Reported geography
Source-reported location for Lancium Clean Campus (Crusoe / Stargate Site 1).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Crusoe
- Address and locality
- Abilene · Taylor County · Texas
- Official metro area
- Abilene, TX
- Source-reported status
- operational
- Provider facility type
- data center
- Reported capacity
- Operational: 200 MW; Planned: 1,200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 21 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000856
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power supply description
- ERCOT grid; Crusoe has separately contracted 4.5 GW of natural gas supply for its broader multi-site AI buildout
- Power source
- Grid
- Land area
- 1,000 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: supported
- AI-use label (provider)
- mixed use
- Announced
- December 2021
Provider notes
Energy. Originally designed as an ERCOT-integrated demand-response/curtailable load site. On-site behind-the-meter natural-gas generation for this campus IS now confirmed via TCEQ Standard Permit Reg. 177263 — 10 turbines totaling 360.5 MW, 'for onsite use only for data centers and computing,' with a large expansion proposed — tracked separately as the power_generation record crusoe-abilene-onsite-generation-tx.
Community. City leadership has been enthusiastic about jobs and tax-base growth, framing the project locally as the city's largest single investment since Dyess Air Force Base; some nearby residents have raised construction-traffic concerns. No organized opposition campaign found.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Cooling: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.
What the source record says
Originally proposed Dec 2021 as Lancium's "Project Artemis" — a Bitcoin-mining and grid-demand-response campus using stranded/curtailed West Texas wind and solar power, with Lancium throttling load during ERCOT peak demand. Crusoe Energy has since built and operates AI/HPC data-center buildings on the site (publicly branded "Stargate Site 1"), with Oracle Cloud Infrastructure as the tenant hosting NVIDIA GPU clusters for OpenAI's Stargate project — Oracle sits contractually between Crusoe and OpenAI; no confirmed direct OpenAI-Crusoe lease. Lancium retains land/electrical-infrastructure ownership; Crusoe leases and operates part of an approximately 800-1,000-acre campus. First 2 of 8 planned buildings (~200+ MW) were operational by mid-2025; remaining 6 are under construction, with a full 1.2 GW build-out targeted for completion in 2026-2027 (dates vary by source). Construction-workforce and total AI-era investment figures conflict significantly across sources (reported range: 2,000-9,000 workers; an unverified ~$11.6B raise) and are not repeated here as fact. Coordinates are approximate (geocoded from a listed street address, not parcel-confirmed — the ~800-1,000-acre campus could place any specific building up to ~1-2 miles from this point). Also known as the Lancium Clean Campus.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2021-12 · source-reported proposed
Lancium announces "Project Artemis": a Bitcoin-mining/grid-demand-response campus with Taylor County and the City of Abilene, projected at up to $2.4B over 20 years, scaling 200 MW to 1 GW.
- 2024 · source-reported under construction
Crusoe Energy begins building AI/HPC data-center buildings on the Lancium campus, pivoting the site from its original crypto-mining plan toward multi-tenant AI hosting (publicly branded "Stargate Site 1").
- 2025-06 · source-reported operational
First 2 of 8 planned buildings (~200+ MW) operational, hosting Oracle Cloud Infrastructure GPU capacity for OpenAI's Stargate project.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Taylor County and City of Abilene Announce Historic Partnership With Lancium · PR Newswire
- Crusoe Begins Construction on Second Phase of Abilene, Texas Data Center Campus · Data Center Dynamics
- Crusoe Adds 4.5 GW of Natural Gas to Fuel AI, Expands Abilene Data Center to 1.2 GW · Data Center Frontier
- Lancium, Crusoe Executives Brief Abilene Leaders on Major Northside Investment · KTXS (Sinclair)
- City of Abilene, Taylor County to Build Billion-Dollar Data Center to Host Bitcoin Mining · Bitcoin Magazine
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID lancium-crusoe-abilene-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000856
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): mixed use
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Abilene, TX · Taylor (Approximate location)
Roles
- Operator: Crusoe
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported operational
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: December 2021
Provider-reported announcement date.
- Status history: 2021-12 · source-reported proposed
Status history supplied by the source.
- Status history: 2024 · source-reported under construction
Status history supplied by the source.
- Status history: 2025-06 · source-reported operational
Status history supplied by the source.
Area, acreage and buildings
- Land area: 1,000 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Operational: 200 MW; Planned: 1,200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power supply description: ERCOT grid; Crusoe has separately contracted 4.5 GW of natural gas supply for its broader multi-site AI buildout
Provider’s own description of the power supply; no separate utility field was supplied.
- Power source: Grid
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Provider label: supported
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-21
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.