle
Amazon Web Services
Family: Amazon Web Services
named by this source (role not established)facilityCompute Atlas licensed discovery row dcd-dir-000068

Status by layer

LayerValueDateSource
Reviewed (DCD) · verified recordexpanding
Status basis: Amazon says the multi-site Project Rainier compute cluster is operational and identifies New Carlisle as one site; this does not establish completion of the entire New Carlisle campus buildout.
Latest source retrieval/capture date DataCenterData reviewed record aws-new-carlisle
Provider-reported (Compute Atlas)provider-reported: operationalProvider row updated
Provider-reported announcement date: 25 April 2024
Provider dates do not establish when this status began or whether it remains current.
Compute Atlas licensed discovery row dcd-dir-000068

Layers disagree; not reconciled. Each value is what that layer states; DataCenterData does not pick one.

Capacity by kind

Each row is one kind of figure from one source. Utility, generation, design, critical IT and floor-area figures measure different things; they are never summed or totalled.

KindValue and evidenceScope and timingDateSource
Provider-reported capacityOperational: 590 MW; Planned: 2,200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
provider-reported

compute atlas public projection

scope not statedProvider row updated Compute Atlas licensed discovery row dcd-dir-000068
Utility (provider note)Indiana Michigan Power (AEP)
provider-reported

compute atlas public projection · Utility as named by the provider.

scope not statedProvider row updated Compute Atlas licensed discovery row dcd-dir-000068
Land area (provider note)1,200 acres (source-reported; parcel boundary not established)
provider-reported

compute atlas public projection

scope not statedProvider row updated Compute Atlas licensed discovery row dcd-dir-000068

Power and cooling on record

Records are grouped by system and may describe requests or plans. A highlighted group does not prove every named component is installed or operating. Labels name the source, not a confidence rating. A part with no record here may still exist. Each part links to how it works.

  1. 1 Grid connection and substation Reviewed record

    Based on: Serving utility (reviewed) · See the evidence

  2. 2 Transformers and switchgear No record found yet
  3. 3 Backup generators No record found yet
  4. 4 Data halls and servers No record found yet
  5. 5 Cooling inside the building No record found yet
  6. 6 Heat out No record found yet
  7. 7 Water in and out No record found yet

Location

City
New Carlisle
County
St. Joseph
State
IN
Metro (CBSA)
South Bend-Mishawaka, IN-MI 43780

Coordinates 41.6978, -86.5117 · precision exact · Compute Atlas licensed discovery row dcd-dir-000068

Address as published by DataCenterData reviewed record aws-new-carlisle. No member source publishes a street address for this facility.

Facts

Quote-bound facts: each shows the value, the source address, the capture hash (first 12 characters; the full SHA-256 is in the page markup) and the capture date. The source's exact wording stays in the capture record and is not republished here; the capture hash binds it.

No quote-bound fact with a hashed capture is recorded for this facility.

Other values by layer

FieldValueLayer and basisDateSource
ownerAmazon Web ServicesReviewed (DCD) · reviewed recordLatest source retrieval/capture date date not statedDataCenterData reviewed record aws-new-carlisle
developerAmazon Web ServicesReviewed (DCD) · reviewed recordLatest source retrieval/capture date date not statedDataCenterData reviewed record aws-new-carlisle
utilityIndiana Michigan PowerReviewed (DCD) · reviewed recordLatest source retrieval/capture date date not statedDataCenterData reviewed record aws-new-carlisle
isoPJMReviewed (DCD) · reviewed recordLatest source retrieval/capture date date not statedDataCenterData reviewed record aws-new-carlisle
announced investment$11 billionReviewed (DCD) · reviewed recordLatest source retrieval/capture date date not statedDataCenterData reviewed record aws-new-carlisle
permanent jobsat least 1,000Reviewed (DCD) · reviewed recordLatest source retrieval/capture date date not statedDataCenterData reviewed record aws-new-carlisle
cooling waterAn AWS-authored 2026 account says outside air is used about 98% of the year and estimates approximately 18 million gallons annually at full buildout. This is not current metered use, a permit quantity or a potable-water figure.Reviewed (DCD) · reviewed recordLatest source retrieval/capture date date not statedDataCenterData reviewed record aws-new-carlisle
incentives commitmentsUp to $98.3 million across four listed programs: HBI $55 million Executed, EDGE $18.3 million Executed, RTC $20 million in Post Term Reporting Period, and SEF $5 million Pending Accepted Offer in IEDC Project 424567 on 12 September 2026. The separate DATA exemption agreement lists an $800 million minimum qualified investment, an $11 billion extension test, and a maximum 2073 exemption deadline, with IEDC discretion under section 6.D to deny, suspend, or extend the exemption if the $11 billion extension test is missed. Portal Paid/Certified fields and contract terms are not treated as cash paid, benefits earned, jobs observed, or completed investment.Reviewed (DCD) · reviewed recordLatest source retrieval/capture date date not statedDataCenterData reviewed record aws-new-carlisle
reported.energy.sourceGrid
Provider label.
provider-reported · compute atlas public projectionProvider row updated Compute Atlas licensed discovery row dcd-dir-000068
reported.water.cooling typeAir
Provider label.
provider-reported · compute atlas public projectionProvider row updated Compute Atlas licensed discovery row dcd-dir-000068
reported.investment usd$11 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
provider-reported · compute atlas public projectionProvider row updated Compute Atlas licensed discovery row dcd-dir-000068
reported.jobs400 permanent · 600 construction
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
provider-reported · compute atlas public projectionProvider row updated Compute Atlas licensed discovery row dcd-dir-000068
reported.community.statusProvider label: contested
Compute Atlas characterization, not a DataCenterData assessment.
provider-reported · compute atlas public projectionProvider row updated Compute Atlas licensed discovery row dcd-dir-000068
reported.ai classificationconfirmed
Compute Atlas classification, not a DataCenterData finding.
provider-reported · compute atlas public projectionProvider row updated Compute Atlas licensed discovery row dcd-dir-000068
reported.announced date25 April 2024
Provider-reported announcement date.
provider-reported · compute atlas public projectionProvider row updated Compute Atlas licensed discovery row dcd-dir-000068
facility typedata_centerprovider-reported · compute atlas public projectionProvider row updated Compute Atlas licensed discovery row dcd-dir-000068

Sources for the reviewed record

These citations belong to the linked reviewed records. They do not establish every figure or present-day operating status. Publication and retrieval dates are shown separately; an unstated date remains unknown.

Details still needed

25 fields in the shared profile are not established for this record. Each states why; missing information does not mean zero or absence.

  • Street address · not recorded for this field in the register
  • Postal code · not recorded for this field in the register
  • Operator-stated status · not recorded for this field in the register
  • Status in public records · not recorded for this field in the register
  • Critical IT capacity (MW) · not recorded for this field in the register
  • Requested utility capacity (MW) · not recorded for this field in the register
  • Reported total power (MW) · not recorded for this field in the register
  • Generation capacity (MW) · not recorded for this field in the register
  • Company-announced design capacity (MW) · not recorded for this field in the register
  • Floor area (sq ft) · not recorded for this field in the register
  • Data hall or IT floor area (sq ft) · not recorded for this field in the register
  • Cooling redundancy · not recorded for this field in the register
  • UPS redundancy · not recorded for this field in the register
  • Backup generator redundancy · not recorded for this field in the register
  • Tier design rating · not recorded for this field in the register
  • Opening year or expected opening year · not recorded for this field in the register
  • Network presence · not recorded for this field in the register
  • Service · not recorded for this field in the register
  • Certification or compliance claims · not recorded for this field in the register
  • Rack density · not recorded for this field in the register
  • Space or power availability · not recorded for this field in the register
  • Specifications and facility pages · not recorded for this field in the register
  • Business contact · not recorded for this field in the register
  • Public registration · not recorded for this field in the register
  • Fact supported by a source quotation · not recorded for this field in the register

Jurisdiction and policy actions

Policy actions are matched to this facility by jurisdiction (state, county, municipality or utility), never by the facility's name. A match means the action covers the place, not that it names or affects this facility.

Updates, corrections and review

Last checked

How often we re-check

We plan to re-check this facility every 90 days because it has a reviewed record whose status may still change. Next check due . The last-checked date is the newest evidence date among this facility's sources. Dates are measured against the newest input date, , not the day this page was built.

Corrections

  • · The government announcement, portal fields and agreement support the carefully limited description of authorized terms. They do not prove delivery, jobs or completed investment. details
  • · This card tests a common inference, not an attributed outside statement. The operating milestone still does not establish completion of every planned building or the full campus. details
  • · The operating Project Rainier milestone does not establish completion of every planned New Carlisle building or the full campus. details
  • · The second review reproduced the portal records while preserving the difference between authorized terms, portal fields, and observed outcomes. details
  • · IEDC Project 424567 portal instruments and the DATA agreement were independently retrieved and separated by program, status, field name and contractual condition. details
  • · 2026-09-11: status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline (AWS op-ed: 'We have also hired nearly 1,000 operations staff so far'; Chamber page: '1,056 full-time AWS employees', undated), so the reviewed record does not support a delivery conclusion. Evidence level unchanged. details
  • · status was 'supported-as-delivered' with value 'At least 1,000 baseline; 1,056 full-time AWS employees later reported'. The company-linked counts sit on either side of the baseline, so the reviewed record does not support a delivery conclusion. details

Related claims

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

How complete the facility register is

Rights for this record

For each populated field, the origin of the value shown on this page and the terms it carries. Values that are not redistributable may be read and cited here but are not relicensed.

Values marked Compute Atlas are adapted from Compute Atlas by Edward Kubiak under CC BY 4.0: Compute-infrastructure data from Compute Atlas by Edward Kubiak. DataCenterData did not independently verify them.

FieldSupplied byOriginLicenseAttributionRedistributable
current_nameDataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
aliases[0]Compute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
location.cityDataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
location.countyCompute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
location.city_keyDataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
location.stateDataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
location.cbsaCompute Atlas licensed discovery row dcd-dir-000068dcd originalCC-BY-4.0DataCenterDatayes
location.cbsa_nameCompute Atlas licensed discovery row dcd-dir-000068dcd originalCC-BY-4.0DataCenterDatayes
location.latCompute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
location.lonCompute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
location.source_precisionCompute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
presences[0]DataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
presences[1]Compute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
operator_of_recordDataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
status_by_layer[0]DataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
status_by_layer[1]Compute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
lifecycle_statusDataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
status_basisDataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
layer_values[0]DataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
layer_values[1]DataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
layer_values[2]DataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
layer_values[3]DataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
layer_values[4]DataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
layer_values[5]DataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
layer_values[6]DataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
layer_values[7]DataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano
layer_values[8]Compute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
layer_values[9]Compute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
layer_values[10]Compute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
layer_values[11]Compute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
layer_values[12]Compute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
layer_values[13]Compute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
layer_values[14]Compute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
layer_values[15]Compute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
layer_values[16]Compute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
layer_values[17]Compute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
layer_values[18]Compute Atlas licensed discovery row dcd-dir-000068compute atlasCC-BY-4.0Compute-infrastructure data from Compute Atlas by Edward Kubiakyes
reviewed_unknown_statements[0]DataCenterData reviewed record aws-new-carlisledcd reference onlyreference onlyDataCenterDatano