Microsoft Malaga Campus

source-reported under construction

Microsoft

Malaga Alcoa Highway · Malaga · Chelan County · Washington

Reported planned 288 MWSource updated 12 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Microsoft Malaga Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Microsoft
Address and locality
Malaga Alcoa Highway · Malaga · Chelan County · Washington
Official metro area
Outside an official metropolitan boundary
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 288 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
12 October 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000990

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Chelan County PUDUtility as named by the provider.
Power source
HydroProvider label.
Cooling
AirProvider label.
Land area
102.5 acres (source-reported; parcel boundary not established)
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
March 2023Provider-reported announcement date.

Provider notes

Energy. Carbon-free hydropower from Chelan PUD; 18 MW surplus hydropower through end of 2025, then long-term arrangement under utility energy marketing strategy. Under the June 2025 large-load contract, Microsoft will import new clean power from a third-party supplier for 2026-2040 (source undetermined); Chelan PUD is not obligated to serve its own hydropower. Microsoft funded the $86.5M Jumpoff Ridge substation.

Water. Newest AI datacenter buildings designed for no evaporative cooling water use per Microsoft Community-First blog. Earlier permit data shows ~83 gpm per building for fire suppression and employee use, not cooling.

Community. Chelan County PUD commissioners approved Microsoft's large-load power contract on June 16, 2025 (the first under the PUD's new large-load framework), structured so Microsoft bears the full cost and risk of its demand. Public comments centered on preserving reliability and affordable rates for existing customers, with some concern about service priority during energy shortfalls. No litigation.

What the source record says

Three-building campus at 5375 Malaga Alcoa Highway; two additional buildings possible by 2027 on demand. 288 MW figure from secondary aggregator Cleanview only; primary sources (DCD, Microsoft) do not specify MW capacity. Construction of first building began June 2023 per Microsoft Local blog; original statusHistory incorrectly dated under_construction to 2024-05. Expected operational 2026. Coordinates approximate for Malaga area on Malaga Alcoa Highway. A Building-1 permit cites ~72 peak-shift staff (a single-building figure, not a facility employment total); no confirmed total campus capital-expenditure figure is public. Go-live check 2026-08-08: NO citable operational date exists. Microsoft's own Malaga project page gives a first-phase construction window concluding in early 2026 but states plainly that "Completion of construction does not indicate datacenter operation/availability", and publishes no energization or service date. Secondary reporting that the first building would be "powered in August and fully operational by late 2026" is forward-looking and was not used to move the status. Remains under_construction. Microsoft's own Quincy/Central Washington community page states it "operates datacenters in Quincy and is developing new datacenters in Malaga and East Wenatchee" — positively confirming the site is not yet operational.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2022-04 · source-reported proposed

    Microsoft acquired 102.5 acres on Malaga Alcoa Highway for $9.2M across three parcels

    Open cited source →

  2. 2023-03 · source-reported permitted

    Permits filed for three data center buildings on Malaga Alcoa Highway; Chelan County

    Open cited source →

  3. 2023-06 · source-reported under construction

    Construction of first datacenter building commenced June 2023 per Microsoft Local blog; Jumpoff Ridge Substation also under construction on campus

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID microsoft-malaga-wa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000990

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Malaga Alcoa Highway, Malaga, WA · Chelan (Approximate location)

Roles

  • Operator: Microsoft

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: March 2023

    Provider-reported announcement date.

  • Status history: 2022-04 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2023-03 · source-reported permitted

    Status history supplied by the source.

  • Status history: 2023-06 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 102.5 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 288 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Chelan County PUD

    Utility as named by the provider.

  • Power source: Hydro

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Air

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-12

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →