Licensed lead · not independently verified · dcd-dir-000856

Lancium Clean Campus (Crusoe / Stargate Site 1)

source-reported operational

Crusoe

Abilene · Taylor County · Texas

Reported planned 1,200 MWReported operational 200 MWSource updated 21 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Lancium Clean Campus (Crusoe / Stargate Site 1).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Crusoe
Address and locality
Abilene · Taylor County · Texas
Official metro area
Abilene, TX
Source-reported status
operational
Provider facility type
data center
Reported capacity
Operational: 200 MW; Planned: 1,200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
21 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000856

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power supply description
ERCOT grid; Crusoe has separately contracted 4.5 GW of natural gas supply for its broader multi-site AI buildoutProvider’s own description of the power supply; no separate utility field was supplied.
Power source
GridProvider label.
Land area
1,000 acres (source-reported; parcel boundary not established)
Community response
Provider label: supportedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
mixed useCompute Atlas classification, not a DataCenterData finding.
Announced
December 2021Provider-reported announcement date.

Provider notes

Energy. Originally designed as an ERCOT-integrated demand-response/curtailable load site. On-site behind-the-meter natural-gas generation for this campus IS now confirmed via TCEQ Standard Permit Reg. 177263 — 10 turbines totaling 360.5 MW, 'for onsite use only for data centers and computing,' with a large expansion proposed — tracked separately as the power_generation record crusoe-abilene-onsite-generation-tx.

Community. City leadership has been enthusiastic about jobs and tax-base growth, framing the project locally as the city's largest single investment since Dyess Air Force Base; some nearby residents have raised construction-traffic concerns. No organized opposition campaign found.

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Cooling: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.

What the source record says

Originally proposed Dec 2021 as Lancium's "Project Artemis" — a Bitcoin-mining and grid-demand-response campus using stranded/curtailed West Texas wind and solar power, with Lancium throttling load during ERCOT peak demand. Crusoe Energy has since built and operates AI/HPC data-center buildings on the site (publicly branded "Stargate Site 1"), with Oracle Cloud Infrastructure as the tenant hosting NVIDIA GPU clusters for OpenAI's Stargate project — Oracle sits contractually between Crusoe and OpenAI; no confirmed direct OpenAI-Crusoe lease. Lancium retains land/electrical-infrastructure ownership; Crusoe leases and operates part of an approximately 800-1,000-acre campus. First 2 of 8 planned buildings (~200+ MW) were operational by mid-2025; remaining 6 are under construction, with a full 1.2 GW build-out targeted for completion in 2026-2027 (dates vary by source). Construction-workforce and total AI-era investment figures conflict significantly across sources (reported range: 2,000-9,000 workers; an unverified ~$11.6B raise) and are not repeated here as fact. Coordinates are approximate (geocoded from a listed street address, not parcel-confirmed — the ~800-1,000-acre campus could place any specific building up to ~1-2 miles from this point). Also known as the Lancium Clean Campus.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2021-12 · source-reported proposed

    Lancium announces "Project Artemis": a Bitcoin-mining/grid-demand-response campus with Taylor County and the City of Abilene, projected at up to $2.4B over 20 years, scaling 200 MW to 1 GW.

    Open cited source →

  2. 2024 · source-reported under construction

    Crusoe Energy begins building AI/HPC data-center buildings on the Lancium campus, pivoting the site from its original crypto-mining plan toward multi-tenant AI hosting (publicly branded "Stargate Site 1").

    Open cited source →

  3. 2025-06 · source-reported operational

    First 2 of 8 planned buildings (~200+ MW) operational, hosting Oracle Cloud Infrastructure GPU capacity for OpenAI's Stargate project.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID lancium-crusoe-abilene-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000856

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): mixed use

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Abilene, TX · Taylor (Approximate location)

Roles

  • Operator: Crusoe

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: December 2021

    Provider-reported announcement date.

  • Status history: 2021-12 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2024 · source-reported under construction

    Status history supplied by the source.

  • Status history: 2025-06 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 1,000 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Operational: 200 MW; Planned: 1,200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power supply description: ERCOT grid; Crusoe has separately contracted 4.5 GW of natural gas supply for its broader multi-site AI buildout

    Provider’s own description of the power supply; no separate utility field was supplied.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: supported

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-21

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →