Licensed lead · not independently verified · dcd-dir-000011

365 Data Centers Detroit (DT1)

source-reported operational

365 Data Centers

24660 Lahser Road · Southfield · Oakland County · Michigan · 48034

Capacity not statedSource updated 7 October 2026exact location (provider label) · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for 365 Data Centers Detroit (DT1).

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
365 Data Centers
Address and locality
24660 Lahser Road · Southfield · Oakland County · Michigan · 48034
Official metro area
Detroit-Warren-Dearborn, MI
Source-reported status
operational
Provider facility type
data center
Reported capacity
Not stated
Source freshness
7 October 2026
Location precision
exact (provider label)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000011

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

On-site generation
0.75 MW (source-reported)On-site figures often describe backup generators rather than primary supply; read the provider energy note.

Provider notes

Energy. The 0.75 MW figure is a 750 kW on-site diesel generator for backup/emergency power only (per the operator's own spec sheet), not primary or supplemental grid generation.

What the source record says

Standalone 12,000 sq ft colocation retrofit facility with a 160-ton cooling plant, 12-inch raised floor, and 3x203kW UPS units for AC customer backup (365datacenters.com spec sheet, retrieved 2026-09-13). A total facility power-capacity figure of ~4.5MW appears on third-party aggregator/broker sites (datacenterhawk, inflect) but was not confirmed against a primary source this session, so capacityMw is omitted rather than guessed. Coolant/water system details were not stated on the pages fetched, so `water` is omitted. Originally built in 2000 as a Switch & Data facility, acquired by Equinix in 2010, and sold to 365 Data Centers in November 2012 (per baxtel.com).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID 365-data-centers-dt1-southfield-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by 365 Data Centers on its website (captured 25 September 2026)
Name as listed
365 Data Centers’ Detroit Data Center
Address as published
24660 Lahser Road, Southfield, MI 48033

Lifecycle status is not published for this listing.

Floor area: 12,000 square feet. Scope facility · current or planned not stated. Floor area as stated for this facility. Not a different building or campus unless the scope says so. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 25 September 2026.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Matched to this licensed row on identical full street address.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000011

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 24660 Lahser Road, Southfield, MI 48034 · Oakland (Exact location)

Roles

  • Operator: 365 Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • On-site generation: 0.75 MW (source-reported)

    On-site figures often describe backup generators rather than primary supply; read the provider energy note.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-07

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →