This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Project Peach (CyrusOne Palmetto Data Center Campus).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- CyrusOne (joint venture with North Coweta Investors)
- Address and locality
- 300 Johnson Circle · Palmetto · Coweta County · Georgia
- Official metro area
- Atlanta-Sandy Springs-Roswell, GA
- Source-reported status
- permitted
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 23 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000379
The underlying provider record is retained. These notes add source-attributed context and flag conflicts; any withheld value is explained separately. They do not certify current operation.
- street: This street is provider-reported. DataCenterData has not independently resolved the earlier street-support review.
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Cooling
- Air
- Land area
- 320 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: opposed
Provider notes
Water. Reported as air-cooled rather than water-cooled.
Community. Residents packed the rezoning hearing in opposition; Palmetto's mayor asked commissioners to weigh the long-term cost to quality of life, environment and residents. Coweta County later imposed a six-month moratorium on new data center proposals.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Announced investment: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.
What the source record says
Eight buildings planned, completion projected 2036. Distinct from the tracked T5 @ Atlanta IV, which is also at Palmetto but a different operator, site and jurisdiction (Fulton County).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-04-15 · source-reported permitted
Coweta County Board of Commissioners approved the rezoning of ~320 acres from rural conservation to industrial by a 3-2 vote.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Coweta County residents concerned over proposed 320-acre data center · FOX 5 Atlanta
- How Data Center Developers Staked Their Claim in Rural Georgia · DeSmog
- Where Coweta's five proposed data centers stand · The Newnan Times-Herald
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cyrusone-project-peach-palmetto-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000379
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- 300 Johnson Circle, Palmetto, GA · Coweta (Approximate location)
Roles
- Operator: CyrusOne (joint venture with North Coweta Investors)
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported permitted
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2025-04-15 · source-reported permitted
Status history supplied by the source.
Area, acreage and buildings
- Land area: 320 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Cooling, water, PUE and WUE
- Cooling: Air
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Provider label: opposed
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-23
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.