Licensed lead · not independently verified · dcd-dir-001419

T5@Silicon Valley

source-reported operational

T5 Data Centers

39800 Eureka Drive · Newark · Alameda County · California · 94560

Reported planned 49.1 MWReported operational 17 MWSource updated 2 August 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for T5@Silicon Valley.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
T5 Data Centers
Address and locality
39800 Eureka Drive · Newark · Alameda County · California · 94560
Official metro area
San Francisco-Oakland-Fremont, CA
Source-reported status
operational
Provider facility type
data center
Reported capacity
Operational: 17 MW; Planned: 49.1 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
2 August 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001419

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Land area
13.45 acres (source-reported; parcel boundary not established)
Announced
October 2020Provider-reported announcement date.

What the source record says

Operator corrected to T5 Data Centers, not Serverfarm: Serverfarm's own current locations page does not list a Newark/Silicon Valley property, and Serverfarm has acquired only one T5 property to date (El Segundo/LAX1, already tracked separately as serverfarm-lax1-el-segundo-ca) - not a company-wide rebrand. T5 Data Centers remains an active, independent company. The existing 128,000 SF/17MW building (built 2002 per county assessor record) was sold by Apple to T5 in an Aug 2020 ($30M) deed transfer, announced by T5 Oct 6 2020 alongside a disclosed plan to add 32.1MW/180,000 SF (49.1MW total target); no source confirms whether that expansion has completed. The $30M figure is a real-estate acquisition price for the existing building only, not development capex, so it is not recorded as investmentUsd. Apple as tenant is corroborated by secondary sources (an aggregator listing and a contractor's own portfolio page naming Apple independently) but not by a primary T5/Apple source, which refers only to 'a Fortune 100 enterprise' - flagged reported, not primary-confirmed. No AI/HPC/GPU-specific marketing found, so aiClassification is omitted. T5 markets this campus as 'Silicon Valley,' but Newark is geographically East Bay/Alameda County, not South Bay/Santa Clara County. Coordinates are a best-effort approximate estimate for the disclosed street address, not an independently geocoded parcel point - recommend a follow-up pass with a mapping source to confirm precisely.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2020-10-06 · source-reported operational

    T5 Data Centers announced acquisition of the existing, already-operational 128,000 SF / 17MW building from a Fortune 100 enterprise (identified as a former Apple facility by secondary sources — see notes), plus a planned 32.1MW/180,000 SF expansion (49.1MW total target).

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID t5-silicon-valley-newark-ca. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by Stream Data Centers on its website (captured 27 September 2026)
Name as listed
Santa Clara V
Address as published
39800 Eureka Dr., Newark, CA 94560

Lifecycle status is not published for this listing.

Floor area: 106,690 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 27 September 2026.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Matched to this licensed row on identical full street address.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001419

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 39800 Eureka Drive, Newark, CA 94560 · Alameda (Approximate location)

Roles

  • Operator: T5 Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: October 2020

    Provider-reported announcement date.

  • Status history: 2020-10-06 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 13.45 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Operational: 17 MW; Planned: 49.1 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-02

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →