This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Project Sail – Prologis Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Prologis
- Address and locality
- Newnan · Coweta County · Georgia
- Official metro area
- Atlanta-Sandy Springs-Roswell, GA
- Source-reported status
- permitted
- Provider facility type
- data center
- Reported capacity
- Planned: 900 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 14 October 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001171
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Georgia Power
- Power source
- Grid
- Cooling
- Evaporative
- Reported water use
- 6 million gallons per day (source-reported)
- Land area
- 800 acres (source-reported; parcel boundary not established)
- Announced investment
- $17 billion
- Community response
- Provider label: litigation
- AI-use label (provider)
- likely
- Announced
- April 2026
Provider notes
Energy. Georgia Power is the service-territory utility for Coweta County; the site is adjacent to Georgia Power's Plant Yates, and the developer states the load was included in Georgia Power's 2025 Integrated Resource Plan. Reporting indicates Georgia Power was not yet under contract to serve the campus as of mid-2026. No on-site generation reported.
Water. Expected to use 6 million gallons of water per day drawn from the Chattahoochee River
Community. Coweta County residents filed appeal in Coweta County Superior Court May 5, 2026 to reverse 3-2 rezoning vote. Separate eminent domain controversy: Georgia Power acquired easements on 330+ private properties for high-voltage transmission lines needed to serve new data centers.
What the source record says
Nine buildings, 4.3 million sq ft. End tenant not publicly identified; project marketed to hyperscalers. Rezoning includes decommissioning and site restoration plan requirement if dormant over one year. Coordinates are Newnan city centroid; actual site is along US-27 southwest of Newnan. A developer-commissioned fiscal study modeled roughly $488M in county and school property-tax abatements over 18 years, but the Coweta County Development Authority reported no incentive negotiations had occurred as of January 2025; no confirmed incentive agreement or job count has been published.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-05 · source-reported proposed
Prologis acquired site from original developer Atlas Development LLC; DRI review completed February 2024 for 200-acre precursor Pegasus proposal
- 2026-04-08 · source-reported permitted
Coweta County Board of Commissioners approved rezoning 3-2 for 800+ acres along US-27 near Newnan
- 2026-05-05 · source-reported permitted
Coweta County residents filed appeal in Superior Court seeking to reverse rezoning decision
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- $17B Project Sail data center project approved south of Atlanta · Atlanta Journal-Constitution
- Coweta Residents Sue to Block Project Sail Data Center · The Citizen
- Project Sail — developer project overview · Prologis / Atlas Development
- Coweta County approves Project Sail rezoning (Prologis) · Propmodo
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID prologis-project-sail-coweta-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001171
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): likely
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Newnan, GA · Coweta (Approximate location)
Roles
- Operator: Prologis
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported permitted
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: April 2026
Provider-reported announcement date.
- Status history: 2025-05 · source-reported proposed
Status history supplied by the source.
- Status history: 2026-04-08 · source-reported permitted
Status history supplied by the source.
- Status history: 2026-05-05 · source-reported permitted
Status history supplied by the source.
Area, acreage and buildings
- Land area: 800 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 900 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Georgia Power
Utility as named by the provider.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Evaporative
Provider label.
- Reported water use: 6 million gallons per day (source-reported)
Whether this is metered use, a permit limit or a request is not established; see the provider water note.
Permits, incentives, jobs and proceedings
- Announced investment: $17 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Community response: Provider label: litigation
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.