Licensed lead · not independently verified · dcd-dir-001362

Stargate Abilene

source-reported operational

OpenAI / Oracle / Crusoe

Abilene · Taylor County · Texas

Capacity not established; source review excludes the published figureSource updated 21 September 2026exact location (provider label) · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Stargate Abilene.

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
OpenAI / Oracle / Crusoe
Address and locality
Abilene · Taylor County · Texas
Official metro area
Abilene, TX
Source-reported status
operational
Provider facility type
data center
Reported capacity
Not established; source review excludes the published figure
Source freshness
21 September 2026
Location precision
exact (provider label)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001362
Capacity held out of the public projection.

Measure or phase boundary remains unresolved in the captured provider context. New 300 MW operational value has no supporting row note or quantitative source label; preserve prior planned value pending explicit reread. The upstream row remains attributed below, but this value is not repeated as site capacity.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
AEP TexasUtility as named by the provider.
Power source
MixedProvider label.
Cooling
Closed-loopProvider label.
Land area
800 acres (source-reported; parcel boundary not established)
Announced investment
$3.5 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
21 January 2025Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • 85% property tax abatement (10-year reinvestment-zone agreement) · City of Abilene, Texas · 2025 Open cited source →
  • 85% property tax abatement (10-year reinvestment-zone agreement) · Taylor County, Texas · 2025 Open cited source →

Provider notes

Energy. Epoch AI: power currently supplied by a mix of on-site natural gas and grid power within AEP's service territory; operator has cited plans for on-site and regional green generation.

Water. Direct-to-chip liquid cooling with a zero-water-evaporation closed-loop system (per Measured AI, ~12,625 gallons per building per year). Mayor stated the facility would use less than 1% of Abilene's daily water. reportedMgd omitted — only per-building annual volume disclosed.

Community. Abilene City Council unanimously approved the abatement; Taylor County sought additional citizen input before finalizing. Residents raised concerns about energy reliability and possible groundwater contamination, and an opposition group (saveabilene.com) formed, alongside broad local economic support. The abatement contractually requires 357 permanent jobs at a minimum $57,600 salary.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-01-21 · source-reported proposed

    Announced as flagship Stargate campus at White House event; $500B national AI infrastructure commitment

    Open cited source →

  2. 2025-02 · source-reported under construction

    Ground broken; Crusoe providing infrastructure; ~4 of 8 buildings reported operational by late 2025

    Open cited source →

  3. 2026-09-08 · source-reported operational

    Buildings 1-4 of the 8-building campus are confirmed operational (509k H100-equivalents, 421 MW IT power) and running OpenAI training/inference on Oracle Cloud Infrastructure as of 2026-07-28; buildings 5-8 are structurally complete but not yet confirmed operational.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID stargate-abilene-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001362

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Abilene, TX · Taylor (Exact location)

Roles

  • Operator: OpenAI / Oracle / Crusoe

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 21 January 2025

    Provider-reported announcement date.

  • Status history: 2025-01-21 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-02 · source-reported under construction

    Status history supplied by the source.

  • Status history: 2026-09-08 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 800 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not established; source review excludes the published figure

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: AEP Texas

    Utility as named by the provider.

  • Power source: Mixed

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $3.5 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: 85% property tax abatement (10-year reinvestment-zone agreement) · City of Abilene, Texas · 2025

    Whether the incentive was approved, awarded or received is not established.

  • Incentive reported by the source: 85% property tax abatement (10-year reinvestment-zone agreement) · Taylor County, Texas · 2025

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-21

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →