This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for 300 Holger Way Data Center (Menlo Equities conversion).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Menlo Equities (Holger Technology Partners LLC)
- Address and locality
- 300 Holger Way · San Jose · Santa Clara County · California · 95134
- Official metro area
- San Jose-Sunnyvale-Santa Clara, CA
- Source-reported status
- permitted
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 21 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001629
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 4.86 acres (source-reported; parcel boundary not established)
- Announced
- July 2026
What the source record says
Conversion of an existing ~97,800 sq ft research-and-development building in North San José to data center use (SUP SP25-029). Capacity not stated in the exemption notice.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-07-16 · source-reported permitted
City of San José filed a CEQA Notice of Exemption (Class 32 infill) for a Special Use Permit allowing data center use within the existing ~97,800 sq ft R&D building on a 4.86-acre site; The Real Deal reported city approval of the Menlo Equities office-to-data-center conversion in July 2026.
Sources and attribution
- CEQAnet SCH 2026070652 — SP25-029 / ER25-243 300 Holger Way Data Center Project, Notice of Exemption (posted 2026-07-16) · California Office of Land Use and Climate Innovation (CEQAnet)
- Tishman Speyer grabs Santa Clara land entitled for data center for $65M (2026-07-29) · The Real Deal
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID menlo-equities-300-holger-way-san-jose-ca. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
Operator’s own listing
What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.
- Name as listed
- San Jose Data Center
- Address as published
- 300 Holger Way, San Jose, CA
Lifecycle status is not published for this listing.
Site area: 4.86 acres.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001629
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- 300 Holger Way, San Jose, CA 95134 · Santa Clara (Approximate location)
Roles
- Operator: Menlo Equities (Holger Technology Partners LLC)
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported permitted
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: July 2026
Provider-reported announcement date.
- Status history: 2026-07-16 · source-reported permitted
Status history supplied by the source.
Area, acreage and buildings
- Land area: 4.86 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-21
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.