Licensed lead · not independently verified · dcd-dir-000991

Microsoft Mount Pleasant Data Center Campus

source-reported operational

Microsoft

Mount Pleasant · Racine County · Wisconsin

Reported planned 1,000 MWSource updated 14 September 2026exact location (provider label) · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Microsoft Mount Pleasant Data Center Campus.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Microsoft
Address and locality
Mount Pleasant · Racine County · Wisconsin
Official metro area
Racine-Mount Pleasant, WI
Source-reported status
operational
Provider facility type
data center
Reported capacity
Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
14 September 2026
Location precision
exact (provider label)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000991

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
We EnergiesUtility as named by the provider.
Power source
MixedProvider label.
Cooling
HybridProvider label.
Reported water use
0.702 million gallons per day (source-reported)Whether this is metered use, a permit limit or a request is not established; see the provider water note.
Land area
1,575 acres (source-reported; parcel boundary not established)
Announced investment
$3.3 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
550 permanent · 2,300 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
January 2025Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Wisconsin data center sales and use tax exemption · Wisconsin · 2023 Open cited source →
  • Village of Mount Pleasant incentive payments (~42% of Phase 1 revenue, capped at $5M/year) · Village of Mount Pleasant, Wisconsin · 2023 Open cited source →

Provider notes

Energy. Microsoft pledges to match every fossil-fuel kilowatt-hour one-for-one with carbon-free energy; a 250 MW solar project in Portage County is under construction to support the commitment. No on-site generation reported.

Water. Primarily dry cooling with evaporative backup only above ~85°F, running waterless for 90%+ of the year. 0.702 MGD is the regulatory-filing peak for the full campus (Phase 1 peak ~0.234 MGD); water is sourced from the city of Racine (Lake Michigan).

Community. Village and county leadership are supportive; Midwest Environmental Advocates sued the city of Racine over withheld water-usage records, and Marquette Law School polling found ~70% of Wisconsinites believe data-center costs outweigh benefits. The Microsoft deal itself carries no new public borrowing, against a Foxconn-era backdrop of local debt.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024 · source-reported proposed

    Site reported as part of Microsoft's $80B global AI data center investment plan

    Open cited source →

  2. 2025 · source-reported under construction

    Construction active; Racine County site confirmed

    Open cited source →

  3. 2026-08-04 · source-reported operational

    Microsoft announced June 23, 2026 that its first Fairwater datacenter facility in Mount Pleasant is fully operational (equipment came online April 2026), with nearly 550 employees on site; a second adjacent facility remains under construction (targeted 2028).

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID microsoft-mount-pleasant-wi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000991

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Mount Pleasant, WI · Racine (Exact location)

Roles

  • Operator: Microsoft

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: January 2025

    Provider-reported announcement date.

  • Status history: 2024 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025 · source-reported under construction

    Status history supplied by the source.

  • Status history: 2026-08-04 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 1,575 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: We Energies

    Utility as named by the provider.

  • Power source: Mixed

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Hybrid

    Provider label.

  • Reported water use: 0.702 million gallons per day (source-reported)

    Whether this is metered use, a permit limit or a request is not established; see the provider water note.

Permits, incentives, jobs and proceedings

  • Announced investment: $3.3 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 550 permanent · 2,300 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Wisconsin data center sales and use tax exemption · Wisconsin · 2023

    Whether the incentive was approved, awarded or received is not established.

  • Incentive reported by the source: Village of Mount Pleasant incentive payments (~42% of Phase 1 revenue, capped at $5M/year) · Village of Mount Pleasant, Wisconsin · 2023

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-14

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →