This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Prologis 5853 Rue Ferrari.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Prologis
- Address and locality
- San Jose · Santa Clara County · California
- Official metro area
- San Jose-Sunnyvale-Santa Clara, CA
- Source-reported status
- permitted
- Provider facility type
- data center
- Reported capacity
- Planned: 49 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 21 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001173
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Pacific Gas & Electric (PG&E)
- Cooling
- Evaporative
- Land area
- 17.4 acres (source-reported; parcel boundary not established)
- Announced investment
- $25 million
- Community response
- Provider label: supported
- Announced
- December 2025
Provider notes
Community. Approved by the City of San Jose Dec 10, 2025 via a streamlined CEQA Addendum to the existing Mitigated Negative Declaration (SCH #2022010266).
What the source record says
Site Development Permit Amendment converting an existing ~300,000 sq ft warehouse (Parcel #678-05-057, City file H21-006/HA21-006-01) into server-ready R&D space, adding backup generators, transformers, and evaporative cooling chillers. Approved Dec 10 2025 via a Mitigated Negative Declaration w/ Addendum (no significant environmental impacts found); Notice of Determination posted Dec 18 2025. No tenant named yet — next steps are leasing, tenant-improvement permits, and utility interconnection before server halls activate. 140 jobs projected (not delivered) — omitted from jobs numeric. Distinct from the already-tracked prologis-silver-creek-valley-san-jose-ca record and prologis-stem-park-zanker-road-san-jose-ca (this same batch) — different parcels.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- 5853 Rue Ferrari Project (CEQAnet record, SCH #2022010266) · California State Clearinghouse (CEQAnet)
- South San Jose warehouse poised to become 49-megawatt data center · Hoodline
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
- Low Voltage Nation — "$25M San Jose R&D Facility" project spotlight
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID prologis-rue-ferrari-san-jose-ca. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001173
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- San Jose, CA · Santa Clara (Approximate location)
Roles
- Operator: Prologis
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported permitted
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: December 2025
Provider-reported announcement date.
Area, acreage and buildings
- Land area: 17.4 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 49 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Pacific Gas & Electric (PG&E)
Utility as named by the provider.
Cooling, water, PUE and WUE
- Cooling: Evaporative
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $25 million
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Community response: Provider label: supported
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-21
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.