Licensed lead · not independently verified · dcd-dir-000719

Google Lancaster Data Center

source-reported operational

Google

Lancaster · Fairfield County · Ohio

Capacity not statedSource updated 25 July 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Google Lancaster Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Google
Address and locality
Lancaster · Fairfield County · Ohio
Official metro area
Columbus, OH
Source-reported status
operational
Provider facility type
data center
Reported capacity
Not stated
Source freshness
25 July 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000719

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
South Central Power CompanyUtility as named by the provider.
Land area
120 acres (source-reported; parcel boundary not established)
Announced
May 2023Provider-reported announcement date.

What the source record says

105 Whiley Rd, Lancaster — distinct from Google's New Albany and Lima "Project BOSC" Ohio facilities. No site-specific investment figure is disclosed; Google has only published cumulative bundled totals across its New Albany+Lancaster+Columbus Ohio campuses ($1.7B Aug 2023, +$2.3B June 2024, ~$4.4B+ cumulative since 2019). No IT-load MW figure publicly disclosed. One 2024 article notes future buildings will "support Google's artificial intelligence innovation," but this is generic AI-as-one-of-many-workloads boilerplate rather than facility-specific AI/HPC/GPU marketing — no aiClassification set. Coordinates are an approximate geocode.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2021-08 · source-reported proposed

    120 acres at 105 Whiley Rd purchased for ~$4M as part of a larger 618-acre Columbus+Lancaster land bank.

    Open cited source →

  2. 2023-05 · source-reported under construction

    Groundbreaking May 4, 2023, announced alongside a separate Columbus, OH site as part of Google's "two new data centers in central Ohio."

    Open cited source →

  3. 2024 · source-reported operational

    First building completed and operational in 2024; additional buildings still under construction as of mid-2025.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID google-lancaster-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by Google on its website (captured 25 September 2026)
Name as listed
Lancaster
Address as published
Lancaster, OH

Lifecycle status is not published for this listing.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Open the operator’s page → captured 25 September 2026

Matched to this licensed row on operator and city only: this is the one site the operator lists in this city and the only licensed row of that operator there, with reviewed subject identity; no address or boundary is established for this row.

Independently reviewed match

This exact source identifier is linked to Google — Lancaster campus. The licensed row remains a separate discovery record.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000719

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Lancaster, OH · Fairfield (Approximate location)

Roles

  • Operator: Google

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: May 2023

    Provider-reported announcement date.

  • Status history: 2021-08 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2023-05 · source-reported under construction

    Status history supplied by the source.

  • Status history: 2024 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 120 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: South Central Power Company

    Utility as named by the provider.

Sources, dates, limitations and corrections

  • Provider update date: 2026-07-25

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →