Licensed lead · not independently verified · dcd-dir-000958

Metrobloks Southfield Data Center

source-reported permitted

Metrobloks

Southfield · Oakland County · Michigan

Reported planned 100 MWSource updated 7 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Metrobloks Southfield Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Metrobloks
Address and locality
Southfield · Oakland County · Michigan
Official metro area
Detroit-Warren-Dearborn, MI
Source-reported status
permitted
Provider facility type
data center
Reported capacity
Planned: 100 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
7 October 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000958

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Cooling
Closed-loopProvider label.
Land area
12.19 acres (source-reported; parcel boundary not established)
Announced jobs
35 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment.

Provider notes

Water. Approved site plan describes a closed loop water system with no ground water usage.

Community. Majority of public speakers opposed at the Dec 16, 2025 council hearing ('too many unknowns' -- Council President Charles Hicks); approved anyway 5-2.

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Provider energy note: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.
  • Power source: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.
  • Electric utility: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.
  • Announced investment: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.

What the source record says

217,030-230,000 sq ft, two-story building on ~12.19 acres of vacant land along Inkster Road north of 11 Mile Road, Southfield's northwest corner. Los Angeles-based developer Metrobloks (already tracked elsewhere in MO/IN/FL) has not completed a data center build anywhere yet per reporting. City of Southfield's own statement explicitly says the facility is NOT intended as 'an artificial intelligence repository' -- omitting aiClassification here rather than defaulting to 'likely'. City Council approved the site plan 5-2 on Dec 16, 2025; the city notes 'Approval of the proposal does not remove City oversight' -- still subject to further permitting. A named IT-engineer public commenter said the real target may be closer to 150 MW by groundbreaking; unconfirmed beyond that public comment. Closed-loop cooling planned, city says 'minimal long-term water use.' Coordinates are an approximate Inkster/11 Mile intersection estimate, not parcel-geocoded.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID metrobloks-southfield-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000958

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Southfield, MI · Oakland (Approximate location)

Roles

  • Operator: Metrobloks

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported permitted

    Provider status label; not a DataCenterData finding that the facility is operating.

Area, acreage and buildings

  • Land area: 12.19 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 100 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced jobs: 35 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-07

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →